If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0695091912000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.990912,"lon":-115.370022,"icon":""}]} |
Location: 00/12-19-069-09W5/0 | |
Location Alias: 00/12-19-69-09 W5M | |
Location Alias 2: 00/12-19-069-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 5 | |
Range: 09 | |
Section: 19 | |
County/Municipality: Big Lakes County | |
Well Name: ACL SWANH 11-19-69-9 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0028264 | |
License Date: 1965-05-21 | |
License Status: Suspension | |
Spud Date: 1965-06-21 | |
Final Drill Date: 1965-07-22 | |
Well Total Depth: 2313.40 m | |
Surface Hole Latitude: 54.990912 | |
Surface Hole Longitude: -115.370022 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-05-21 | Obtained License |
1965-07-22 | Finished Drilling |
1965-07-22 | Well Mode changed to Drilled and Cased |
1965-07-23 | Production Casing Operation Performed |
1965-07-26 | Perforation Treatment Performed - Selective Jet Perforations |
1965-07-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-07-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-08-05 | Well Began Production |
1965-08-05 | Well Fluid changed to Crude Oil |
1965-08-05 | Well Mode changed to Flowing |
1965-10-27 | Perforation Treatment Performed - Jet Perforation |
1965-10-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-10-29 | Perforation Treatment Performed - Cement Squeeze |
1965-12-05 | Perforation Treatment Performed - Selective Jet Perforations |
1965-12-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-08-09 | Well Fluid changed to Crude Oil |
1973-08-09 | Well Mode changed to Pumping |
1999-11-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-29 | Well Log Performed |
1999-12-12 | Perforation Treatment Performed - Cement Plug |
1999-12-18 | Well Log Performed |
1999-12-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-12-19 | Well Fluid changed to Crude Oil |
1999-12-19 | Well Mode changed to Abandoned and Whipstocked |
2000-01-09 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-07-26 | Selective Jet Perforations | 2272.60 | 2272.60 | 0 |
1965-07-26 | Selective Jet Perforations | 2288.10 | 2288.70 | 0 |
1965-07-27 | Acid Treatment | 2272.60 | 2288.70 | 0 |
1965-07-29 | Acid Treatment | 2272.60 | 2288.70 | 0 |
1965-10-27 | Perforation | 2295.80 | 2297.30 | 26 |
1965-10-28 | Acid Treatment | 2295.80 | 2297.30 | 0 |
1965-10-29 | Cement Squeeze | 2272.60 | 2297.30 | 0 |
1965-12-05 | Selective Jet Perforations | 2272.60 | 2273.80 | 0 |
1965-12-05 | Selective Jet Perforations | 2275.00 | 2275.90 | 0 |
1965-12-05 | Selective Jet Perforations | 2278.40 | 2279.90 | 0 |
1965-12-05 | Selective Jet Perforations | 2281.10 | 2282.00 | 0 |
1965-07-26 | Selective Jet Perforations | 2272.90 | 2273.80 | 0 |
1965-12-05 | Selective Jet Perforations | 2284.50 | 2285.40 | 0 |
1965-12-06 | Acid Treatment | 2272.60 | 2285.40 | 0 |
1999-11-29 | Packing Device Capped w/Cement | 2258.50 | 2265.00 | 0 |
1999-12-12 | Cement Plug | 2255.40 | 2258.50 | 0 |
1999-12-19 | Packing Device Capped w/Cement | 2154.70 | 2154.70 | 0 |
1965-07-26 | Selective Jet Perforations | 2275.00 | 2275.90 | 0 |
1965-07-26 | Selective Jet Perforations | 2277.80 | 2278.10 | 0 |
1965-07-26 | Selective Jet Perforations | 2278.40 | 2279.90 | 0 |
1965-07-26 | Selective Jet Perforations | 2281.10 | 2281.70 | 0 |
1965-07-26 | Selective Jet Perforations | 2283.00 | 2284.50 | 0 |
1965-07-26 | Selective Jet Perforations | 2285.40 | 2286.00 | 0 |
1965-07-26 | Selective Jet Perforations | 2286.60 | 2287.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 552 | 0.0 | 0.0 | 0.0 |
1969 | 456 | 0.0 | 0.0 | 0.0 |
1970 | 8759 | 0.0 | 0.0 | 0.0 |
1971 | 6345 | 0.0 | 0.0 | 0.0 |
1972 | 8204 | 0.0 | 0.0 | 0.0 |
1973 | 8706 | 0.0 | 0.0 | 0.0 |
1974 | 8024 | 0.0 | 0.0 | 0.0 |
1975 | 7803 | 0.0 | 0.0 | 0.0 |
1976 | 7719 | 0.0 | 0.0 | 0.0 |
1977 | 8226 | 0.0 | 0.0 | 0.0 |
1978 | 8384 | 0.0 | 0.0 | 0.0 |
1979 | 7986 | 0.0 | 0.0 | 0.0 |
1980 | 8157 | 0.0 | 0.0 | 0.0 |
1981 | 8329 | 0.0 | 0.0 | 0.0 |
1982 | 8301 | 0.0 | 0.0 | 0.0 |
1983 | 8437 | 0.0 | 0.0 | 0.0 |
1984 | 8208 | 0.0 | 0.0 | 0.0 |
1985 | 8535 | 0.0 | 0.0 | 0.0 |
1986 | 8724 | 0.0 | 0.0 | 0.0 |
1987 | 8470 | 0.0 | 0.0 | 0.0 |
1988 | 7820 | 0.0 | 0.0 | 0.0 |
1989 | 7849 | 0.0 | 0.0 | 0.0 |
1990 | 8592 | 0.0 | 0.0 | 0.0 |
1991 | 8741 | 0.0 | 0.0 | 0.0 |
1992 | 8450 | 0.0 | 0.0 | 0.0 |
1993 | 8549 | 0.0 | 0.0 | 0.0 |
1994 | 7173 | 0.0 | 0.0 | 0.0 |
1995 | 6343 | 0.0 | 0.0 | 0.0 |
1996 | 4260 | 0.0 | 0.0 | 0.0 |
1997 | 8567 | 0.0 | 0.0 | 0.0 |
1998 | 7507 | 0.0 | 0.0 | 0.0 |
1999 | 6687 | 0.0 | 0.0 | 0.0 |
For data sources see[5]