X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0694122710000

Well Details

Well ID: 0694122710000
Loading map...
Location: 00/10-27-069-12W4/0
Location Alias: 00/10-27-69-12 W4M
Location Alias 2: 00/10-27-069-12 W4/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 4
Range: 12
Section: 27
County/Municipality: Lac La Biche County
Well Name: RAX TWEEDIE 10-27-69-12
Operator Name: Canadian Natural Resources Limited
License Number: 0059035
License Date: 1976-07-07
License Status: Abandoned
Spud Date: 1976-07-23
Final Drill Date: 1976-07-26
Well Total Depth: 486.20 m
Surface Hole Latitude: 55.005050
Surface Hole Longitude: -111.742465

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-07 Obtained License
1976-07-26 Drill Stem Test Performed
1976-07-26 Finished Drilling
1976-07-27 Drill Stem Test Performed
1976-07-27 Production Casing Operation Performed
1976-09-17 Perforation Treatment Performed - Jet Perforation
1976-09-18 Well Mode changed to Drilled and Cased
1979-10-18 Well Began Production
1979-10-18 Well Fluid changed to Gas
1979-10-18 Well Mode changed to Flowing
1992-09-01 Well Fluid changed to Gas
1992-09-01 Well Mode changed to Suspended
1994-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-10 Perforation Treatment Performed - Jet Perforation
1994-11-10 Plug Back Performed
1994-11-10 Well Fluid changed to Gas
1994-11-10 Well Mode changed to Abandoned Zone
2001-01-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-01 Perforation Treatment Performed - Cement Plug
2001-01-01 Plug Back Performed
2001-01-01 Well Log Performed
2001-01-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-17 Perforation 434.60 437.10 7
1994-11-10 Packing Device Capped w/Cement 420.50 428.50 0
1994-11-10 Perforation 278.70 279.60 20
2001-01-01 Cement Plug 413.00 420.50 0
2001-01-01 Packing Device Capped w/Cement 260.00 275.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 1824 0.0 0.0 0.0
1980 8260 0.0 0.0 0.0
1981 8249 0.0 0.0 0.0
1982 8394 0.0 0.0 0.0
1983 8735 0.0 0.0 0.0
1984 8299 0.0 0.0 0.0
1985 8697 0.0 0.0 0.0
1986 8689 0.0 0.0 0.0
1987 8727 0.0 0.0 0.0
1988 8256 0.0 0.0 0.0
1989 5722 0.0 0.0 0.0
1990 8242 0.0 0.0 0.0
1991 6228 0.0 0.0 0.0

For data sources see[5]

References