X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706070102000

Well Details

Well ID: 0706070102000
Loading map...
Location: 00/02-01-070-07W6/0
Location Alias: 00/02-01-70-07 W6M
Location Alias 2: 00/02-01-070-07 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 07
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL 0-0-0-0
Operator Name: Canadian Natural Resources Limited
License Number: 0077811
License Date: 1979-08-31
License Status: Suspension
Spud Date: 1979-09-09
Final Drill Date: 1979-10-03
Well Total Depth: 2375.00 m
Surface Hole Latitude: 55.028327
Surface Hole Longitude: -118.924510

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-31 Obtained License
1979-10-03 Finished Drilling
1979-10-04 Well Log Performed
1979-10-05 Drill Stem Test Performed
1979-10-06 Drill Stem Test Performed
1979-10-08 Drill Stem Test Performed
1979-10-10 Production Casing Operation Performed
1979-10-11 Well Mode changed to Drilled and Cased
1980-02-20 Perforation Treatment Performed - Jet Perforation
1980-02-23 Perforation Treatment Performed - Fractured
1980-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-02-27 Perforation Treatment Performed - Jet Perforation
1980-02-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-03-13 Perforation Treatment Performed - Jet Perforation
1980-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-20 Perforation Treatment Performed - Fractured
1982-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-03-20 Perforation Treatment Performed - Jet Perforation
1982-03-25 Perforation Treatment Performed - Fractured
1982-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-20 Perforation 2276.50 2281.50 13
1980-03-13 Perforation 2011.00 2021.00 13
1980-03-15 Acid Treatment 2011.00 2021.00 0
1980-03-20 Fracture 2011.00 2021.00 0
1982-03-16 Packing Device Capped w/Cement 1966.00 2000.80 0
1982-03-20 Perforation 1703.00 1706.00 13
1982-03-25 Fracture 1703.00 1706.00 0
1982-03-30 Packing Device Capped w/Cement 1690.00 1695.00 0
1980-02-23 Fracture 2276.50 2281.50 0
1980-02-26 Packing Device Capped w/Cement 2264.00 2272.00 0
1980-02-27 Perforation 2220.00 2226.00 13
1980-02-27 Perforation 2249.50 2252.00 13
1980-02-29 Acid Treatment 2220.00 2252.00 0
1980-03-06 Packing Device Capped w/Cement 2237.00 2245.00 0
1980-03-09 Acid Treatment 2220.00 2226.00 0
1980-03-12 Packing Device Capped w/Cement 2200.00 2208.00 0

For data sources see[4]



References