X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686041006000

Well Details

Well ID: 0686041006000
Loading map...
Location: 00/06-10-068-04W6/0
Location Alias: 00/06-10-68-04 W6M
Location Alias 2: 00/06-10-068-04 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 04
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: HHR HZ ELM 6-10-68-4
Operator Name: Hammerhead Resources Inc.
License Number: 0482964
License Date: 2017-02-23
License Status: Issued
Spud Date: 2017-02-28
Final Drill Date: 2017-03-22
Well Total Depth: 4696.00 m
Surface Hole Latitude: 54.868947
Surface Hole Longitude: -118.560986

For data sources see[1][2]

Well History

Date Event
2017-02-23 Obtained License
2017-03-02 Surface Casing Operation Performed
2017-03-08 Direction Drilling Operation Performed - Deviate
2017-03-12 Direction Drilling Operation Performed - Horizontal
2017-03-14 Intermediate Casing Operation Performed
2017-03-14 Well Log Performed
2017-03-22 Finished Drilling
2017-03-22 Well Mode changed to Drilled and Cased
2017-03-23 Well Log Performed
2017-03-24 Liner Casing Operation Performed
2017-03-25 Rig Released
2017-07-14 Perforation Treatment Performed - Open-Hole Completion
2017-08-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-08-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-11 Well Fluid changed to Crude Oil
2017-09-11 Well Mode changed to Drilling and Completing
2017-09-24 Well Began Production
2017-09-24 Well Fluid changed to Crude Oil
2017-09-24 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-28 Nabors Drilling Limited 120 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-03-08 1219.70 Deviate (5 - 79 degrees)
2017-03-12 2482.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-07-14 Open Hole/Barefoot Completion 4691.00 4696.00 0
2017-08-28 Multi-Stage Fracture 4312.30 4312.40 0
2017-08-28 Multi-Stage Fracture 4268.80 4268.90 0
2017-08-28 Multi-Stage Fracture 4224.40 4224.50 0
2017-08-28 Multi-Stage Fracture 4180.00 4180.10 0
2017-08-28 Multi-Stage Fracture 4135.20 4135.30 0
2017-08-28 Multi-Stage Fracture 4090.90 4091.00 0
2017-08-28 Multi-Stage Fracture 4046.60 4046.70 0
2017-08-28 Multi-Stage Fracture 4002.30 4002.40 0
2017-08-29 Multi-Stage Fracture 3960.40 3960.50 0
2017-08-29 Multi-Stage Fracture 3916.50 3916.60 0
2017-08-28 Multi-Stage Fracture 4681.80 4681.90 0
2017-08-29 Multi-Stage Fracture 3874.10 3874.20 0
2017-08-29 Multi-Stage Fracture 3830.70 3830.80 0
2017-08-29 Multi-Stage Fracture 3785.90 3786.00 0
2017-08-29 Multi-Stage Fracture 3741.60 3741.70 0
2017-08-29 Multi-Stage Fracture 3685.40 3685.50 0
2017-08-29 Multi-Stage Fracture 3635.70 3635.80 0
2017-08-29 Multi-Stage Fracture 3585.90 3586.00 0
2017-08-29 Multi-Stage Fracture 3534.60 3534.70 0
2017-08-29 Multi-Stage Fracture 3475.80 3475.90 0
2017-08-29 Multi-Stage Fracture 3416.90 3417.00 0
2017-08-28 Multi-Stage Fracture 4627.80 4627.90 0
2017-08-29 Multi-Stage Fracture 3358.30 3358.40 0
2017-08-29 Multi-Stage Fracture 3299.40 3299.50 0
2017-08-29 Multi-Stage Fracture 3240.60 3240.70 0
2017-08-29 Multi-Stage Fracture 3182.00 3182.10 0
2017-08-29 Multi-Stage Fracture 3123.30 3123.40 0
2017-08-29 Multi-Stage Fracture 3064.90 3065.00 0
2017-08-29 Multi-Stage Fracture 3006.00 3006.10 0
2017-08-29 Multi-Stage Fracture 2947.30 2947.40 0
2017-08-29 Multi-Stage Fracture 2888.60 2888.70 0
2017-08-30 Multi-Stage Fracture 2829.50 2829.60 0
2017-08-28 Multi-Stage Fracture 4580.80 4580.90 0
2017-08-30 Multi-Stage Fracture 2770.90 2771.00 0
2017-08-30 Multi-Stage Fracture 2711.70 2711.80 0
2017-08-30 Multi-Stage Fracture 2654.40 2654.50 0
2017-08-30 Multi-Stage Fracture 2596.20 2596.30 0
2017-08-28 Multi-Stage Fracture 4533.80 4533.90 0
2017-08-28 Multi-Stage Fracture 4489.10 4489.20 0
2017-08-28 Multi-Stage Fracture 4444.30 4444.40 0
2017-08-28 Multi-Stage Fracture 4399.80 4399.90 0
2017-08-28 Multi-Stage Fracture 4355.90 4356.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-08-28 2017-08-30 2,388 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 83.0734 N/A
Slickwater Schlumberger Quartz. Crystalline silica 14808-60-7 100 8.3873 N/A
Slickwater Schlumberger Energizing Fluid 1.2.4 Trimethylbenzene (impurity) 95-63-6 100 0 N/A
1-Propanaminium. N-(3-aminopropyl)-2-hydroxy-N.N-dimethyl-3
-
68139-30-0 100 0.0078 N/A
2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0687 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid 64-19-7 100 0.001 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0132 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0019 N/A
Alcohol. C7-9-iso. C8. ethoxylated 78330-19-5 100 0.0011 N/A
Alcohol. C9-11-iso. C10. ethoxylated 78330-20-8 100 0.001 N/A
Alcohols. C9-11-iso-. C10-rich 68526-85-2 100 0.0005 N/A
Ammonium. diallyldimethyl-. chloride. polymers 26062-79-3 100 0.0001 N/A
Benzyldimethylammonium chloride 122-18-9 100 0 N/A
Benzyllauryldimethylammonium chloride 139-07-1 100 0.0002 N/A
Copper(II) sulfate 7758-98-7 100 0 N/A
Dimethylbenzylmyristylammonium chloride 139-08-2 100 0 N/A
Dioctyl sulfosuccinate sodium salt 577-11-7 100 0.0025 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.0117 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0.0012 N/A
Heavy aromatic naphtha 64742-94-5 100 0.0002 N/A
Methanol 67-56-1 100 0.0219 N/A
Methyl oxirane polymer with oxirane 11/6/9003 100 0.0016 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0023 N/A
Naphthalene (impurity) 91-20-3 100 0 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy-
Ethane-1.2-diol.
25322-68-3 100 0.0003 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0033 N/A
Potassium oleate 143-18-0 100 0 N/A
Propan-2-ol 67-63-0 100 0 N/A
Propane-1.2-diol 57-55-6 100 0.0005 N/A
Sodium chloride 7647-14-5 100 0.0081 N/A
Sorbitan monooleate 1338-43-8 100 0.0007 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.0005 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-08-01 2017-08-16 Surface Water - River 10553

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2024 0.0 0.0 0.0
2018 8440 0.0 0.0 0.0
2019 8556 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-28 No Incident Encountered 0.00 0.00
2017-08-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References