X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686031113000

Well Details

Well ID: 0686031113000
Loading map...
Location: 00/13-11-068-03W6/0
Location Alias: 00/13-11-68-03 W6M
Location Alias 2: 00/13-11-068-03 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 03
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: VELVET HZ ELM 13-11-68-3
Operator Name: Velvet Energy Ltd.
License Number: 0490315
License Date: 2018-08-03
License Status: Amended
Spud Date: 2018-12-04
Final Drill Date: 2018-12-12
Well Total Depth: 4400.00 m
Surface Hole Latitude: 54.861369
Surface Hole Longitude: -118.327787

For data sources see[1][2]

Well History

Date Event
2018-08-03 Obtained License
2018-12-05 Surface Casing Operation Performed
2018-12-07 Direction Drilling Operation Performed - Deviate
2018-12-08 Direction Drilling Operation Performed - Horizontal
2018-12-08 Well Log Performed
2018-12-09 Well Log Performed
2018-12-12 Finished Drilling
2018-12-12 Well Mode changed to Drilled and Cased
2018-12-14 Production Casing Operation Performed
2018-12-14 Rig Released
2019-01-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-28 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-29 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-30 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-04 Well Began Production
2019-03-04 Well Fluid changed to Crude Oil
2019-03-04 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-04 Horizon Drilling Inc. 50 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-12-07 1943.60 Deviate (5 - 79 degrees)
2018-12-08 2309.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-26 Multi-Stage Fracture 4345.00 4345.10 0
2019-01-26 Multi-Stage Fracture 4180.80 4180.90 0
2019-01-29 Multi-Stage Fracture 2575.90 2576.00 0
2019-01-29 Multi-Stage Fracture 2558.00 2558.10 0
2019-01-29 Multi-Stage Fracture 2539.70 2539.80 0
2019-01-29 Multi-Stage Fracture 2523.00 2523.10 0
2019-01-29 Multi-Stage Fracture 2506.00 2506.10 0
2019-01-29 Multi-Stage Fracture 2487.70 2487.80 0
2019-01-29 Multi-Stage Fracture 2469.30 2469.40 0
2019-01-29 Multi-Stage Fracture 2451.40 2451.50 0
2019-01-29 Multi-Stage Fracture 2433.70 2433.80 0
2019-01-29 Multi-Stage Fracture 2417.10 2417.20 0
2019-01-26 Multi-Stage Fracture 4165.20 4165.30 0
2019-01-29 Multi-Stage Fracture 2398.70 2398.80 0
2019-01-30 Multi-Stage Fracture 2381.20 2381.30 0
2019-01-30 Multi-Stage Fracture 2362.80 2362.90 0
2019-01-30 Multi-Stage Fracture 2344.50 2344.60 0
2019-01-26 Multi-Stage Fracture 4146.70 4146.80 0
2019-01-26 Multi-Stage Fracture 4128.40 4128.50 0
2019-01-26 Multi-Stage Fracture 4110.10 4110.20 0
2019-01-26 Multi-Stage Fracture 4092.80 4092.90 0
2019-01-26 Multi-Stage Fracture 4074.60 4074.70 0
2019-01-26 Multi-Stage Fracture 4056.30 4056.40 0
2019-01-26 Multi-Stage Fracture 4038.00 4038.10 0
2019-01-26 Multi-Stage Fracture 4019.60 4019.70 0
2019-01-26 Multi-Stage Fracture 4327.00 4327.10 0
2019-01-26 Multi-Stage Fracture 4002.60 4002.70 0
2019-01-26 Multi-Stage Fracture 3984.50 3984.60 0
2019-01-26 Multi-Stage Fracture 3966.30 3966.40 0
2019-01-26 Multi-Stage Fracture 3948.00 3948.10 0
2019-01-26 Multi-Stage Fracture 3930.80 3930.90 0
2019-01-27 Multi-Stage Fracture 3912.60 3912.70 0
2019-01-27 Multi-Stage Fracture 3894.50 3894.60 0
2019-01-27 Multi-Stage Fracture 3876.10 3876.20 0
2019-01-27 Multi-Stage Fracture 3858.70 3858.80 0
