X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695221601000

Well Details

Well ID: 0695221601000
Loading map...
Location: 00/01-16-069-22W5/0
Location Alias: 00/01-16-69-22 W5M
Location Alias 2: 00/01-16-069-22 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 22
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: POCO SOUTH STURGEON LAKE 1-16-69-22
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0009411
License Date: 1955-04-21
License Status: Abandoned
Spud Date: 1955-04-28
Final Drill Date: 1955-05-30
Well Total Depth: 2612.10 m
Surface Hole Latitude: 54.968725
Surface Hole Longitude: -117.284132

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-04-21 Obtained License
1955-04-28 Lost Circulation Occurred
1955-05-30 Finished Drilling
1955-05-30 Well Mode changed to Drilled and Cased
1955-06-02 Perforation Treatment Performed - Open-Hole Completion
1955-06-02 Production Casing Operation Performed
1955-06-05 Well Began Production
1955-06-05 Well Fluid changed to Crude Oil
1955-06-05 Well Mode changed to Flowing
1972-06-14 Perforation Treatment Performed - Cement Plug
1972-06-14 Perforation Treatment Performed - Cement Squeeze
1972-06-16 Perforation Treatment Performed - Jet Perforation
1978-09-11 Well Fluid changed to Crude Oil
1978-09-11 Well Mode changed to Pumping
1980-04-29 Well Fluid changed to Crude Oil
1980-04-29 Well Mode changed to Suspended
1981-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-12-03 Plug Back Performed
1989-12-03 Well Abandoned
1989-12-03 Well Fluid changed to Crude Oil
1989-12-03 Well Log Performed
1989-12-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-06-02 Open Hole/Barefoot Completion 2603.90 2612.10 0
1972-06-14 Cement Squeeze 2603.90 2612.10 0
1972-06-14 Cement Plug 2600.90 2612.10 0
1972-06-16 Perforation 2588.40 2592.60 7
1972-06-16 Perforation 2595.10 2599.00 7
1981-01-28 Packing Device Capped w/Cement 2560.50 2567.50 0
1989-12-03 Packing Device Capped w/Cement 1198.00 1206.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1972 3149 0.0 0.0 0.0
1973 3476 0.0 0.0 0.0
1974 6612 0.0 0.0 0.0
1975 8390 0.0 0.0 0.0
1976 8496 0.0 0.0 0.0
1977 7672 0.0 0.0 0.0
1978 5323 0.0 0.0 0.0
1979 8201 0.0 0.0 0.0
1980 3225 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1955-04-28 Lost Circulation 0.10 0.10

For data sources see[6]

References