If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696081406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.971556,"lon":-119.108633,"icon":""}]} |
Location: 00/06-14-069-08W6/0 | |
Location Alias: 00/06-14-69-08 W6M | |
Location Alias 2: 00/06-14-069-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 08 | |
Section: 14 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: AMOCO WAPITI 6-14-69-8 | |
Operator Name: Plains Midstream Canada ULC | |
License Number: 0065714 | |
License Date: 1977-09-15 | |
License Status: Re-Entered | |
Spud Date: 1977-09-16 | |
Final Drill Date: 1977-10-21 | |
Well Total Depth: 2478.00 m | |
Surface Hole Latitude: 54.971556 | |
Surface Hole Longitude: -119.108633 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-09-15 | Obtained License |
1977-10-04 | Drill Stem Test Performed |
1977-10-21 | Finished Drilling |
1977-10-25 | Liner Casing Operation Performed |
1978-01-07 | Perforation Treatment Performed - Jet Perforation |
1978-02-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-03-01 | Perforation Treatment Performed - Jet Perforation |
1978-03-10 | Perforation Treatment Performed - Fractured |
1978-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-03-13 | Well Mode changed to Drilled and Cased |
1978-06-27 | Perforation Treatment Performed - Jet Perforation |
1978-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-07-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-08-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-08-19 | Perforation Treatment Performed - Jet Perforation |
1978-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-08-23 | Perforation Treatment Performed - Jet Perforation |
1978-08-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-08-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-08-27 | Perforation Treatment Performed - Jet Perforation |
1978-08-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-09-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-09-02 | Perforation Treatment Performed - Cement Squeeze |
1978-09-06 | Perforation Treatment Performed - Jet Perforation |
1978-09-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-09-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-09-14 | Perforation Treatment Performed - Jet Perforation |
1978-09-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-09-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1978-09-20 | Perforation Treatment Performed - Jet Perforation |
1978-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-05-09 | Perforation Treatment Performed - Jet Perforation |
1982-05-10 | Perforation Treatment Performed - Cement Squeeze |
1982-05-12 | Perforation Treatment Performed - Jet Perforation |
1982-05-13 | Perforation Treatment Performed - Cement Squeeze |
1982-05-16 | Perforation Treatment Performed - Cement Squeeze |
1982-05-18 | Perforation Treatment Performed - Jet Perforation |
1982-05-19 | Perforation Treatment Performed - Cement Squeeze |
1982-05-30 | Perforation Treatment Performed - Jet Perforation |
1982-06-01 | Perforation Treatment Performed - Jet Perforation |
1982-06-02 | Well Log Performed |
1982-06-03 | Perforation Treatment Performed - Jet Perforation |
1982-06-05 | Perforation Treatment Performed - Jet Perforation |
1982-06-10 | Perforation Treatment Performed - Cement Squeeze |
1982-06-20 | Perforation Treatment Performed - Jet Perforation |
1982-06-22 | Perforation Treatment Performed - Fractured |
1982-10-27 | Perforation Treatment Performed - Fractured |
1982-12-06 | Well Began Production |
1982-12-06 | Well Fluid changed to Gas |
1982-12-06 | Well Mode changed to Flowing |
1983-01-31 | Well Fluid changed to Gas |
1983-01-31 | Well Mode changed to Suspended |
1983-11-01 | Well Fluid changed to Gas |
1983-11-01 | Well Mode changed to Flowing |
1984-02-29 | Well Fluid changed to Gas |