2019-01-27 Multi-Stage Fracture 3840.30 3840.40 0
2019-01-26 Multi-Stage Fracture 4309.10 4309.20 0
2019-01-27 Multi-Stage Fracture 3822.00 3822.10 0
2019-01-27 Multi-Stage Fracture 3803.70 3803.80 0
2019-01-27 Multi-Stage Fracture 3785.80 3785.90 0
2019-01-27 Multi-Stage Fracture 3767.90 3768.00 0
2019-01-27 Multi-Stage Fracture 3749.40 3749.50 0
2019-01-27 Multi-Stage Fracture 3731.10 3731.20 0
2019-01-27 Multi-Stage Fracture 3712.80 3712.90 0
2019-01-27 Multi-Stage Fracture 3695.10 3695.20 0
2019-01-27 Multi-Stage Fracture 3678.00 3678.10 0
2019-01-27 Multi-Stage Fracture 3661.60 3661.70 0
2019-01-26 Multi-Stage Fracture 4287.90 4288.00 0
2019-01-27 Multi-Stage Fracture 3643.20 3643.30 0
2019-01-27 Multi-Stage Fracture 3624.80 3624.90 0
2019-01-27 Multi-Stage Fracture 3606.80 3606.90 0
2019-01-27 Multi-Stage Fracture 3588.40 3588.50 0
2019-01-27 Multi-Stage Fracture 3570.70 3570.80 0
2019-01-27 Multi-Stage Fracture 3552.30 3552.40 0
2019-01-27 Multi-Stage Fracture 3534.80 3534.90 0
2019-01-27 Multi-Stage Fracture 3516.40 3516.50 0
2019-01-27 Multi-Stage Fracture 3499.70 3499.80 0
2019-01-28 Multi-Stage Fracture 3484.40 3484.50 0
2019-01-26 Multi-Stage Fracture 4271.40 4271.50 0
2019-01-28 Multi-Stage Fracture 3466.60 3466.70 0
2019-01-28 Multi-Stage Fracture 3448.30 3448.40 0
2019-01-28 Multi-Stage Fracture 3431.70 3431.80 0
2019-01-28 Multi-Stage Fracture 3413.70 3413.80 0
2019-01-28 Multi-Stage Fracture 3395.40 3395.50 0
2019-01-28 Multi-Stage Fracture 3377.40 3377.50 0
2019-01-28 Multi-Stage Fracture 3359.50 3359.60 0
2019-01-28 Multi-Stage Fracture 3338.90 3339.00 0
2019-01-28 Multi-Stage Fracture 3320.50 3320.60 0
2019-01-28 Multi-Stage Fracture 3303.90 3304.00 0
2019-01-26 Multi-Stage Fracture 4253.10 4253.20 0
2019-01-28 Multi-Stage Fracture 3285.80 3285.90 0
2019-01-28 Multi-Stage Fracture 3267.40 3267.50 0
2019-01-28 Multi-Stage Fracture 3249.10 3249.20 0
2019-01-28 Multi-Stage Fracture 3230.80 3230.90 0
2019-01-28 Multi-Stage Fracture 3212.40 3212.50 0
2019-01-28 Multi-Stage Fracture 3194.10 3194.20 0
2019-01-28 Multi-Stage Fracture 3176.00 3176.10 0
2019-01-28 Multi-Stage Fracture 3158.30 3158.40 0
2019-01-28 Multi-Stage Fracture 3140.00 3140.10 0
2019-01-28 Multi-Stage Fracture 3121.60 3121.70 0
2019-01-26 Multi-Stage Fracture 4235.80 4235.90 0
2019-01-28 Multi-Stage Fracture 3103.30 3103.40 0
2019-01-28 Multi-Stage Fracture 3086.80 3086.90 0
2019-01-28 Multi-Stage Fracture 3069.00 3069.10 0
2019-01-28 Multi-Stage Fracture 3052.50 3052.60 0
2019-01-28 Multi-Stage Fracture 3034.10 3034.20 0
2019-01-28 Multi-Stage Fracture 3017.60 3017.70 0
2019-01-28 Multi-Stage Fracture 2999.20 2999.30 0
2019-01-28 Multi-Stage Fracture 2982.50 2982.60 0
2019-01-28 Multi-Stage Fracture 2964.20 2964.30 0
2019-01-28 Multi-Stage Fracture 2945.80 2945.90 0
2019-01-26 Multi-Stage Fracture 4217.50 4217.60 0
2019-01-29 Multi-Stage Fracture 2927.80 2927.90 0
2019-01-29 Multi-Stage Fracture 2909.90 2910.00 0
2019-01-29 Multi-Stage Fracture 2893.90 2894.00 0
2019-01-29 Multi-Stage Fracture 2875.50 2875.60 0
2019-01-29 Multi-Stage Fracture 2858.30 2858.40 0
2019-01-29 Multi-Stage Fracture 2839.90 2840.00 0
2019-01-29 Multi-Stage Fracture 2823.40 2823.50 0
2019-01-29 Multi-Stage Fracture 2805.00 2805.10 0
2019-01-29 Multi-Stage Fracture 2788.10 2788.20 0
2019-01-29 Multi-Stage Fracture 2769.80 2769.90 0
