X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685101610000

Well Details

Well ID: 0685101610000
Loading map...
Location: 00/10-16-068-10W5/0
Location Alias: 00/10-16-68-10 W5M
Location Alias 2: 00/10-16-068-10 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 10
Section: 16
County/Municipality: Big Lakes County
Well Name: Aquisition Oil SWANH 10-16-68-10
Operator Name: Acquisition Oil Corp.
License Number: 0020507
License Date: 1961-03-03
License Status: Suspension
Spud Date: 1961-03-05
Final Drill Date: 1961-03-26
Well Total Depth: 2453.60 m
Surface Hole Latitude: 54.888729
Surface Hole Longitude: -115.460036

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-03 Obtained License
1961-03-11 Drill Stem Test Performed
1961-03-26 Finished Drilling
1961-03-26 Well Mode changed to Drilled and Cased
1961-03-28 Production Casing Operation Performed
1961-04-11 Perforation Treatment Performed - Bullet Perforation
1961-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-04-15 Well Began Production
1961-04-15 Well Fluid changed to Crude Oil
1961-04-15 Well Mode changed to Flowing
1963-03-06 Well Fluid changed to Crude Oil
1963-03-06 Well Mode changed to Pumping
2000-03-31 Well Fluid changed to Crude Oil
2000-03-31 Well Mode changed to Suspended
2000-04-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-04-04 Plug Back Performed
2000-04-04 Well Fluid changed to Crude Oil
2000-04-04 Well Mode changed to Abandoned Zone
2000-04-05 Well Fluid changed to Crude Oil
2000-04-05 Well Mode changed to Abandoned and Whipstocked
2012-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-21 Plug Back Performed
2012-08-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-04-11 Bullet Perforation 2406.10 2407.90 7
1961-04-11 Bullet Perforation 2410.40 2414.00 7
1961-04-11 Bullet Perforation 2422.60 2423.80 7
1961-04-11 Bullet Perforation 2426.80 2429.30 7
1961-04-11 Bullet Perforation 2431.10 2434.10 7
1961-04-12 Acid Treatment 2406.10 2434.10 0
2000-04-04 Packing Device Capped w/Cement 2406.10 2434.00 0
2012-08-21 Packing Device Capped w/Cement 2261.00 2270.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8670 0.0 0.0 0.0
1968 8625 0.0 0.0 0.0
1969 8247 0.0 0.0 0.0
1970 8509 0.0 0.0 0.0
1971 8669 0.0 0.0 0.0
1972 8516 0.0 0.0 0.0
1973 6525 0.0 0.0 0.0
1974 7178 0.0 0.0 0.0
1975 8110 0.0 0.0 0.0
1976 996 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References