X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685092214000

Well Details

Well ID: 0685092214000
Loading map...
Location: 00/14-22-068-09W5/0
Location Alias: 00/14-22-68-09 W5M
Location Alias 2: 00/14-22-068-09 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 09
Section: 22
County/Municipality: Big Lakes County
Well Name: CPEC SWANH 14-22-68-9
Operator Name: Ridgeback Resources Inc.
License Number: 0434965
License Date: 2011-07-07
License Status: Issued
Spud Date: 2011-07-30
Final Drill Date: 2011-08-17
Well Total Depth: 3739.00 m
Surface Hole Latitude: 54.893375
Surface Hole Longitude: -115.288569

For data sources see[1][2]

Well History

Date Event
2011-07-07 Obtained License
2011-08-01 Surface Casing Operation Performed
2011-08-06 Direction Drilling Operation Performed - Horizontal
2011-08-11 Intermediate Casing Operation Performed
2011-08-17 Finished Drilling
2011-08-17 Well Mode changed to Drilled and Cased
2011-08-19 Liner Casing Operation Performed
2011-08-20 Rig Released
2011-08-25 Well Log Performed
2011-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-04 Well Began Production
2011-10-04 Well Fluid changed to Crude Oil
2011-10-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-06 2036.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-17 Multi-Stage Fracture 3734.00 3734.10 0
2011-09-18 Multi-Stage Fracture 2845.40 2845.50 0
2011-09-18 Multi-Stage Fracture 2744.00 2744.10 0
2011-09-18 Multi-Stage Fracture 2644.20 2644.30 0
2011-09-18 Multi-Stage Fracture 2532.20 2532.30 0
2011-09-18 Multi-Stage Fracture 2431.50 2431.60 0
2011-09-17 Multi-Stage Fracture 3682.50 3682.60 0
2011-09-17 Multi-Stage Fracture 3584.60 3584.70 0
2011-09-17 Multi-Stage Fracture 3485.00 3485.10 0
2011-09-17 Multi-Stage Fracture 3373.90 3374.00 0
2011-09-17 Multi-Stage Fracture 3273.50 3273.60 0
2011-09-17 Multi-Stage Fracture 3170.70 3170.80 0
2011-09-17 Multi-Stage Fracture 3058.00 3058.10 0
2011-09-18 Multi-Stage Fracture 2958.00 2958.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 956 0.0 0.0 0.0
2012 5172 0.0 0.0 0.0
2013 226 0.0 0.0 0.0
2014 238 0.0 0.0 0.0
2015 1088 0.0 0.0 0.0
2016 768 0.0 0.0 0.0
2017 624 0.0 0.0 0.0
2018 1032 0.0 0.0 0.0
2019 24 0.0 0.0 0.0
2020 858 0.0 0.0 0.0

For data sources see[6]

References