X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0694240107002

Well Details

Well ID: 0694240107002
Loading map...
Location: 00/07-01-069-24W4/2
Location Alias: 00/07-01-69-24 W4M
Location Alias 2: 00/07-01-069-24 W4/02
Country: Canada
Province: Alberta
Township: 069
Meridian: 4
Range: 24
Section: 01
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CNRL BAPTISTE 7-1-69-24
Operator Name: Canadian Natural Resources Limited
License Number: 0157142
License Date: 1993-03-10
License Status: Abandoned
Spud Date: 1993-03-13
Final Drill Date: 1993-03-15
Well Total Depth: 665.00 m
Surface Hole Latitude: 54.943957
Surface Hole Longitude: -113.523311

For data sources see[1][2]

Well History

Date Event
1993-03-10 Obtained License
1993-03-13 Well Log Performed
1993-03-14 Surface Casing Operation Performed
1993-03-15 Finished Drilling
1993-03-15 Well Log Performed
1993-03-15 Well Mode changed to Drilled and Cased
1993-03-16 Drill Stem Test Performed
1993-03-17 Production Casing Operation Performed
1993-03-17 Rig Released
1993-03-20 Well Log Performed
1993-03-21 Well Log Performed
1993-03-22 Perforation Treatment Performed - Jet Perforation
1993-06-30 Well Began Production
1993-06-30 Well Fluid changed to Gas
1993-06-30 Well Mode changed to Flowing
1996-11-22 Well Log Performed
1996-11-23 Perforation Treatment Performed - Jet Perforation
2003-09-30 Well Fluid changed to Gas
2003-09-30 Well Mode changed to Suspended
2011-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-03 Plug Back Performed
2011-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-10 Perforation Treatment Performed - Jet Perforation
2011-03-10 Plug Back Performed
2011-03-10 Well Fluid changed to Gas
2011-03-10 Well Log Performed
2011-03-10 Well Mode changed to Abandoned Zone
2011-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-11 Perforation Treatment Performed - Remedial Casing
2011-03-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-22 Perforation 637.00 639.50 13
1993-03-22 Perforation 452.00 454.00 13
1996-11-23 Perforation 624.00 626.00 13
2011-02-03 Packing Device Capped w/Cement 606.00 614.00 0
2011-02-03 Packing Device Capped w/Cement 627.00 635.00 0
2011-03-10 Perforation 189.00 192.00 17
2011-03-10 Packing Device Capped w/Cement 440.00 448.00 0
2011-03-11 Packing Device Capped w/Cement 166.00 184.00 0
2011-03-11 Remedial Casing Cementing 189.00 192.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1381 0.0 0.0 0.0
1998 599 0.0 0.0 0.0
1999 459 0.0 0.0 0.0

For data sources see[5]

References