If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0694202803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.997074,"lon":-112.995198,"icon":""}]} |
Location: 00/03-28-069-20W4/0 | |
Location Alias: 00/03-28-69-20 W4M | |
Location Alias 2: 00/03-28-069-20 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 4 | |
Range: 20 | |
Section: 28 | |
County/Municipality: Athabasca County | |
Well Name: RENAISSANCE PLEASANT 3-28-69-20 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0186114 | |
License Date: 1996-02-22 | |
License Status: RecCertified | |
Spud Date: 1996-02-24 | |
Final Drill Date: 1996-02-26 | |
Well Total Depth: 517.00 m | |
Surface Hole Latitude: 54.997074 | |
Surface Hole Longitude: -112.995198 |
Date | Event |
---|---|
1996-02-22 | Obtained License |
1996-02-25 | Surface Casing Operation Performed |
1996-02-26 | Finished Drilling |
1996-02-26 | Plug Back Performed |
1996-02-26 | Rig Released |
1996-02-26 | Well Log Performed |
1996-02-26 | Well Mode changed to Abandoned |
1996-02-27 | Well Log Performed |
2014-02-13 | Well Log Performed |
2014-02-20 | Production Casing Operation Performed |
2014-02-21 | Perforation Treatment Performed - Cement Plug |
2014-03-08 | Well Log Performed |
2014-03-10 | Perforation Treatment Performed - Jet Perforation |
2014-03-12 | Perforation Treatment Performed - Remedial Casing |
2017-01-18 | Well Log Performed |
2017-01-19 | Perforation Treatment Performed - Jet Perforation |
2017-01-19 | Well Log Performed |
2017-01-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-01-21 | Perforation Treatment Performed - Jet Perforation |
2017-01-21 | Well Log Performed |
2017-01-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-01-22 | Perforation Treatment Performed - Cement Plug |
2017-01-22 | Perforation Treatment Performed - Remedial Casing |
2017-01-23 | Perforation Treatment Performed - Jet Perforation |
2017-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-01-24 | Perforation Treatment Performed - Cement Plug |
2017-01-24 | Perforation Treatment Performed - Remedial Casing |
2017-01-25 | Perforation Treatment Performed - Jet Perforation |
2017-01-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2017-01-28 | Perforation Treatment Performed - Cement Plug |
2017-01-28 | Perforation Treatment Performed - Remedial Casing |
2017-01-28 | Plug Back Performed |
2018-02-14 | Well Log Performed |
2018-02-16 | Perforation Treatment Performed - Jet Perforation |
2018-02-16 | Well Log Performed |
2018-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-02-18 | Perforation Treatment Performed - Cement Plug |
2018-02-18 | Perforation Treatment Performed - Remedial Casing |
2018-02-19 | Perforation Treatment Performed - Jet Perforation |
2018-02-19 | Well Log Performed |
2018-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-02-20 | Perforation Treatment Performed - Cement Plug |
2018-02-20 | Perforation Treatment Performed - Remedial Casing |
2018-02-21 | Perforation Treatment Performed - Jet Perforation |
2018-02-21 | Well Log Performed |
2018-02-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-02-23 | Perforation Treatment Performed - Cement Plug |
2018-02-23 | Perforation Treatment Performed - Remedial Casing |
2018-02-25 | Perforation Treatment Performed - Jet Perforation |
2018-02-25 | Well Log Performed |
2018-02-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-02-26 | Perforation Treatment Performed - Cement Plug |
2018-02-26 | Perforation Treatment Performed - Remedial Casing |
2018-03-08 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-02-21 | Cement Plug | 507.00 | 515.00 | 0 |
2017-01-22 | Cement Plug | 289.70 | 299.00 | 0 |
2017-01-22 | Packing Device Capped w/Cement | 281.70 | 289.70 | 0 |
2017-01-23 | Perforation | 183.00 | 186.00 | 17 |
2017-01-23 | Perforation | 183.00 | 186.00 | 20 |
2017-01-24 | Remedial Casing Cementing | 183.00 | 186.00 | 0 |
2017-01-24 | Cement Plug | 178.50 | 186.00 | 0 |
2017-01-24 | Packing Device Capped w/Cement | 172.50 | 178.50 | 0 |
2017-01-25 | Perforation | 158.00 | 161.10 | 17 |
2017-01-25 | Perforation | 158.00 | 161.10 | 20 |
2017-01-28 | Remedial Casing Cementing | 158.00 | 161.00 | 0 |
2014-03-10 | Perforation | 183.00 | 186.00 | 17 |
2017-01-28 | Cement Plug | 155.00 | 161.00 | 0 |
2017-01-28 | Packing Device Capped w/Cement | 147.00 | 155.00 | 0 |
2018-02-16 | Perforation | 303.00 | 306.00 | 17 |
2018-02-16 | Perforation | 296.00 | 299.00 | 17 |
2018-02-18 | Remedial Casing Cementing | 296.00 | 306.00 | 0 |
2018-02-18 | Cement Plug | 290.00 | 306.00 | 0 |
2018-02-18 | Packing Device Capped w/Cement | 271.00 | 290.00 | 0 |
2018-02-19 | Perforation | 183.00 | 186.00 | 17 |
2018-02-20 | Remedial Casing Cementing | 183.00 | 186.00 | 0 |
2018-02-20 | Cement Plug | 176.40 | 186.00 | 0 |
2014-03-10 | Perforation | 183.00 | 186.00 | 20 |
2018-02-20 | Packing Device Capped w/Cement | 168.00 | 176.40 | 0 |
2018-02-21 | Perforation | 160.00 | 163.00 | 17 |
2018-02-21 | Perforation | 162.00 | 165.00 | 17 |
2018-02-23 | Remedial Casing Cementing | 160.00 | 165.00 | 0 |
2018-02-23 | Cement Plug | 154.30 | 165.00 | 0 |
2018-02-23 | Packing Device Capped w/Cement | 144.70 | 154.30 | 0 |
2018-02-25 | Perforation | 130.00 | 133.00 | 17 |
2018-02-26 | Remedial Casing Cementing | 130.00 | 133.00 | 0 |
2018-02-26 | Cement Plug | 124.80 | 133.00 | 0 |
2018-02-26 | Packing Device Capped w/Cement | 116.80 | 124.80 | 0 |
2014-03-12 | Remedial Casing Cementing | 183.00 | 186.00 | 0 |
2017-01-19 | Perforation | 421.00 | 424.00 | 17 |
2017-01-21 | Packing Device Capped w/Cement | 408.00 | 416.00 | 0 |
2017-01-21 | Perforation | 296.00 | 299.00 | 17 |
2017-01-21 | Perforation | 296.00 | 299.00 | 20 |
2017-01-22 | Remedial Casing Cementing | 296.00 | 299.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-13 | No Incident Encountered | 0.00 | 0.00 |
2017-01-29 | No Incident Encountered | 0.00 | 0.00 |
2018-02-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]