If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0694150711000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.96206,"lon":-112.285728,"icon":""}]} |
Location: 00/11-07-069-15W4/0 | |
Location Alias: 00/11-07-69-15 W4M | |
Location Alias 2: 00/11-07-069-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 4 | |
Range: 15 | |
Section: 07 | |
County/Municipality: Lac La Biche County | |
Well Name: SEAGULL UNIT CHARRON 11-7-69-15 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0045738 | |
License Date: 1973-05-11 | |
License Status: Abandoned | |
Spud Date: 1973-05-16 | |
Final Drill Date: 1973-05-22 | |
Well Total Depth: 465.70 m | |
Surface Hole Latitude: 54.962060 | |
Surface Hole Longitude: -112.285728 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1973-05-11 | Obtained License |
1973-05-19 | Drill Stem Test Performed |
1973-05-20 | Drill Stem Test Performed |
1973-05-21 | Drill Stem Test Performed |
1973-05-21 | Lost Circulation Occurred |
1973-05-22 | Finished Drilling |
1973-05-22 | Production Casing Operation Performed |
1973-05-22 | Well Log Performed |
1973-05-30 | Perforation Treatment Performed - Jet Perforation |
1973-05-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-08-15 | Well Mode changed to Drilled and Cased |
1976-09-17 | Well Began Production |
1976-09-17 | Well Fluid changed to Gas |
1976-09-17 | Well Mode changed to Flowing |
1983-01-11 | Well Fluid changed to Gas |
1983-01-11 | Well Mode changed to Suspended |
1988-01-19 | Well Log Performed |
1989-01-19 | Perforation Treatment Performed - Bridge Plug No Cement Required |
1989-01-19 | Perforation Treatment Performed - Jet Perforation |
1989-01-19 | Well Fluid changed to Gas |
1989-01-19 | Well Mode changed to Abandoned Zone |
1989-02-11 | Perforation Treatment Performed - Jet Perforation |
1997-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-19 | Perforation Treatment Performed - Jet Perforation |
1997-01-19 | Plug Back Performed |
1997-01-19 | Well Log Performed |
1997-01-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-20 | Perforation Treatment Performed - Jet Perforation |
1997-01-20 | Plug Back Performed |
1997-01-20 | Well Log Performed |
1997-01-23 | Perforation Treatment Performed - Jet Perforation |
1997-01-23 | Well Log Performed |
1997-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-24 | Plug Back Performed |
1997-01-28 | Perforation Treatment Performed - Jet Perforation |
1997-01-28 | Well Log Performed |
1997-01-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-01-30 | Plug Back Performed |
1997-01-30 | Well Log Performed |
1997-07-13 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-05-30 | Perforation | 450.20 | 452.00 | 10 |
1997-01-20 | Packing Device Capped w/Cement | 422.00 | 430.00 | 0 |
1997-01-20 | Perforation | 236.10 | 236.70 | 13 |
1997-01-23 | Perforation | 240.10 | 240.70 | 13 |
1997-01-24 | Packing Device Capped w/Cement | 235.80 | 240.70 | 0 |
1997-01-28 | Perforation | 236.10 | 236.70 | 13 |
1997-01-30 | Packing Device Capped w/Cement | 226.00 | 234.00 | 0 |
1973-05-31 | Acid Treatment | 450.20 | 452.00 | 0 |
1989-01-19 | Bridge Plug, No Cement | 448.00 | 448.00 | 0 |
1989-01-19 | Perforation | 444.50 | 446.00 | 14 |
1989-02-11 | Perforation | 455.00 | 456.00 | 12 |
1989-02-11 | Perforation | 459.00 | 460.00 | 12 |
1989-02-11 | Perforation | 461.00 | 463.00 | 12 |
1997-01-19 | Packing Device Capped w/Cement | 440.00 | 443.00 | 0 |
1997-01-19 | Perforation | 431.60 | 432.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 2296 | 0.0 | 0.0 | 0.0 |
1977 | 7182 | 0.0 | 0.0 | 0.0 |
1978 | 4946 | 0.0 | 0.0 | 0.0 |
1979 | 5845 | 0.0 | 0.0 | 0.0 |
1980 | 3422 | 0.0 | 0.0 | 0.0 |
1981 | 4132 | 0.0 | 0.0 | 0.0 |
1982 | 587 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1973-05-21 | Lost Circulation | 456.60 | 456.60 |
For data sources see[6]