X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686021804000

Well Details

Well ID: 0686021804000
Loading map...
Location: 00/04-18-068-02W6/0
Location Alias: 00/04-18-68-02 W6M
Location Alias 2: 00/04-18-068-02 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 02
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: VELVET ELM 4-18-68-2
Operator Name: Velvet Energy Ltd.
License Number: 0480159
License Date: 2016-08-23
License Status: Amended
Spud Date: 2017-01-09
Final Drill Date: 2017-01-26
Well Total Depth: 4935.00 m
Surface Hole Latitude: 54.895717
Surface Hole Longitude: -118.341279

For data sources see[1][2]

Well History

Date Event
2016-08-23 Obtained License
2017-01-10 Surface Casing Operation Performed
2017-01-13 Direction Drilling Operation Performed - Deviate
2017-01-16 Direction Drilling Operation Performed - Horizontal
2017-01-18 Intermediate Casing Operation Performed
2017-01-26 Finished Drilling
2017-01-26 Well Mode changed to Drilled and Cased
2017-01-27 Well Log Performed
2017-01-30 Liner Casing Operation Performed
2017-01-31 Perforation Treatment Performed - Open-Hole Completion
2017-01-31 Rig Released
2017-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-07 Well Began Production
2017-03-07 Well Fluid changed to Crude Oil
2017-03-07 Well Mode changed to Flowing
2017-06-12 Well Fluid changed to Crude Oil
2017-06-12 Well Mode changed to Gas Lift
2019-10-01 Well Fluid changed to Crude Oil
2019-10-01 Well Mode changed to Suspended

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-09 Beaver Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-13 1797.00 Deviate (5 - 79 degrees)
2017-01-16 2293.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-31 Open Hole/Barefoot Completion 4930.00 4935.00 0
2017-02-18 Multi-Stage Fracture 4240.70 4240.80 0
2017-02-18 Multi-Stage Fracture 4188.00 4188.10 0
2017-02-18 Multi-Stage Fracture 4109.90 4110.00 0
2017-02-18 Multi-Stage Fracture 4031.90 4032.00 0
2017-02-18 Multi-Stage Fracture 3941.10 3941.20 0
2017-02-18 Multi-Stage Fracture 3863.10 3863.20 0
2017-02-18 Multi-Stage Fracture 3797.60 3797.70 0
2017-02-18 Multi-Stage Fracture 3719.60 3719.70 0
2017-02-18 Multi-Stage Fracture 3641.60 3641.70 0
2017-02-19 Multi-Stage Fracture 3563.50 3563.60 0
2017-02-18 Multi-Stage Fracture 4832.30 4832.40 0
2017-02-19 Multi-Stage Fracture 3485.50 3485.60 0
2017-02-19 Multi-Stage Fracture 3394.70 3394.80 0
2017-02-19 Multi-Stage Fracture 3329.30 3329.40 0
2017-02-19 Multi-Stage Fracture 3251.30 3251.40 0
2017-02-19 Multi-Stage Fracture 3160.60 3160.70 0
2017-02-19 Multi-Stage Fracture 3095.20 3095.30 0
2017-02-19 Multi-Stage Fracture 3017.20 3017.30 0
2017-02-19 Multi-Stage Fracture 2939.10 2939.20 0
2017-02-19 Multi-Stage Fracture 2861.00 2861.10 0
2017-02-19 Multi-Stage Fracture 2782.90 2783.00 0
2017-02-18 Multi-Stage Fracture 4710.80 4710.90 0
2017-02-19 Multi-Stage Fracture 2704.80 2704.90 0
2017-02-19 Multi-Stage Fracture 2626.70 2626.80 0
2017-02-19 Multi-Stage Fracture 2548.60 2548.70 0
2017-02-19 Multi-Stage Fracture 2470.50 2470.60 0
2017-02-18 Multi-Stage Fracture 4632.80 4632.90 0
2017-02-18 Multi-Stage Fracture 4580.40 4580.50 0
2017-02-18 Multi-Stage Fracture 4515.00 4515.10 0
2017-02-18 Multi-Stage Fracture 4449.60 4449.70 0
2017-02-18 Multi-Stage Fracture 4384.20 4384.30 0
2017-02-18 Multi-Stage Fracture 4318.80 4318.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-18 2017-02-19 2,183 5,463 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 64742-81-0 100 73.4268 N/A
20/40 EconoProp Calfrac Ceramic materials and wares. chemicals 66402-68-4 100 2.1891 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 19.2933 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.4375 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0098 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0098 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0161 N/A
Water 7732-18-5 100 0.0161 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0647 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0689 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0689 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 4.2751 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.2182 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-18 2017-02-10 Surface Water - River 7388
2017-02-10 2017-02-10 Municipal Water 40

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4109 0.0 0.0 0.0
2018 4026 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-31 No Incident Encountered 0.00 0.00
2017-03-08 No Incident Encountered 0.00 0.00

For data sources see[10]

References