1984-02-29 | Well Mode changed to Suspended |
1984-04-01 | Well Fluid changed to Gas |
1984-04-01 | Well Mode changed to Flowing |
1984-04-30 | Well Fluid changed to Gas |
1984-04-30 | Well Mode changed to Suspended |
1985-01-23 | Well Fluid changed to Gas |
1985-01-23 | Well Mode changed to Flowing |
1986-02-28 | Well Fluid changed to Gas |
1986-02-28 | Well Mode changed to Suspended |
1987-10-01 | Well Fluid changed to Gas |
1987-10-01 | Well Mode changed to Flowing |
1988-12-01 | Well Fluid changed to Gas |
1988-12-01 | Well Mode changed to Suspended |
1996-01-30 | Perforation Treatment Performed - Cement Plug |
1996-01-30 | Plug Back Performed |
1996-02-03 | Perforation Treatment Performed - Jet Perforation |
1996-02-03 | Perforation Treatment Performed - Remedial Casing |
1996-02-04 | Well Abandoned |
1996-02-04 | Well Fluid changed to Gas |
1996-02-04 | Well Mode changed to Abandoned |
1996-02-05 | Well Fluid changed to Gas |
1996-02-05 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-01-07 | Perforation | 2331.10 | 2347.60 | 7 |
1978-08-18 | Packing Device Capped w/Cement | 2209.80 | 2217.40 | 0 |
1978-08-19 | Perforation | 1905.60 | 1932.40 | 13 |
1978-08-22 | Packing Device Capped w/Cement | 1892.80 | 1902.00 | 0 |
1978-08-23 | Perforation | 1877.00 | 1882.40 | 13 |
1978-08-24 | Acid Treatment | 1877.00 | 1882.40 | 0 |
1978-08-26 | Packing Device Capped w/Cement | 1862.30 | 1871.50 | 0 |
1978-08-27 | Perforation | 1793.70 | 1809.00 | 13 |
1978-08-28 | Acid Treatment | 1793.70 | 1809.00 | 0 |
1978-09-02 | Cement Squeeze | 1793.70 | 1809.00 | 0 |
1978-09-02 | Packing Device Capped w/Cement | 1853.20 | 1856.20 | 0 |
1978-02-22 | Acid Treatment | 2331.10 | 2347.60 | 0 |
1978-09-06 | Perforation | 1793.70 | 1809.00 | 13 |
1978-09-07 | Acid Treatment | 1793.70 | 1809.00 | 0 |
1978-09-13 | Packing Device Capped w/Cement | 1775.80 | 1783.10 | 0 |
1978-09-14 | Perforation | 1527.70 | 1533.40 | 13 |
1978-09-16 | Acid Treatment | 1527.70 | 1533.40 | 0 |
1978-09-19 | Packing Device Capped w/Cement | 1506.30 | 1521.00 | 0 |
1978-09-20 | Perforation | 1374.60 | 1376.50 | 13 |
1978-09-21 | Acid Treatment | 1374.60 | 1376.50 | 0 |
1978-09-26 | Packing Device Capped w/Cement | 1362.50 | 1365.50 | 0 |
1982-05-09 | Perforation | 1374.60 | 1376.50 | 13 |
1978-03-01 | Perforation | 2331.10 | 2347.60 | 13 |
1982-05-09 | Perforation | 1375.00 | 1376.80 | 13 |
1982-05-10 | Cement Squeeze | 1374.60 | 1376.80 | 0 |
1982-05-12 | Perforation | 1527.70 | 1533.40 | 13 |
1982-05-13 | Cement Squeeze | 1527.70 | 1533.40 | 0 |
1982-05-16 | Cement Squeeze | 1527.70 | 1533.40 | 0 |
1982-05-18 | Perforation | 1793.70 | 1809.00 | 13 |
1982-05-19 | Cement Squeeze | 1793.70 | 1809.00 | 0 |
1982-05-30 | Perforation | 1877.00 | 1882.90 | 13 |
1982-06-01 | Perforation | 1905.60 | 1932.40 | 13 |
1982-06-03 | Perforation | 2223.50 | 2228.40 | 0 |
1978-03-01 | Perforation | 2331.10 | 2347.60 | 13 |
1982-06-05 | Perforation | 2331.10 | 2347.60 | 7 |
1982-06-10 | Cement Squeeze | 1877.00 | 2347.60 | 0 |
1982-06-20 | Perforation | 2331.20 | 2347.40 | 13 |
1982-06-22 | Fracture | 2331.20 | 2347.40 | 0 |
1982-10-27 | Fracture | 2331.20 | 2347.40 | 0 |
1996-01-30 | Cement Plug | 2030.00 | 2347.40 | 0 |
1996-02-03 | Perforation | 600.00 | 601.00 | 13 |
1996-02-03 | Remedial Casing Cementing | 600.00 | 601.00 | 0 |
1978-03-10 | Fracture | 2331.10 | 2347.60 | 0 |
1978-03-13 | Acid Treatment | 2331.10 | 2347.60 | 0 |
1978-06-27 | Perforation | 2223.50 | 2228.40 | 13 |
1978-06-28 | Acid Treatment | 2223.50 | 2228.40 | 0 |
1978-07-04 | Acid Treatment | 2223.50 | 2228.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 291 | 0.0 | 0.0 | 0.0 |
1983 | 1357 | 0.0 | 0.0 | 0.0 |
1984 | 2733 | 0.0 | 0.0 | 0.0 |
1985 | 1026 | 0.0 | 0.0 | 0.0 |
1987 | 1153 | 0.0 | 0.0 | 0.0 |
1988 | 2026 | 0.0 | 0.0 | 0.0 |
For data sources see[5]