If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0694213605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.014289,"lon":-113.076748,"icon":""}]} |
Location: 00/05-36-069-21W4/0 | |
Location Alias: 00/05-36-69-21 W4M | |
Location Alias 2: 00/05-36-069-21 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 4 | |
Range: 21 | |
Section: 36 | |
County/Municipality: Athabasca County | |
Well Name: CNRL GAMBLER 5-36-69-21 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0164021 | |
License Date: 1994-01-14 | |
License Status: Abandoned | |
Spud Date: 1994-01-28 | |
Final Drill Date: 1994-01-31 | |
Well Total Depth: 559.00 m | |
Surface Hole Latitude: 55.014289 | |
Surface Hole Longitude: -113.076748 |
Date | Event |
---|---|
1994-01-14 | Obtained License |
1994-01-28 | Well Log Performed |
1994-01-29 | Surface Casing Operation Performed |
1994-01-31 | Finished Drilling |
1994-01-31 | Kick Occurred |
1994-01-31 | Lost Circulation Occurred |
1994-01-31 | Well Log Performed |
1994-01-31 | Well Mode changed to Drilled and Cased |
1994-02-02 | Perforation Treatment Performed - Open-Hole Completion |
1994-02-02 | Production Casing Operation Performed |
1994-02-02 | Rig Released |
1994-02-19 | Well Log Performed |
1994-02-20 | Perforation Treatment Performed - Jet Perforation |
1994-02-21 | Perforation Treatment Performed - Jet Perforation |
1994-02-21 | Well Log Performed |
1994-04-08 | Well Began Production |
1994-04-08 | Well Fluid changed to Gas |
1994-04-08 | Well Mode changed to Flowing |
1996-04-02 | Perforation Treatment Performed - Jet Perforation |
1996-04-02 | Well Log Performed |
2004-06-30 | Well Fluid changed to Gas |
2004-06-30 | Well Mode changed to Suspended |
2011-02-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-02-09 | Plug Back Performed |
2011-02-09 | Well Fluid changed to Gas |
2011-02-09 | Well Mode changed to Abandoned Zone |
2011-02-10 | Well Log Performed |
2011-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-02-27 | Perforation Treatment Performed - Jet Perforation |
2011-02-27 | Plug Back Performed |
2011-02-27 | Well Log Performed |
2011-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-03-03 | Perforation Treatment Performed - Remedial Casing |
2011-03-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-02-02 | Open Hole/Barefoot Completion | 556.50 | 559.00 | 0 |
2011-03-03 | Remedial Casing Cementing | 152.00 | 155.00 | 0 |
2011-03-03 | Packing Device Capped w/Cement | 132.00 | 148.00 | 0 |
1994-02-20 | Perforation | 405.20 | 405.70 | 13 |
1994-02-20 | Perforation | 400.00 | 401.00 | 13 |
1994-02-21 | Perforation | 385.00 | 388.00 | 13 |
1996-04-02 | Perforation | 388.00 | 392.00 | 13 |
2011-02-09 | Packing Device Capped w/Cement | 547.50 | 555.50 | 0 |
2011-02-09 | Packing Device Capped w/Cement | 390.00 | 398.00 | 0 |
2011-02-27 | Packing Device Capped w/Cement | 372.00 | 380.00 | 0 |
2011-02-27 | Perforation | 152.00 | 155.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 6298 | 0.0 | 0.0 | 0.0 |
1995 | 5369 | 0.0 | 0.0 | 0.0 |
1996 | 3368 | 0.0 | 0.0 | 0.0 |
1997 | 8445 | 0.0 | 0.0 | 0.0 |
1998 | 4260 | 0.0 | 0.0 | 0.0 |
1999 | 1524 | 0.0 | 0.0 | 0.0 |
2001 | 2814 | 0.0 | 0.0 | 0.0 |
2002 | 744 | 0.0 | 0.0 | 0.0 |
2003 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1994-01-31 | Lost Circulation | 559.00 | 559.00 |
1994-01-31 | Kick | 559.00 | 559.00 |
For data sources see[6]