If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696091114000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.953205,"lon":-119.247808,"icon":""}]} |
Location: 00/14-11-069-09W6/0 | |
Location Alias: 00/14-11-69-09 W6M | |
Location Alias 2: 00/14-11-069-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 09 | |
Section: 11 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: DAYLIGHT ET AL HZ ELM 14-11-69-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0441590 | |
License Date: 2011-12-16 | |
License Status: Issued | |
Spud Date: 2012-01-10 | |
Final Drill Date: 2012-02-19 | |
Well Total Depth: 4305.00 m | |
Surface Hole Latitude: 54.953205 | |
Surface Hole Longitude: -119.247808 |
Date | Event |
---|---|
2011-12-16 | Obtained License |
2012-01-11 | Surface Casing Operation Performed |
2012-01-12 | Well Log Performed |
2012-01-16 | Kick Occurred |
2012-01-19 | Direction Drilling Operation Performed - Horizontal |
2012-01-26 | Intermediate Casing Operation Performed |
2012-02-19 | Finished Drilling |
2012-02-19 | Well Log Performed |
2012-02-19 | Well Mode changed to Drilled and Cased |
2012-02-21 | Liner Casing Operation Performed |
2012-02-22 | Rig Released |
2012-03-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-17 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-22 | Well Log Performed |
2012-03-28 | Well Began Production |
2012-03-28 | Well Fluid changed to Gas |
2012-03-28 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-10 | Precision Drilling Corporation | 508 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-19 | 2465.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-17 | Open Hole/Barefoot Completion | 4301.00 | 4305.00 | 0 |
2012-03-19 | Multi-Stage Fracture | 3479.00 | 3479.10 | 0 |
2012-03-19 | Multi-Stage Fracture | 3380.80 | 3380.90 | 0 |
2012-03-19 | Multi-Stage Fracture | 3281.00 | 3281.10 | 0 |
2012-03-19 | Multi-Stage Fracture | 3181.80 | 3181.90 | 0 |
2012-03-19 | Multi-Stage Fracture | 3070.10 | 3070.20 | 0 |
2012-03-19 | Multi-Stage Fracture | 2970.90 | 2971.00 | 0 |
2012-03-19 | Multi-Stage Fracture | 2871.60 | 2871.70 | 0 |
2012-03-17 | Multi-Stage Fracture | 4276.50 | 4276.60 | 0 |
2012-03-17 | Multi-Stage Fracture | 4198.60 | 4198.70 | 0 |
2012-03-17 | Multi-Stage Fracture | 4099.50 | 4099.60 | 0 |
2012-03-18 | Multi-Stage Fracture | 4000.30 | 4000.40 | 0 |
2012-03-18 | Multi-Stage Fracture | 3888.10 | 3888.20 | 0 |
2012-03-18 | Multi-Stage Fracture | 3789.60 | 3789.70 | 0 |
2012-03-18 | Multi-Stage Fracture | 3690.40 | 3690.50 | 0 |
2012-03-18 | Multi-Stage Fracture | 3591.60 | 3591.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 3510 | 0.0 | 0.0 | 0.0 |
2013 | 7112 | 0.0 | 0.0 | 0.0 |
2014 | 8636 | 0.0 | 0.0 | 0.0 |
2015 | 8727 | 0.0 | 0.0 | 0.0 |
2016 | 7576 | 0.0 | 0.0 | 0.0 |
2017 | 6174 | 0.0 | 0.0 | 0.0 |
2018 | 8279 | 0.0 | 0.0 | 0.0 |
2019 | 7860 | 0.0 | 0.0 | 0.0 |
2020 | 1266 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-01-16 | Kick | 1988.00 | 1988.00 |
2012-04-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]