X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686031210000

Well Details

Well ID: 0686031210000
Loading map...
Location: 00/10-12-068-03W6/0
Location Alias: 00/10-12-68-03 W6M
Location Alias 2: 00/10-12-068-03 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 03
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: VELVET HZ ELM 10-12-68-3
Operator Name: Velvet Energy Ltd.
License Number: 0489887
License Date: 2018-07-05
License Status: Amended
Spud Date: 2018-11-01
Final Drill Date: 2018-11-12
Well Total Depth: 5116.00 m
Surface Hole Latitude: 54.896133
Surface Hole Longitude: -118.341378

For data sources see[1][2]

Well History

Date Event
2018-07-05 Obtained License
2018-11-02 Surface Casing Operation Performed
2018-11-03 Direction Drilling Operation Performed - Deviate
2018-11-06 Direction Drilling Operation Performed - Horizontal
2018-11-07 Well Log Performed
2018-11-12 Finished Drilling
2018-11-12 Well Log Performed
2018-11-12 Well Mode changed to Drilled and Cased
2018-11-13 Production Casing Operation Performed
2018-11-14 Production Casing Operation Performed
2018-11-14 Rig Released
2018-11-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-12-31 Well Began Production
2018-12-31 Well Fluid changed to Crude Oil
2018-12-31 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-01 Horizon Drilling Inc. 50 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-03 1116.90 Deviate (5 - 79 degrees)
2018-11-06 2522.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-11-29 Multi-Stage Fracture 4993.60 4993.70 0
2018-11-29 Multi-Stage Fracture 4872.10 4872.20 0
2018-12-02 Multi-Stage Fracture 3654.50 3654.60 0
2018-12-02 Multi-Stage Fracture 3641.00 3641.10 0
2018-12-02 Multi-Stage Fracture 3627.50 3627.60 0
2018-12-03 Multi-Stage Fracture 3614.00 3614.10 0
2018-12-03 Multi-Stage Fracture 3600.50 3600.60 0
2018-12-03 Multi-Stage Fracture 3587.00 3587.10 0
2018-12-03 Multi-Stage Fracture 3573.50 3573.60 0
2018-12-03 Multi-Stage Fracture 3560.00 3560.10 0
2018-12-03 Multi-Stage Fracture 3546.50 3546.60 0
2018-12-03 Multi-Stage Fracture 3533.00 3533.10 0
2018-11-29 Multi-Stage Fracture 4858.60 4858.70 0
2018-12-03 Multi-Stage Fracture 3519.50 3519.60 0
2018-12-03 Multi-Stage Fracture 3506.00 3506.10 0
2018-12-03 Multi-Stage Fracture 3492.50 3492.60 0
2018-12-03 Multi-Stage Fracture 3479.00 3479.10 0
2018-12-03 Multi-Stage Fracture 3465.50 3465.60 0
2018-12-03 Multi-Stage Fracture 3452.00 3452.10 0
2018-12-03 Multi-Stage Fracture 3438.50 3438.60 0
2018-12-03 Multi-Stage Fracture 3425.00 3425.10 0
2018-12-03 Multi-Stage Fracture 3411.50 3411.60 0
2018-12-03 Multi-Stage Fracture 3398.00 3398.10 0
2018-11-29 Multi-Stage Fracture 4845.10 4845.20 0
2018-12-03 Multi-Stage Fracture 3384.50 3384.60 0
2018-12-03 Multi-Stage Fracture 3371.00 3371.10 0
2018-12-03 Multi-Stage Fracture 3357.50 3357.60 0
2018-12-03 Multi-Stage Fracture 3344.00 3344.10 0
2018-12-03 Multi-Stage Fracture 3330.50 3330.60 0
2018-12-03 Multi-Stage Fracture 3317.00 3317.10 0
2018-12-03 Multi-Stage Fracture 3303.50 3303.60 0
2018-12-03 Multi-Stage Fracture 3290.00 3290.10 0
2018-12-03 Multi-Stage Fracture 3276.50 3276.60 0
2018-12-03 Multi-Stage Fracture 3263.00 3263.10 0
2018-11-29 Multi-Stage Fracture 4831.60 4831.70 0
