X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695241816000

Well Details

Well ID: 0695241816000
Loading map...
Location: 00/16-18-069-24W5/0
Location Alias: 00/16-18-69-24 W5M
Location Alias 2: 00/16-18-069-24 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 24
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: NAL HZ STURLKS 16-18-69-24
Operator Name: NAL Resources Limited
License Number: 0487314
License Date: 2017-12-15
License Status: Issued
Spud Date: 2018-02-03
Final Drill Date: 2018-02-16
Well Total Depth: 4105.00 m
Surface Hole Latitude: 54.962623
Surface Hole Longitude: -117.660953

For data sources see[1][2]

Well History

Date Event
2017-12-15 Obtained License
2018-02-04 Surface Casing Operation Performed
2018-02-07 Direction Drilling Operation Performed - Deviate
2018-02-09 Direction Drilling Operation Performed - Horizontal
2018-02-10 Intermediate Casing Operation Performed
2018-02-16 Finished Drilling
2018-02-16 Well Log Performed
2018-02-16 Well Mode changed to Drilled and Cased
2018-02-17 Liner Casing Operation Performed
2018-02-18 Rig Released
2018-03-01 Well Began Production
2018-03-01 Well Fluid changed to Crude Oil
2018-03-01 Well Mode changed to Pumping
2018-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-03 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-03 Horizon Drilling Inc. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-07 1543.80 Deviate (5 - 79 degrees)
2018-02-09 1886.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-02 Multi-Stage Fracture 4042.00 4042.20 0
2018-03-02 Multi-Stage Fracture 3411.00 3411.20 0
2018-03-02 Multi-Stage Fracture 3338.40 3338.50 0
2018-03-02 Multi-Stage Fracture 3267.20 3267.40 0
2018-03-02 Multi-Stage Fracture 3194.90 3195.10 0
2018-03-03 Multi-Stage Fracture 3122.20 3122.30 0
2018-03-03 Multi-Stage Fracture 3050.60 3050.80 0
2018-03-03 Multi-Stage Fracture 2978.10 2978.30 0
2018-03-03 Multi-Stage Fracture 2905.60 2905.80 0
2018-03-03 Multi-Stage Fracture 2832.90 2833.10 0
2018-03-03 Multi-Stage Fracture 2760.40 2760.60 0
2018-03-02 Multi-Stage Fracture 3992.30 3992.50 0
2018-03-03 Multi-Stage Fracture 2687.60 2687.80 0
2018-03-03 Multi-Stage Fracture 2614.20 2614.40 0
2018-03-03 Multi-Stage Fracture 2540.90 2541.10 0
2018-03-03 Multi-Stage Fracture 2467.50 2467.70 0
2018-03-03 Multi-Stage Fracture 2394.20 2394.40 0
2018-03-03 Multi-Stage Fracture 2320.80 2321.00 0
2018-03-03 Multi-Stage Fracture 2247.40 2247.60 0
2018-03-03 Multi-Stage Fracture 2174.90 2175.10 0
2018-03-03 Multi-Stage Fracture 2101.50 2101.70 0
2018-03-03 Multi-Stage Fracture 2028.10 2028.30 0
2018-03-02 Multi-Stage Fracture 3919.60 3919.80 0
2018-03-03 Multi-Stage Fracture 1955.50 1955.70 0
2018-03-02 Multi-Stage Fracture 3833.60 3833.80 0
2018-03-02 Multi-Stage Fracture 3774.40 3774.50 0
2018-03-02 Multi-Stage Fracture 3701.80 3702.00 0
2018-03-02 Multi-Stage Fracture 3629.10 3629.30 0
2018-03-02 Multi-Stage Fracture 3556.40 3556.60 0
2018-03-02 Multi-Stage Fracture 3483.70 3483.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-02 2018-03-03 1,775 2,196 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 79.5505 N/A
20/40 Domestic Halliburton Crystalline silica. quartz 14808-60-7 100 17.2344 N/A
MC B-8510 Mutli-Chem Bactericide/Biocide 2.2 Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0083 N/A
2.2-Dibromomalonamide 73003-80-2 100 0.0083 N/A
2-Monobromo-3-nitrilopropionamide 1113-55-9 100 0.0083 N/A
Dibromoacetonitrile 3252-43-5 100 0.0083 N/A
Inert Ingredient(s) Not Available 100 0.0083 N/A
AP Breaker Halliburton Breaker Ammonium persulfate 7727-54-0 100 0.0156 N/A
Inert Ingredient(s) Not Available 100 0.0156 N/A
MO-67 Halliburton Buffer Inert Ingredient(s) Not Available 100 0.0201 N/A
Sodium hydroxide 1310-73-2 100 0.0201 N/A
Cla-Web Halliburton Clay Control Inert Ingredient(s) Not Available 100 0.0434 N/A
Proprietary Trade Secret 100 0.0434 N/A
CL-22 UC Halliburton Crosslinker Inert Ingredient(s) Not Available 100 0.0485 N/A
Potassium formate 590-29-4 100 0.0485 N/A
CL-31 Halliburton Crosslinker Inert Ingredient(s) Not Available 100 0.0191 N/A
Potassium metaborate 1310-58-3 100 0.0191 N/A
Potassium metaborate 13709-94-9 100 0.0191 N/A
Nitrogen Halliburton Energizing Fluid Nitrogen 7727-37-9 100 2.9878 N/A
WG-36 GELLING AGENT Halliburton Gelling Agent Guar gum 9000-30-0 100 0.1859 N/A
OilPerm A Halliburton Surfactant Ethanol 64-17-5 100 0.0718 N/A
Heavy aromatic petroleum naphtha 64742-94-5 100 0.0718 N/A
Inert Ingredient(s) Not Available 100 0.0718 N/A
Naphthalene 91-20-3 100 0.0718 N/A
Poly(oxy-1.2-ethanediyl).alpha-(4-nonylphenyl)-omega-hydroxy-.branche
d
127087-87-0 100 0.0718 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-25 2018-02-27 Recycled Fracturing Water (treated at well site) 2540

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4800 0.0 0.0 0.0
2019 5509 0.0 0.0 0.0
2020 2100 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References