If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0695093011002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.00535,"lon":-115.358369,"icon":""}]} |
Location: 00/11-30-069-09W5/2 | |
Location Alias: 00/11-30-69-09 W5M | |
Location Alias 2: 00/11-30-069-09 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 5 | |
Range: 09 | |
Section: 30 | |
County/Municipality: Big Lakes County | |
Well Name: ACL DEER MT. 11-30-69-9 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0026237 | |
License Date: 1964-06-10 | |
License Status: Amended | |
Spud Date: 1964-06-13 | |
Final Drill Date: 1994-04-05 | |
Well Total Depth: 2620.00 m | |
Surface Hole Latitude: 55.005350 | |
Surface Hole Longitude: -115.358369 |
Date | Event |
---|---|
1964-06-10 | Obtained License |
1964-07-04 | Production Casing Operation Performed |
1994-03-29 | Well Log Performed |
1994-03-30 | Direction Drilling Operation Performed - Horizontal |
1994-04-05 | Finished Drilling |
1994-04-05 | Perforation Treatment Performed - Open-Hole Completion |
1994-04-05 | Well Log Performed |
1994-04-05 | Well Mode changed to Drilled and Cased |
1994-04-07 | Rig Released |
1994-04-26 | Well Began Production |
1994-04-26 | Well Fluid changed to Crude Oil |
1994-04-26 | Well Mode changed to Pumping |
1996-06-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-06-14 | Perforation Treatment Performed - Cement Plug |
1996-06-14 | Plug Back Performed |
1996-06-14 | Well Fluid changed to Crude Oil |
1996-06-14 | Well Mode changed to Abandoned and Whipstocked |
1996-10-25 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1994-03-30 | 2100.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-04-05 | Open Hole/Barefoot Completion | 2094.00 | 2620.00 | 0 |
1996-06-11 | Acid Treatment | 2094.00 | 2620.00 | 0 |
1996-06-14 | Cement Plug | 2105.00 | 2620.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 4649 | 0.0 | 0.0 | 0.0 |
1995 | 8422 | 0.0 | 0.0 | 0.0 |
1996 | 2700 | 0.0 | 0.0 | 0.0 |
For data sources see[6]