2018-12-03 Multi-Stage Fracture 3249.50 3249.60 0
2018-12-03 Multi-Stage Fracture 3236.00 3236.10 0
2018-12-03 Multi-Stage Fracture 3222.50 3222.60 0
2018-12-04 Multi-Stage Fracture 3209.00 3209.10 0
2018-12-04 Multi-Stage Fracture 3195.50 3195.60 0
2018-12-04 Multi-Stage Fracture 3182.00 3182.10 0
2018-12-04 Multi-Stage Fracture 3168.50 3168.60 0
2018-12-04 Multi-Stage Fracture 3155.00 3155.10 0
2018-12-04 Multi-Stage Fracture 3141.50 3141.60 0
2018-12-04 Multi-Stage Fracture 3128.00 3128.10 0
2018-11-29 Multi-Stage Fracture 4818.10 4818.20 0
2018-12-04 Multi-Stage Fracture 3114.50 3114.60 0
2018-12-04 Multi-Stage Fracture 3101.00 3101.10 0
2018-12-04 Multi-Stage Fracture 3087.50 3087.60 0
2018-12-04 Multi-Stage Fracture 3074.00 3074.10 0
2018-12-04 Multi-Stage Fracture 3060.50 3060.60 0
2018-12-04 Multi-Stage Fracture 3047.00 3047.10 0
2018-12-04 Multi-Stage Fracture 3033.50 3033.60 0
2018-12-04 Multi-Stage Fracture 3020.00 3020.10 0
2018-12-04 Multi-Stage Fracture 3006.50 3006.60 0
2018-12-04 Multi-Stage Fracture 2993.00 2993.10 0
2018-11-29 Multi-Stage Fracture 4804.60 4804.70 0
2018-12-04 Multi-Stage Fracture 2979.50 2979.60 0
2018-12-04 Multi-Stage Fracture 2966.00 2966.10 0
2018-12-04 Multi-Stage Fracture 2952.50 2952.60 0
2018-12-04 Multi-Stage Fracture 2939.00 2939.10 0
2018-12-04 Multi-Stage Fracture 2925.50 2925.60 0
2018-12-04 Multi-Stage Fracture 2912.00 2912.10 0
2018-12-04 Multi-Stage Fracture 2898.50 2898.60 0
2018-12-04 Multi-Stage Fracture 2885.00 2885.10 0
2018-12-04 Multi-Stage Fracture 2871.50 2871.60 0
2018-12-04 Multi-Stage Fracture 2858.00 2858.10 0
2018-11-29 Multi-Stage Fracture 4791.10 4791.20 0
2018-12-04 Multi-Stage Fracture 2844.50 2844.60 0
2018-12-04 Multi-Stage Fracture 2831.00 2831.10 0
2018-12-04 Multi-Stage Fracture 2817.50 2817.60 0
2018-12-04 Multi-Stage Fracture 2804.00 2804.10 0
2018-12-04 Multi-Stage Fracture 2790.50 2790.60 0
2018-12-05 Multi-Stage Fracture 2777.00 2777.10 0
2018-12-05 Multi-Stage Fracture 2763.50 2763.60 0
2018-12-05 Multi-Stage Fracture 2750.00 2750.10 0
2018-12-05 Multi-Stage Fracture 2736.50 2736.60 0
2018-12-05 Multi-Stage Fracture 2723.00 2723.10 0
2018-11-29 Multi-Stage Fracture 4777.60 4777.70 0
2018-12-05 Multi-Stage Fracture 2709.50 2709.60 0
2018-12-05 Multi-Stage Fracture 2696.00 2696.10 0
2018-12-05 Multi-Stage Fracture 2682.50 2682.60 0
2018-12-05 Multi-Stage Fracture 2669.00 2669.10 0
2018-12-05 Multi-Stage Fracture 2655.50 2655.60 0
2018-12-05 Multi-Stage Fracture 2642.00 2642.10 0
2018-11-29 Multi-Stage Fracture 4764.10 4764.20 0
2018-11-29 Multi-Stage Fracture 4750.60 4750.70 0
2018-11-29 Multi-Stage Fracture 4980.10 4980.20 0
2018-11-29 Multi-Stage Fracture 4737.10 4737.20 0
2018-11-30 Multi-Stage Fracture 4723.60 4723.70 0
2018-11-30 Multi-Stage Fracture 4710.10 4710.20 0
2018-11-30 Multi-Stage Fracture 4696.60 4696.70 0
2018-11-30 Multi-Stage Fracture 4683.10 4683.20 0
2018-11-30 Multi-Stage Fracture 4669.60 4669.70 0
2018-11-30 Multi-Stage Fracture 4656.10 4656.20 0
2018-11-30 Multi-Stage Fracture 4642.60 4642.70 0
2018-11-30 Multi-Stage Fracture 4629.10 4629.20 0
2018-11-30 Multi-Stage Fracture 4615.60 4615.70 0
2018-11-29 Multi-Stage Fracture 4966.60 4966.70 0
2018-11-30 Multi-Stage Fracture 4602.10 4602.20 0
2018-11-30 Multi-Stage Fracture 4588.60 4588.70 0
