X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0705112105000

Well Details

Well ID: 0705112105000
Loading map...
Location: 00/05-21-070-11W5/0
Location Alias: 00/05-21-70-11 W5M
Location Alias 2: 00/05-21-070-11 W5/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 5
Range: 11
Section: 21
County/Municipality: Big Lakes County
Well Name: ACL HZ SWANH 5-21-70-11
Operator Name: Cardinal Energy Ltd.
License Number: 0461758
License Date: 2013-12-02
License Status: Issued
Spud Date: 2013-12-18
Final Drill Date: 2014-01-19
Well Total Depth: 3984.00 m
Surface Hole Latitude: 55.077648
Surface Hole Longitude: -115.600748

For data sources see[1][2]

Well History

Date Event
2013-12-02 Obtained License
2013-12-19 Surface Casing Operation Performed
2014-01-06 Direction Drilling Operation Performed - Deviate
2014-01-08 Well Log Performed
2014-01-09 Direction Drilling Operation Performed - Horizontal
2014-01-09 Well Log Performed
2014-01-11 Intermediate Casing Operation Performed
2014-01-19 Finished Drilling
2014-01-19 Well Log Performed
2014-01-19 Well Mode changed to Drilled and Cased
2014-01-21 Liner Casing Operation Performed
2014-01-21 Perforation Treatment Performed - Open-Hole Completion
2014-01-22 Rig Released
2014-01-27 Well Log Performed
2014-02-01 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-07 Well Began Production
2014-02-07 Well Fluid changed to Crude Oil
2014-02-07 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-01-06 1799.30 Deviate (5 - 79 degrees)
2014-01-09 2574.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-01-21 Open Hole/Barefoot Completion 3975.00 3984.00 0
2014-02-01 Multi-Stage Fracture 3589.40 3589.50 0
2014-02-01 Multi-Stage Fracture 3706.40 3706.50 0
2014-02-01 Multi-Stage Fracture 3794.30 3794.40 0
2014-02-01 Multi-Stage Fracture 3869.70 3869.80 0
2014-02-01 Multi-Stage Fracture 3952.20 3952.30 0
2014-02-01 Multi-Stage Fracture 2720.00 2720.10 0
2014-02-01 Multi-Stage Fracture 2824.00 2824.10 0
2014-02-01 Multi-Stage Fracture 2940.80 2940.90 0
2014-02-01 Multi-Stage Fracture 3044.60 3044.70 0
2014-02-01 Multi-Stage Fracture 3148.10 3148.20 0
2014-02-01 Multi-Stage Fracture 3266.80 3266.90 0
2014-02-01 Multi-Stage Fracture 3368.40 3368.50 0
2014-02-01 Multi-Stage Fracture 3486.70 3486.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-02-01 2014-02-01 2,363 108 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ethylbenzene 100-41-4 100 85.4287 N/A
methanol 67-56-1 100 3.3519 N/A
water Not Available 100 14.3134 N/A
xylene 1330-20-7 100 85.4287 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-01-28 2014-01-29 Surface Water - Lake 151
2014-02-11 2014-02-13 Oilfield Produced Water 70

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6722 0.0 0.0 0.0
2015 8698 0.0 0.0 0.0
2016 8733 0.0 0.0 0.0
2017 8657 0.0 0.0 0.0
2018 8404 0.0 0.0 0.0
2019 8387 0.0 0.0 0.0
2020 2035 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-22 No Incident Encountered 0.00 0.00
2014-02-25 No Incident Encountered 0.00 0.00

For data sources see[9]

References