X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686081515000

Well Details

Well ID: 0686081515000
Loading map...
Location: 00/15-15-068-08W6/0
Location Alias: 00/15-15-68-08 W6M
Location Alias 2: 00/15-15-068-08 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 08
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: GAIN WAPITI 15-15-68-8
Operator Name: Gain Energy Ltd.
License Number: 0133866
License Date: 1988-05-13
License Status: Suspension
Spud Date: 1988-06-03
Final Drill Date: 1988-06-15
Well Total Depth: 1630.00 m
Surface Hole Latitude: 54.890534
Surface Hole Longitude: -119.125861

For data sources see[1][2]

Well History

Date Event
1988-05-13 Obtained License
1988-06-04 Surface Casing Operation Performed
1988-06-06 Direction Drilling Operation Performed - Deviate
1988-06-15 Finished Drilling
1988-06-15 Well Mode changed to Drilled and Cased
1988-06-16 Well Log Performed
1988-06-18 Production Casing Operation Performed
1988-06-18 Rig Released
1988-06-30 Perforation Treatment Performed - Jet Perforation
1988-07-03 Perforation Treatment Performed - Fractured
1988-07-07 Perforation Treatment Performed - Fractured
1988-08-01 Well Began Production
1988-08-01 Well Fluid changed to Crude Oil
1988-08-01 Well Mode changed to Pumping
2009-10-31 Well Fluid changed to Crude Oil
2009-10-31 Well Mode changed to Suspended
2020-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-20 Plug Back Performed
2020-02-20 Well Fluid changed to Crude Oil
2020-02-20 Well Mode changed to Abandoned Zone
2020-02-21 Perforation Treatment Performed - Jet Perforation
2020-02-22 Perforation Treatment Performed - Cement Plug
2020-02-22 Perforation Treatment Performed - Remedial Casing
2020-02-22 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-06-06 602.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-06-30 Perforation 1536.00 1540.00 13
1988-07-03 Fracture 1536.00 1540.00 0
1988-07-07 Fracture 1536.00 1540.00 0
2020-02-20 Packing Device Capped w/Cement 1518.00 1530.00 0
2020-02-21 Perforation 449.00 450.00 17
2020-02-22 Remedial Casing Cementing 449.00 450.00 0
2020-02-22 Cement Plug 428.00 448.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 3864 0.0 0.0 0.0
1989 8604 0.0 0.0 0.0
1990 8597 0.0 0.0 0.0
1991 8191 0.0 0.0 0.0
1992 8629 0.0 0.0 0.0
1993 7903 0.0 0.0 0.0
1994 8241 0.0 0.0 0.0
1995 8463 0.0 0.0 0.0
1996 8479 0.0 0.0 0.0
1997 8645 0.0 0.0 0.0
1998 8707 0.0 0.0 0.0
1999 8616 0.0 0.0 0.0
2000 8721 0.0 0.0 0.0
2001 8711 0.0 0.0 0.0
2002 8318 0.0 0.0 0.0
2003 8575 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 5088 0.0 0.0 0.0
2006 146 0.0 0.0 0.0
2007 552 0.0 0.0 0.0
2008 24 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References