2018-11-30 Multi-Stage Fracture 4575.10 4575.20 0
2018-11-30 Multi-Stage Fracture 4561.60 4561.70 0
2018-11-30 Multi-Stage Fracture 4548.10 4548.20 0
2018-11-30 Multi-Stage Fracture 4534.60 4534.70 0
2018-11-30 Multi-Stage Fracture 4521.10 4521.20 0
2018-11-30 Multi-Stage Fracture 4507.60 4507.70 0
2018-11-30 Multi-Stage Fracture 4494.10 4494.20 0
2018-11-30 Multi-Stage Fracture 4480.60 4480.70 0
2018-11-29 Multi-Stage Fracture 4953.10 4953.20 0
2018-11-30 Multi-Stage Fracture 4467.10 4467.20 0
2018-11-30 Multi-Stage Fracture 4453.60 4453.70 0
2018-11-30 Multi-Stage Fracture 4440.10 4440.20 0
2018-11-30 Multi-Stage Fracture 4426.60 4426.70 0
2018-11-30 Multi-Stage Fracture 4413.10 4413.20 0
2018-11-30 Multi-Stage Fracture 4399.60 4399.70 0
2018-11-30 Multi-Stage Fracture 4386.10 4386.20 0
2018-12-01 Multi-Stage Fracture 4372.60 4372.70 0
2018-12-01 Multi-Stage Fracture 4359.10 4359.20 0
2018-12-01 Multi-Stage Fracture 4345.60 4345.70 0
2018-11-29 Multi-Stage Fracture 4939.60 4939.70 0
2018-12-01 Multi-Stage Fracture 4332.10 4332.20 0
2018-12-01 Multi-Stage Fracture 4318.60 4318.70 0
2018-12-01 Multi-Stage Fracture 4305.10 4305.20 0
2018-12-01 Multi-Stage Fracture 4291.60 4291.70 0
2018-12-01 Multi-Stage Fracture 4278.10 4278.20 0
2018-12-01 Multi-Stage Fracture 4264.60 4264.70 0
2018-12-01 Multi-Stage Fracture 4251.10 4251.20 0
2018-12-01 Multi-Stage Fracture 4237.60 4237.70 0
2018-12-01 Multi-Stage Fracture 4224.10 4224.20 0
2018-12-01 Multi-Stage Fracture 4210.60 4210.70 0
2018-11-29 Multi-Stage Fracture 4926.10 4926.20 0
2018-12-01 Multi-Stage Fracture 4197.10 4197.20 0
2018-12-01 Multi-Stage Fracture 4183.60 4183.70 0
2018-12-01 Multi-Stage Fracture 4170.10 4170.20 0
2018-12-01 Multi-Stage Fracture 4156.60 4156.70 0
2018-12-01 Multi-Stage Fracture 4143.10 4143.20 0
2018-12-01 Multi-Stage Fracture 4129.60 4129.70 0
2018-12-01 Multi-Stage Fracture 4116.10 4116.20 0
2018-12-01 Multi-Stage Fracture 4102.60 4102.70 0
2018-12-01 Multi-Stage Fracture 4089.10 4089.20 0
2018-12-01 Multi-Stage Fracture 4075.60 4075.70 0
2018-11-29 Multi-Stage Fracture 4912.60 4912.70 0
2018-12-01 Multi-Stage Fracture 4062.10 4062.20 0
2018-12-01 Multi-Stage Fracture 4048.60 4048.70 0
2018-12-01 Multi-Stage Fracture 4035.10 4035.20 0
2018-12-01 Multi-Stage Fracture 4021.60 4021.70 0
2018-12-02 Multi-Stage Fracture 4008.10 4008.20 0
2018-12-02 Multi-Stage Fracture 3994.60 3994.70 0
2018-12-02 Multi-Stage Fracture 3981.10 3981.20 0
2018-12-02 Multi-Stage Fracture 3967.60 3967.70 0
2018-12-02 Multi-Stage Fracture 3954.10 3954.20 0
2018-12-02 Multi-Stage Fracture 3940.60 3940.70 0
2018-11-29 Multi-Stage Fracture 4899.10 4899.20 0
2018-12-02 Multi-Stage Fracture 3927.10 3927.20 0
2018-12-02 Multi-Stage Fracture 3913.60 3913.70 0
2018-12-02 Multi-Stage Fracture 3900.10 3900.20 0
2018-12-02 Multi-Stage Fracture 3886.60 3886.70 0
2018-12-02 Multi-Stage Fracture 3873.10 3873.20 0
2018-12-02 Multi-Stage Fracture 3859.60 3859.70 0
2018-12-02 Multi-Stage Fracture 3843.50 3843.60 0
2018-12-02 Multi-Stage Fracture 3830.00 3830.10 0
2018-12-02 Multi-Stage Fracture 3816.50 3816.60 0
2018-12-02 Multi-Stage Fracture 3803.00 3803.10 0
2018-11-29 Multi-Stage Fracture 4885.60 4885.70 0
2018-12-02 Multi-Stage Fracture 3789.50 3789.60 0
2018-12-02 Multi-Stage Fracture 3776.00 3776.10 0
