X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695102101000

Well Details

Well ID: 0695102101000
Loading map...
Location: 00/01-21-069-10W5/0
Location Alias: 00/01-21-69-10 W5M
Location Alias 2: 00/01-21-069-10 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 10
Section: 21
County/Municipality: Big Lakes County
Well Name: Aquisition Oil SWANH 1-21-69-10
Operator Name: Acquisition Oil Corp.
License Number: 0069179
License Date: 1978-04-19
License Status: Suspension
Spud Date: 1978-06-15
Final Drill Date: 1978-06-29
Well Total Depth: 2292.70 m
Surface Hole Latitude: 54.983676
Surface Hole Longitude: -115.454496

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-04-19 Obtained License
1978-06-29 Finished Drilling
1978-06-29 Well Mode changed to Drilled and Cased
1978-07-02 Production Casing Operation Performed
1978-08-04 Perforation Treatment Performed - Jet Perforation
1978-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-07 Well Began Injection
1978-08-07 Well Fluid changed to Water
1978-08-07 Well Type changed to Injection
1997-04-04 Well Fluid changed to Water
1997-04-04 Well Mode changed to Suspended
1997-04-04 Well Type changed to Injection
1997-12-15 Well Fluid changed to Water
1997-12-15 Well Type changed to Injection
2005-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-10-12 Well Log Performed
2005-10-14 Perforation Treatment Performed - Jet Perforation
2005-10-15 Perforation Treatment Performed - Remedial Casing
2012-01-01 Well Fluid changed to Water
2012-01-01 Well Mode changed to Suspended
2012-01-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-04 Perforation 2254.90 2256.70 3
1978-08-04 Perforation 2258.00 2269.50 3
1978-08-04 Perforation 2273.20 2279.30 3
1978-08-06 Acid Treatment 2254.90 2279.30 0
1978-08-07 Acid Treatment 2254.90 2279.30 0
2005-10-04 Acid Treatment 2254.00 2279.30 0
2005-10-14 Perforation 1624.10 1624.50 7
2005-10-15 Remedial Casing Cementing 1624.10 1624.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0

For data sources see[5]

References