If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0695093504000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.011914,"lon":-115.26922,"icon":""}]} |
Location: 00/04-35-069-09W5/0 | |
Location Alias: 00/04-35-69-09 W5M | |
Location Alias 2: 00/04-35-069-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 5 | |
Range: 09 | |
Section: 35 | |
County/Municipality: Big Lakes County | |
Well Name: PAN AM C-1 DEERMT 4-35-69-9 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0023989 | |
License Date: 1963-03-18 | |
License Status: RecExempt | |
Spud Date: 1963-03-18 | |
Final Drill Date: 1963-04-04 | |
Well Total Depth: 2115.60 m | |
Surface Hole Latitude: 55.011914 | |
Surface Hole Longitude: -115.269220 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1963-03-18 | Obtained License |
1963-04-04 | Finished Drilling |
1963-04-04 | Well Mode changed to Drilled and Cased |
1963-04-05 | Production Casing Operation Performed |
1963-07-03 | Perforation Treatment Performed - Bullet Perforation |
1963-07-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-07-30 | Well Began Production |
1963-07-30 | Well Fluid changed to Crude Oil |
1963-07-30 | Well Mode changed to Pumping |
1963-09-01 | Perforation Treatment Performed - Jet Perforation |
1963-09-02 | Perforation Treatment Performed - Cement Squeeze |
1963-09-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-09-10 | Perforation Treatment Performed - Jet Perforation |
1963-11-29 | Well Fluid changed to Crude Oil |
1963-11-29 | Well Mode changed to Suspended |
1967-01-26 | Perforation Treatment Performed - Cement Plug |
1967-01-28 | Well Abandoned |
1967-01-28 | Well Fluid changed to Crude Oil |
1967-01-28 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1963-07-03 | Bullet Perforation | 2089.10 | 2090.60 | 13 |
1963-07-03 | Bullet Perforation | 2084.80 | 2087.30 | 13 |
1963-07-04 | Acid Treatment | 2084.80 | 2090.60 | 0 |
1963-09-01 | Perforation | 2090.90 | 2092.10 | 13 |
1963-09-02 | Cement Squeeze | 2084.80 | 2092.10 | 0 |
1963-09-10 | Perforation | 2080.60 | 2083.00 | 7 |
1963-09-10 | Perforation | 2083.90 | 2085.40 | 7 |
1963-09-10 | Acid Treatment | 2080.60 | 2085.40 | 0 |
1967-01-26 | Cement Plug | 2063.50 | 2099.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]