2018-12-02 Multi-Stage Fracture 3762.50 3762.60 0
2018-12-02 Multi-Stage Fracture 3749.00 3749.10 0
2018-12-02 Multi-Stage Fracture 3735.50 3735.60 0
2018-12-02 Multi-Stage Fracture 3722.00 3722.10 0
2018-12-02 Multi-Stage Fracture 3708.50 3708.60 0
2018-12-02 Multi-Stage Fracture 3695.00 3695.10 0
2018-12-02 Multi-Stage Fracture 3681.50 3681.60 0
2018-12-02 Multi-Stage Fracture 3668.00 3668.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-11-29 2018-12-05 2,267 0 N/A
2 2018-11-29 2018-12-04 2,267 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 78.8546 N/A
Slickwater Schlumberger Quartz. Crystalline silica 14808-60-7 100 21.0445 N/A
Slickwater Schlumberger Energizing Fluid 1.2.4 Trimethylbenzene (impurity) 95-63-6 100 0 N/A
2-Propen-1-aminium. N.N-dimethyl-N-2-propen-1-yl-. chloride 26062-79-3 100 0 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Benzenemethanaminium. N-hexadecylN.N dimethyl-.chloride 122-18-9 100 0 N/A
benzododecinium chloride 139-07-1 100 0 N/A
Hydrochloric acid 7647-01-0 100 0.0556 N/A
2 Slickwater Schlumberger Energizing Fluid 1-Propanaminium. N-(3-aminopropyl)-2-hydroxy-N.N-dimethyl-3
-
68139-30-0 100 0.0057 N/A
Acetic acid 64-19-7 100 0.0008 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0147 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0 N/A
Alcohols. C14-15. ethoxylated (7EO) 68951-67-7 100 0.0002 N/A
Alcohols. C7-9-iso-. C8-rich. ethoxylated 78330-19-5 100 0 N/A
Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Benzenemethanaminium. N.N-dimethyl-N tetradecyl-. chloride 139-08-2 100 0 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0 N/A
Disodium hydroxyethylethylenediaminediacetate (impurity) 62099-15-4 100 0 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0 N/A
Fatty acids. tall-oil 61790-12-3 100 0.0003 N/A
Glycine. N-[2-[bis(carboxymethyl)amino]ethyl]-N-(2-hydroxye
t
139-89-9 100 0.0015 N/A
Hexadec-1-ene 629-73-2 100 0 N/A
Methanol 67-56-1 100 0.0107 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0019 N/A
Naphthalene (Impurity) 91-20-3 100 0 N/A
Nitrilotriacetic acid trisodium salt (Impurity) 5064-31-3 100 0 N/A
Oxirane. Methyl-. polymer with Oxirane 11/6/9003 100 0.0001 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy-
Ethane-1.2-diol.
25322-68-3 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0025 N/A
Potassium oleate 143-18-0 100 0 N/A
Prop-2-yn-1-ol 107-19-7 100 0 N/A
Propan-2-ol 67-63-0 100 0 N/A
Propane-1.2-diol 57-55-6 100 0.0003 N/A
Sodium 1.4-bis[(2-ethylhexyl)oxy]-1.4-dioxobutane-2-sulfona
t
577-11-7 100 0.0018 N/A
Sodium chloride 7647-14-5 100 0.0008 N/A
Sodium Glycolate (impurity) 2836-32-0 100 0 N/A
Sodium hydroxide (impurity) 1310-73-2 100 0 N/A
Solvent naphtha (petroleum). heavy arom. 64742-94-5 100 0 N/A
Thiourea. polymer with formaldehyde and 1-phenylethanone 68527-49-1 100 0.0002 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-11-27 2018-12-05 Surface Water - Lake 9865
2018-11-30 2018-12-05 Surface Water - Lake 18996
2018-11-27 2018-12-05 Oilfield Produced Water 5983

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 3808 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-16 No Incident Encountered 0.00 0.00
2018-12-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References