If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0696072905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.002516,"lon":-119.037267,"icon":""}]} |
| Location: 00/05-29-069-07W6/0 | |
| Location Alias: 00/05-29-69-07 W6M | |
| Location Alias 2: 00/05-29-069-07 W6/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 069 | |
| Meridian: 6 | |
| Range: 07 | |
| Section: 29 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: DAYLIGHT ELM 5-29-69-7 | |
| Operator Name: Sinopec Daylight Energy Ltd. | |
| License Number: 0344248 | |
| License Date: 2005-12-02 | |
| License Status: Suspension | |
| Spud Date: 2005-12-16 | |
| Final Drill Date: 2005-12-26 | |
| Well Total Depth: 1906.00 m | |
| Surface Hole Latitude: 55.002516 | |
| Surface Hole Longitude: -119.037267 |
| Date | Event |
|---|---|
| 2005-12-02 | Obtained License |
| 2005-12-18 | Surface Casing Operation Performed |
| 2005-12-26 | Finished Drilling |
| 2005-12-26 | Well Log Performed |
| 2005-12-26 | Well Mode changed to Drilled and Cased |
| 2005-12-27 | Production Casing Operation Performed |
| 2005-12-27 | Rig Released |
| 2006-01-15 | Perforation Treatment Performed - Jet Perforation |
| 2006-02-12 | Perforation Treatment Performed - Jet Perforation |
| 2006-02-12 | Well Log Performed |
| 2006-02-13 | Perforation Treatment Performed - Fractured |
| 2006-02-16 | Perforation Treatment Performed - Jet Perforation |
| 2006-02-16 | Well Log Performed |
| 2006-02-20 | Well Log Performed |
| 2006-06-12 | Well Began Production |
| 2006-06-12 | Well Fluid changed to Gas |
| 2006-06-12 | Well Mode changed to Flowing |
| 2006-11-05 | Perforation Treatment Performed - Fractured |
| 2006-11-11 | Perforation Treatment Performed - Cement Squeeze |
| 2006-11-17 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-18 | Perforation Treatment Performed - Fractured |
| 2006-11-21 | Perforation Treatment Performed - Jet Perforation |
| 2007-07-25 | Perforation Treatment Performed - Chemical Squeeze |
| 2007-09-12 | Perforation Treatment Performed - Jet Perforation |
| 2007-09-12 | Well Log Performed |
| 2008-10-31 | Well Fluid changed to Gas |
| 2008-10-31 | Well Mode changed to Suspended |
| 2009-08-01 | Well Fluid changed to Gas |
| 2009-08-01 | Well Mode changed to Flowing |
| 2013-09-01 | Well Fluid changed to Gas |
| 2013-09-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-01-15 | Perforation | 1786.00 | 1787.50 | 17 |
| 2006-11-11 | Cement Squeeze | 1730.00 | 1738.00 | 0 |
| 2006-11-17 | Perforation | 1348.50 | 1349.50 | 3 |
| 2006-11-17 | Perforation | 1303.50 | 1304.50 | 3 |
| 2006-11-17 | Perforation | 1284.50 | 1287.50 | 5 |
| 2006-11-17 | Perforation | 1227.00 | 1228.50 | 3 |
| 2006-11-18 | Fracture | 1227.00 | 1349.50 | 0 |
| 2006-11-21 | Perforation | 1226.50 | 1229.00 | 17 |
| 2007-07-25 | Chemical Squeeze | 1786.00 | 1787.50 | 0 |
| 2007-09-12 | Perforation | 1786.00 | 1789.00 | 20 |
| 2006-02-12 | Perforation | 1751.00 | 1753.00 | 17 |
| 2006-02-12 | Perforation | 1747.00 | 1748.00 | 17 |
| 2006-02-13 | Fracture | 1747.00 | 1753.00 | 0 |
| 2006-02-16 | Perforation | 1734.00 | 1738.00 | 17 |
| 2006-02-16 | Perforation | 1730.00 | 1734.00 | 17 |
| 2006-11-05 | Fracture | 1730.00 | 1732.00 | 0 |
| 2006-11-11 | Cement Squeeze | 1751.00 | 1753.00 | 0 |
| 2006-11-11 | Cement Squeeze | 1747.00 | 1748.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 4170 | 0.0 | 0.0 | 0.0 |
| 2007 | 1181 | 0.0 | 0.0 | 0.0 |
| 2009 | 1488 | 0.0 | 0.0 | 0.0 |
| 2010 | 4512 | 0.0 | 0.0 | 0.0 |
| 2011 | 384 | 0.0 | 0.0 | 0.0 |
For data sources see[5]