X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696081406000

Well Details

Well ID: 0696081406000
Loading map...
Location: 00/06-14-069-08W6/0
Location Alias: 00/06-14-69-08 W6M
Location Alias 2: 00/06-14-069-08 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 08
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: AMOCO WAPITI 6-14-69-8
Operator Name: Plains Midstream Canada ULC
License Number: 0065714
License Date: 1977-09-15
License Status: Re-Entered
Spud Date: 1977-09-16
Final Drill Date: 1977-10-21
Well Total Depth: 2478.00 m
Surface Hole Latitude: 54.971556
Surface Hole Longitude: -119.108633

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-15 Obtained License
1977-10-04 Drill Stem Test Performed
1977-10-21 Finished Drilling
1977-10-25 Liner Casing Operation Performed
1978-01-07 Perforation Treatment Performed - Jet Perforation
1978-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-01 Perforation Treatment Performed - Jet Perforation
1978-03-10 Perforation Treatment Performed - Fractured
1978-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-13 Well Mode changed to Drilled and Cased
1978-06-27 Perforation Treatment Performed - Jet Perforation
1978-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-19 Perforation Treatment Performed - Jet Perforation
1978-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-23 Perforation Treatment Performed - Jet Perforation
1978-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-27 Perforation Treatment Performed - Jet Perforation
1978-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-09-02 Perforation Treatment Performed - Cement Squeeze
1978-09-06 Perforation Treatment Performed - Jet Perforation
1978-09-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-09-14 Perforation Treatment Performed - Jet Perforation
1978-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-09-20 Perforation Treatment Performed - Jet Perforation
1978-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-09 Perforation Treatment Performed - Jet Perforation
1982-05-10 Perforation Treatment Performed - Cement Squeeze
1982-05-12 Perforation Treatment Performed - Jet Perforation
1982-05-13 Perforation Treatment Performed - Cement Squeeze
1982-05-16 Perforation Treatment Performed - Cement Squeeze
1982-05-18 Perforation Treatment Performed - Jet Perforation
1982-05-19 Perforation Treatment Performed - Cement Squeeze
1982-05-30 Perforation Treatment Performed - Jet Perforation
1982-06-01 Perforation Treatment Performed - Jet Perforation
1982-06-02 Well Log Performed
1982-06-03 Perforation Treatment Performed - Jet Perforation
1982-06-05 Perforation Treatment Performed - Jet Perforation
1982-06-10 Perforation Treatment Performed - Cement Squeeze
1982-06-20 Perforation Treatment Performed - Jet Perforation
1982-06-22 Perforation Treatment Performed - Fractured
1982-10-27 Perforation Treatment Performed - Fractured
1982-12-06 Well Began Production
1982-12-06 Well Fluid changed to Gas
1982-12-06 Well Mode changed to Flowing
1983-01-31 Well Fluid changed to Gas
1983-01-31 Well Mode changed to Suspended
1983-11-01 Well Fluid changed to Gas
1983-11-01 Well Mode changed to Flowing
1984-02-29 Well Fluid changed to Gas
1984-02-29 Well Mode changed to Suspended
1984-04-01 Well Fluid changed to Gas
1984-04-01 Well Mode changed to Flowing
1984-04-30 Well Fluid changed to Gas
1984-04-30 Well Mode changed to Suspended
1985-01-23 Well Fluid changed to Gas
1985-01-23 Well Mode changed to Flowing
1986-02-28 Well Fluid changed to Gas
1986-02-28 Well Mode changed to Suspended
1987-10-01 Well Fluid changed to Gas
1987-10-01 Well Mode changed to Flowing
1988-12-01 Well Fluid changed to Gas
1988-12-01 Well Mode changed to Suspended
1996-01-30 Perforation Treatment Performed - Cement Plug
1996-01-30 Plug Back Performed
1996-02-03 Perforation Treatment Performed - Jet Perforation
1996-02-03 Perforation Treatment Performed - Remedial Casing
1996-02-04 Well Abandoned
1996-02-04 Well Fluid changed to Gas
1996-02-04 Well Mode changed to Abandoned
1996-02-05 Well Fluid changed to Gas
1996-02-05 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-07 Perforation 2331.10 2347.60 7
1978-08-18 Packing Device Capped w/Cement 2209.80 2217.40 0
1978-08-19 Perforation 1905.60 1932.40 13
1978-08-22 Packing Device Capped w/Cement 1892.80 1902.00 0
1978-08-23 Perforation 1877.00 1882.40 13
1978-08-24 Acid Treatment 1877.00 1882.40 0
1978-08-26 Packing Device Capped w/Cement 1862.30 1871.50 0
1978-08-27 Perforation 1793.70 1809.00 13
1978-08-28 Acid Treatment 1793.70 1809.00 0
1978-09-02 Cement Squeeze 1793.70 1809.00 0
1978-09-02 Packing Device Capped w/Cement 1853.20 1856.20 0
1978-02-22 Acid Treatment 2331.10 2347.60 0
1978-09-06 Perforation 1793.70 1809.00 13
1978-09-07 Acid Treatment 1793.70 1809.00 0
1978-09-13 Packing Device Capped w/Cement 1775.80 1783.10 0
1978-09-14 Perforation 1527.70 1533.40 13
1978-09-16 Acid Treatment 1527.70 1533.40 0
1978-09-19 Packing Device Capped w/Cement 1506.30 1521.00 0
1978-09-20 Perforation 1374.60 1376.50 13
1978-09-21 Acid Treatment 1374.60 1376.50 0
1978-09-26 Packing Device Capped w/Cement 1362.50 1365.50 0
1982-05-09 Perforation 1374.60 1376.50 13
1978-03-01 Perforation 2331.10 2347.60 13
1982-05-09 Perforation 1375.00 1376.80 13
1982-05-10 Cement Squeeze 1374.60 1376.80 0
1982-05-12 Perforation 1527.70 1533.40 13
1982-05-13 Cement Squeeze 1527.70 1533.40 0
1982-05-16 Cement Squeeze 1527.70 1533.40 0
1982-05-18 Perforation 1793.70 1809.00 13
1982-05-19 Cement Squeeze 1793.70 1809.00 0
1982-05-30 Perforation 1877.00 1882.90 13
1982-06-01 Perforation 1905.60 1932.40 13
1982-06-03 Perforation 2223.50 2228.40 0
1978-03-01 Perforation 2331.10 2347.60 13
1982-06-05 Perforation 2331.10 2347.60 7
1982-06-10 Cement Squeeze 1877.00 2347.60 0
1982-06-20 Perforation 2331.20 2347.40 13
1982-06-22 Fracture 2331.20 2347.40 0
1982-10-27 Fracture 2331.20 2347.40 0
1996-01-30 Cement Plug 2030.00 2347.40 0
1996-02-03 Perforation 600.00 601.00 13
1996-02-03 Remedial Casing Cementing 600.00 601.00 0
1978-03-10 Fracture 2331.10 2347.60 0
1978-03-13 Acid Treatment 2331.10 2347.60 0
1978-06-27 Perforation 2223.50 2228.40 13
1978-06-28 Acid Treatment 2223.50 2228.40 0
1978-07-04 Acid Treatment 2223.50 2228.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 291 0.0 0.0 0.0
1983 1357 0.0 0.0 0.0
1984 2733 0.0 0.0 0.0
1985 1026 0.0 0.0 0.0
1987 1153 0.0 0.0 0.0
1988 2026 0.0 0.0 0.0

For data sources see[5]

References