X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695232415000

Well Details

Well ID: 0695232415000
Loading map...
Location: 00/15-24-069-23W5/0
Location Alias: 00/15-24-69-23 W5M
Location Alias 2: 00/15-24-069-23 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 23
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: HARBOUR ET AL STURLS 15-24-69-23
Operator Name: Delphi Energy Corp.
License Number: 0145917
License Date: 1990-10-19
License Status: Abandoned
Spud Date: 1990-10-25
Final Drill Date: 1990-11-09
Well Total Depth: 2682.00 m
Surface Hole Latitude: 54.992572
Surface Hole Longitude: -117.365873

For data sources see[1][2]

Well History

Date Event
1990-10-19 Obtained License
1990-10-25 Surface Casing Operation Performed
1990-11-09 Finished Drilling
1990-11-09 Well Mode changed to Drilled and Cased
1990-11-10 Drill Stem Test Performed
1990-11-11 Well Log Performed
1990-11-13 Production Casing Operation Performed
1990-11-13 Rig Released
1990-11-24 Perforation Treatment Performed - Cement Plug
1990-11-24 Perforation Treatment Performed - Open-Hole Completion
1990-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-12-01 Well Began Production
1990-12-01 Well Fluid changed to Crude Oil
1990-12-01 Well Mode changed to Pumping
1991-07-30 Perforation Treatment Performed - Cement Plug
1991-07-30 Perforation Treatment Performed - Open-Hole Completion
1991-12-01 Well Fluid changed to Crude Oil
1991-12-01 Well Mode changed to Suspended
1996-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-02-11 Plug Back Performed
1996-02-11 Well Fluid changed to Crude Oil
1996-02-11 Well Log Performed
1996-02-11 Well Mode changed to Abandoned
1996-02-15 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-11-24 Open Hole/Barefoot Completion 2670.00 2682.00 0
1990-11-24 Cement Plug 2679.00 2682.00 0
1990-11-24 Open Hole/Barefoot Completion 2670.00 2679.00 0
1990-11-28 Acid Treatment 2670.00 2679.00 0
1991-07-30 Cement Plug 2674.00 2679.00 0
1991-07-30 Open Hole/Barefoot Completion 2670.00 2674.00 0
1996-02-11 Packing Device Capped w/Cement 2657.00 2665.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 286 0.0 0.0 0.0
1991 3715 0.0 0.0 0.0

For data sources see[5]

References