X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684190808003

Well Details

Well ID: 0684190808003
Loading map...
Location: 00/08-08-068-19W4/3
Location Alias: 00/08-08-68-19 W4M
Location Alias 2: 00/08-08-068-19 W4/03
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 19
Section: 08
County/Municipality: Athabasca County
Well Name: RENAISSANCE GRASSLAND 8-8-68-19
Operator Name: Husky Oil Operations Limited
License Number: 0098102
License Date: 1982-10-20
License Status: Abandoned
Spud Date: 1982-10-25
Final Drill Date: 1982-10-27
Well Total Depth: 545.00 m
Surface Hole Latitude: 54.870940
Surface Hole Longitude: -112.857869

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-10-20 Obtained License
1982-10-27 Finished Drilling
1982-10-27 Well Mode changed to Drilled and Cased
1982-10-28 Drill Stem Test Performed
1982-10-29 Production Casing Operation Performed
1982-11-06 Perforation Treatment Performed - Jet Perforation
1983-03-01 Perforation Treatment Performed - Cement Squeeze
1983-03-01 Plug Back Performed
1983-03-02 Perforation Treatment Performed - Jet Perforation
1983-03-03 Well Began Production
1983-03-03 Well Fluid changed to Gas
1983-03-03 Well Mode changed to Flowing
1984-05-23 Perforation Treatment Performed - Cement Squeeze
1984-05-23 Plug Back Performed
1984-05-24 Perforation Treatment Performed - Jet Perforation
1984-05-24 Well Fluid changed to Gas
1984-05-24 Well Log Performed
1984-05-24 Well Mode changed to Abandoned Zone
1986-02-05 Perforation Treatment Performed - Cement Squeeze
1986-02-05 Plug Back Performed
1997-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-17 Plug Back Performed
1998-01-30 Well Abandoned
2011-01-25 Well Log Performed
2011-01-29 Perforation Treatment Performed - Jet Perforation
2011-02-02 Perforation Treatment Performed - Remedial Casing
2011-02-05 Well Log Performed
2011-02-09 Perforation Treatment Performed - Jet Perforation
2011-02-09 Perforation Treatment Performed - Remedial Casing
2011-02-12 Perforation Treatment Performed - Jet Perforation
2011-02-12 Well Log Performed
2011-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-13 Perforation Treatment Performed - Remedial Casing
2011-02-13 Plug Back Performed
2011-02-15 Perforation Treatment Performed - Jet Perforation
2011-02-20 Perforation Treatment Performed - Remedial Casing
2011-02-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-06 Perforation 513.00 515.00 13
2011-02-02 Remedial Casing Cementing 513.00 515.00 0
2011-02-09 Perforation 425.00 427.00 17
2011-02-09 Remedial Casing Cementing 425.00 427.00 0
2011-02-12 Perforation 361.00 364.00 17
2011-02-13 Remedial Casing Cementing 361.00 364.00 0
2011-02-13 Packing Device Capped w/Cement 375.00 444.00 0
2011-02-15 Perforation 315.00 321.00 17
2011-02-20 Remedial Casing Cementing 315.00 321.00 0
1982-11-06 Perforation 384.00 385.00 13
1983-03-01 Cement Squeeze 384.00 385.00 0
1983-03-02 Perforation 366.00 367.00 13
1984-05-23 Cement Squeeze 366.00 367.00 0
1984-05-24 Perforation 361.50 362.20 13
1986-02-05 Cement Squeeze 361.50 362.20 0
1997-03-17 Packing Device Capped w/Cement 492.00 500.00 0
2011-01-29 Perforation 513.00 515.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 3013 0.0 0.0 0.0
1984 88 0.0 0.0 0.0

For data sources see[5]

References