2019-01-26 Multi-Stage Fracture 4199.10 4199.20 0
2019-01-29 Multi-Stage Fracture 2753.20 2753.30 0
2019-01-29 Multi-Stage Fracture 2736.00 2736.10 0
2019-01-29 Multi-Stage Fracture 2718.70 2718.80 0
2019-01-29 Multi-Stage Fracture 2700.30 2700.40 0
2019-01-29 Multi-Stage Fracture 2683.70 2683.80 0
2019-01-29 Multi-Stage Fracture 2667.00 2667.10 0
2019-01-29 Multi-Stage Fracture 2649.00 2649.10 0
2019-01-29 Multi-Stage Fracture 2630.60 2630.70 0
2019-01-29 Multi-Stage Fracture 2612.10 2612.20 0
2019-01-29 Multi-Stage Fracture 2593.80 2593.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-26 2019-01-30 2,235 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 79.0017 N/A
Slickwater Schlumberger Quartz. Crystalline silica 14808-60-7 100 20.9294 N/A
Slickwater Schlumberger Energizing Fluid 1.2.4 Trimethylbenzene (impurity) 95-63-6 100 0 N/A
2-Propen-1-aminium. N.N-dimethyl-N-2-propen-1-yl-. chloride 26062-79-3 100 0 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid (impurity) 64-19-7 100 0.0009 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acetophenone 98-86-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.012 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0 N/A
Alcohol. C9-C11. Ethoxylated 68439-46-3 100 0 N/A
Alcohols. C10-16. ethoxylated 68002-97-1 100 0 N/A
Alcohols. C7-9-iso-. C8-rich. ethoxylated 78330-19-5 100 0 N/A
Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Amines. tallow alkyl. ethoxylated 61791-26-2 100 0 N/A
Benzenemethanaminium. N.N-dimethyl-N tetradecyl-. chloride 139-08-2 100 0 N/A
Benzenemethanaminium. N-hexadecylN.N dimethyl-.chloride 122-18-9 100 0 N/A
Cinnamaldehyde 104-55-2 100 0.0001 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0 N/A
Disodium hydroxyethylethylenediaminediacetate (impurity) 62099-15-4 100 0 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0 N/A
Formaldehyde (impurity) 50-00-0 100 0 N/A
Glycine. N-[2-[bis(carboxymethyl)amino]ethyl]-N-(2-hydroxye
t
139-89-9 100 0.0012 N/A
Hydrochloric acid 7647-01-0 100 0.0463 N/A
Methanol 67-56-1 100 0.0049 N/A
N.N-Dimethyl-N-dodecyl benzylaminium chloride 139-07-1 100 0 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0021 N/A
Naphthalene (Impurity) 91-20-3 100 0 N/A
Nitrilotriacetic acid trisodium salt (Impurity) 5064-31-3 100 0 N/A
Oxirane. Methyl-. polymer with Oxirane 11/6/9003 100 0 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy-
Ethane-1.2-diol.
25322-68-3 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0 N/A
Potassium oleate 143-18-0 100 0 N/A
Propan-2-ol 67-63-0 100 0 N/A
Reaction product of: acetophenone.
formaldehyde. cyclohexyla
224635-63-6 100 0.0002 N/A
Sodium Glycolate (impurity) 2836-32-0 100 0 N/A
Sodium hydroxide (impurity) 1310-73-2 100 0 N/A
Solvent naphtha (petroleum). heavy arom. 64742-94-5 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-23 2019-01-29 Surface Water - Runoff 11796
2019-01-25 2019-01-29 Oilfield Produced Water 7554
2019-01-25 2019-01-29 Oilfield Produced Water 2102
2019-01-25 2019-01-29 Oilfield Produced Water 324
2019-01-25 2019-01-29 Oilfield Produced Water 158

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 6811 0.0 0.0 0.0
2020 1936 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-14 No Incident Encountered 0.00 0.00
2019-01-30 No Incident Encountered 0.00 0.00

For data sources see[10]

References