X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684233509000

Well Details

Well ID: 0684233509000
Loading map...
Location: 00/09-35-068-23W4/0
Location Alias: 00/09-35-68-23 W4M
Location Alias 2: 00/09-35-068-23 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 23
Section: 35
County/Municipality: Athabasca County
Well Name: RENAISSANCE BAPTISTE 9-35-68-23
Operator Name: Husky Oil Operations Limited
License Number: 0170590
License Date: 1994-09-20
License Status: Abandoned
Spud Date: 1995-01-13
Final Drill Date: 1995-01-15
Well Total Depth: 580.00 m
Surface Hole Latitude: 54.930509
Surface Hole Longitude: -113.392077

For data sources see[1][2]

Well History

Date Event
1994-09-20 Obtained License
1995-01-14 Surface Casing Operation Performed
1995-01-15 Finished Drilling
1995-01-15 Well Log Performed
1995-01-15 Well Mode changed to Drilled and Cased
1995-01-16 Drill Stem Test Performed
1995-01-17 Production Casing Operation Performed
1995-01-17 Rig Released
1995-01-21 Well Log Performed
1995-01-22 Perforation Treatment Performed - Jet Perforation
1995-01-22 Well Log Performed
1995-01-24 Perforation Treatment Performed - Cement Squeeze
1995-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-28 Plug Back Performed
1995-01-28 Well Log Performed
1995-01-29 Perforation Treatment Performed - Jet Perforation
1995-01-29 Well Log Performed
1995-02-19 Well Began Production
1995-02-19 Well Fluid changed to Gas
1995-02-19 Well Mode changed to Flowing
1999-02-08 Well Fluid changed to Gas
1999-02-08 Well Mode changed to Suspended
2009-02-17 Perforation Treatment Performed - Cement Squeeze
2009-02-17 Plug Back Performed
2019-02-20 Well Log Performed
2019-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-22 Perforation Treatment Performed - Jet Perforation
2019-02-22 Well Log Performed
2019-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-23 Perforation Treatment Performed - Remedial Casing
2019-02-23 Plug Back Performed
2019-02-23 Well Fluid changed to Gas
2019-02-23 Well Mode changed to Abandoned Zone
2019-03-05 Perforation Treatment Performed - Jet Perforation
2019-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-08 Perforation Treatment Performed - Remedial Casing
2019-03-10 Perforation Treatment Performed - Jet Perforation
2019-03-10 Well Log Performed
2019-03-12 Perforation Treatment Performed - Remedial Casing
2019-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-14 Perforation Treatment Performed - Jet Perforation
2019-03-14 Well Log Performed
2019-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-16 Perforation Treatment Performed - Remedial Casing
2019-03-20 Well Abandoned
2019-03-20 Well Fluid changed to Gas
2019-03-20 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-01-22 Perforation 568.50 570.50 13
2009-02-17 Cement Squeeze 404.00 405.50 0
2009-02-17 Cement Squeeze 401.50 402.50 0
2019-02-21 Packing Device Capped w/Cement 552.50 560.50 0
2019-02-22 Perforation 399.00 402.00 17
2019-02-22 Perforation 399.00 402.00 20
2019-02-23 Remedial Casing Cementing 399.00 402.00 0
2019-02-23 Packing Device Capped w/Cement 385.50 393.50 0
2019-03-05 Perforation 352.50 354.50 17
2019-03-05 Perforation 352.50 354.50 20
2019-03-08 Remedial Casing Cementing 352.50 354.50 0
1995-01-24 Cement Squeeze 568.50 570.50 0
2019-03-08 Packing Device Capped w/Cement 340.00 348.00 0
2019-03-10 Perforation 217.00 220.00 20
2019-03-10 Perforation 217.00 220.00 17
2019-03-12 Remedial Casing Cementing 217.00 220.00 0
2019-03-14 Packing Device Capped w/Cement 205.20 214.00 0
2019-03-14 Perforation 124.00 127.00 17
2019-03-14 Perforation 124.00 127.00 20
2019-03-16 Remedial Casing Cementing 124.00 127.00 0
2019-03-16 Packing Device Capped w/Cement 111.50 119.50 0
1995-01-28 Packing Device Capped w/Cement 552.00 560.00 0
1995-01-29 Perforation 425.50 427.00 13
1995-01-29 Perforation 401.50 402.50 13
1995-01-29 Perforation 404.00 405.50 13
1995-01-29 Perforation 413.50 415.50 13
2009-02-17 Cement Squeeze 425.50 427.00 0
2009-02-17 Cement Squeeze 413.50 415.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 5553 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-03-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References