X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686072603000

Well Details

Well ID: 0686072603000
Loading map...
Location: 00/03-26-068-07W6/0
Location Alias: 00/03-26-68-07 W6M
Location Alias 2: 00/03-26-068-07 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 07
Section: 26
County/Municipality: Municipal District of Greenview No. 16
Well Name: GAIN HZ ELM 3-26-68-7
Operator Name: Gain Energy Ltd.
License Number: 0447984
License Date: 2012-08-24
License Status: Issued
Spud Date: 2012-09-19
Final Drill Date: 2012-09-28
Well Total Depth: 3008.00 m
Surface Hole Latitude: 54.923845
Surface Hole Longitude: -118.953446

For data sources see[1][2]

Well History

Date Event
2012-08-24 Obtained License
2012-09-21 Surface Casing Operation Performed
2012-09-23 Direction Drilling Operation Performed - Deviate
2012-09-24 Direction Drilling Operation Performed - Horizontal
2012-09-28 Finished Drilling
2012-09-28 Well Log Performed
2012-09-28 Well Mode changed to Drilled and Cased
2012-10-01 Liner Casing Operation Performed
2012-10-01 Production Casing Operation Performed
2012-10-01 Rig Released
2012-11-07 Well Log Performed
2012-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-11-19 Perforation Treatment Performed - Open-Hole Completion
2012-12-15 Well Began Production
2012-12-15 Well Fluid changed to Crude Oil
2012-12-15 Well Mode changed to Flowing
2019-04-30 Well Fluid changed to Crude Oil
2019-04-30 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-09-19 Horizon Drilling Inc. 29 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-09-23 1212.00 Deviate (5 - 79 degrees)
2012-09-24 1674.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-19 Open Hole/Barefoot Completion 2990.40 3008.00 0
2012-11-19 Multi-Stage Fracture 2176.90 2177.00 0
2012-11-19 Multi-Stage Fracture 2078.70 2078.80 0
2012-11-19 Multi-Stage Fracture 1980.30 1980.40 0
2012-11-19 Multi-Stage Fracture 1881.50 1881.60 0
2012-11-19 Multi-Stage Fracture 1783.70 1783.80 0
2012-11-19 Multi-Stage Fracture 2962.30 2963.40 0
2012-11-19 Multi-Stage Fracture 2863.60 2863.70 0
2012-11-19 Multi-Stage Fracture 2765.90 2766.00 0
2012-11-19 Multi-Stage Fracture 2668.10 2668.20 0
2012-11-19 Multi-Stage Fracture 2569.10 2569.20 0
2012-11-19 Multi-Stage Fracture 2471.90 2472.00 0
2012-11-19 Multi-Stage Fracture 2373.50 2373.60 0
2012-11-19 Multi-Stage Fracture 2275.60 2275.70 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 355 0.0 0.0 0.0
2013 7735 0.0 0.0 0.0
2014 8142 0.0 0.0 0.0
2015 8493 0.0 0.0 0.0
2016 8644 0.0 0.0 0.0
2017 8540 0.0 0.0 0.0
2018 8617 0.0 0.0 0.0
2019 8691 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-01 No Incident Encountered 0.00 0.00
2012-11-19 No Incident Encountered 0.00 0.00

For data sources see[8]

References