X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686093614000

Well Details

Well ID: 0686093614000
Loading map...
Location: 00/14-36-068-09W6/0
Location Alias: 00/14-36-68-09 W6M
Location Alias 2: 00/14-36-068-09 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 09
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT HZ ELM 14-36-68-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0436908
License Date: 2011-09-16
License Status: Issued
Spud Date: 2011-10-27
Final Drill Date: 2011-12-08
Well Total Depth: 4370.00 m
Surface Hole Latitude: 54.923872
Surface Hole Longitude: -119.222299

For data sources see[1][2]

Well History

Date Event
2011-09-16 Obtained License
2011-10-29 Surface Casing Operation Performed
2011-11-06 Direction Drilling Operation Performed - Horizontal
2011-11-12 Well Log Performed
2011-11-14 Intermediate Casing Operation Performed
2011-12-08 Finished Drilling
2011-12-08 Well Log Performed
2011-12-08 Well Mode changed to Drilled and Cased
2011-12-10 Well Log Performed
2011-12-12 Liner Casing Operation Performed
2011-12-13 Rig Released
2012-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-09 Perforation Treatment Performed - Open-Hole Completion
2012-01-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-11 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-14 Well Log Performed
2012-02-04 Well Began Production
2012-02-04 Well Fluid changed to Gas
2012-02-04 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-06 2483.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-09 Open Hole/Barefoot Completion 4366.00 4370.00 0
2012-01-10 Multi-Stage Fracture 3526.40 3526.50 0
2012-01-10 Multi-Stage Fracture 3423.50 3423.60 0
2012-01-10 Multi-Stage Fracture 3320.50 3320.60 0
2012-01-11 Multi-Stage Fracture 3217.60 3217.70 0
2012-01-12 Multi-Stage Fracture 3114.70 3114.80 0
2012-01-12 Multi-Stage Fracture 3011.70 3011.80 0
2012-01-12 Multi-Stage Fracture 2895.40 2895.50 0
2012-01-09 Multi-Stage Fracture 4354.40 4354.50 0
2012-01-09 Multi-Stage Fracture 4246.40 4246.50 0
2012-01-09 Multi-Stage Fracture 4143.60 4143.70 0
2012-01-09 Multi-Stage Fracture 4040.80 4040.90 0
2012-01-10 Multi-Stage Fracture 3937.90 3938.00 0
2012-01-10 Multi-Stage Fracture 3835.20 3835.30 0
2012-01-10 Multi-Stage Fracture 3732.30 3732.40 0
2012-01-10 Multi-Stage Fracture 3629.30 3629.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5798 0.0 0.0 0.0
2013 7768 0.0 0.0 0.0
2014 7635 0.0 0.0 0.0
2015 7618 0.0 0.0 0.0
2016 7160 0.0 0.0 0.0
2017 6217 0.0 0.0 0.0
2018 8221 0.0 0.0 0.0
2019 7109 0.0 0.0 0.0
2020 1101 0.0 0.0 0.0

For data sources see[6]

References