If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0704170714000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.052078,"lon":-112.586645,"icon":""}]} |
Location: 00/14-07-070-17W4/0 | |
Location Alias: 00/14-07-70-17 W4M | |
Location Alias 2: 00/14-07-070-17 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 070 | |
Meridian: 4 | |
Range: 17 | |
Section: 07 | |
County/Municipality: Athabasca County | |
Well Name: ENRON CALLING LAKE 14-7-70-17 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0174070 | |
License Date: 1994-12-14 | |
License Status: Suspension | |
Spud Date: 1995-01-02 | |
Final Drill Date: 1995-01-04 | |
Well Total Depth: 472.00 m | |
Surface Hole Latitude: 55.052078 | |
Surface Hole Longitude: -112.586645 |
Date | Event |
---|---|
1994-12-14 | Obtained License |
1995-01-03 | Surface Casing Operation Performed |
1995-01-04 | Finished Drilling |
1995-01-04 | Well Log Performed |
1995-01-04 | Well Mode changed to Drilled and Cased |
1995-01-05 | Production Casing Operation Performed |
1995-01-05 | Rig Released |
1995-01-15 | Perforation Treatment Performed - Open-Hole Completion |
1995-01-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-01-16 | Perforation Treatment Performed - Jet Perforation |
1995-01-16 | Plug Back Performed |
1998-01-17 | Well Began Production |
1998-01-17 | Well Fluid changed to Gas |
1998-01-17 | Well Mode changed to Flowing |
2002-03-10 | Well Log Performed |
2002-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-11 | Perforation Treatment Performed - Jet Perforation |
2002-03-11 | Plug Back Performed |
2002-03-11 | Well Fluid changed to Gas |
2002-03-11 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-01-15 | Open Hole/Barefoot Completion | 447.00 | 472.00 | 0 |
1995-01-16 | Packing Device Capped w/Cement | 436.00 | 444.00 | 0 |
1995-01-16 | Perforation | 311.00 | 313.00 | 13 |
1995-01-16 | Perforation | 315.00 | 316.00 | 13 |
2002-03-11 | Packing Device Capped w/Cement | 303.00 | 310.00 | 0 |
2002-03-11 | Perforation | 284.00 | 285.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 8147 | 0.0 | 0.0 | 0.0 |
1999 | 8607 | 0.0 | 0.0 | 0.0 |
2000 | 5571 | 0.0 | 0.0 | 0.0 |
2001 | 2455 | 0.0 | 0.0 | 0.0 |
For data sources see[5]