If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0704162506002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.088084,"lon":-112.306633,"icon":""}]} |
Location: 00/06-25-070-16W4/2 | |
Location Alias: 00/06-25-70-16 W4M | |
Location Alias 2: 00/06-25-070-16 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 4 | |
Range: 16 | |
Section: 25 | |
County/Municipality: Lac La Biche County | |
Well Name: CNRL CHARRON 6-25-70-16 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0088337 | |
License Date: 1981-01-19 | |
License Status: Suspension | |
Spud Date: 1981-01-25 | |
Final Drill Date: 1981-01-26 | |
Well Total Depth: 515.00 m | |
Surface Hole Latitude: 55.088084 | |
Surface Hole Longitude: -112.306633 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-01-19 | Obtained License |
1981-01-26 | Finished Drilling |
1981-01-26 | Well Mode changed to Drilled and Cased |
1981-01-27 | Production Casing Operation Performed |
1981-02-05 | Perforation Treatment Performed - Open-Hole Completion |
1981-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-02-06 | Perforation Treatment Performed - Jet Perforation |
1985-03-09 | Well Log Performed |
1985-03-10 | Perforation Treatment Performed - Jet Perforation |
1985-08-02 | Well Began Production |
1985-08-02 | Well Fluid changed to Gas |
1985-08-02 | Well Mode changed to Flowing |
1987-05-31 | Well Fluid changed to Gas |
1987-05-31 | Well Mode changed to Suspended |
2009-02-16 | Perforation Treatment Performed - Jet Perforation |
2009-02-16 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-02-05 | Open Hole/Barefoot Completion | 499.00 | 515.00 | 0 |
1981-02-06 | Packing Device Capped w/Cement | 485.00 | 485.00 | 0 |
1981-02-06 | Perforation | 479.50 | 481.00 | 7 |
1981-02-06 | Perforation | 455.00 | 457.00 | 7 |
1981-02-06 | Perforation | 470.00 | 470.50 | 7 |
1985-03-10 | Perforation | 293.00 | 294.00 | 13 |
2009-02-16 | Perforation | 455.00 | 457.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1985 | 1855 | 0.0 | 0.0 | 0.0 |
1986 | 2736 | 0.0 | 0.0 | 0.0 |
1987 | 2139 | 0.0 | 0.0 | 0.0 |
For data sources see[5]