X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0706072802000

Well Details

Well ID: 0706072802000
Loading map...
Location: 00/02-28-070-07W6/0
Location Alias: 00/02-28-70-07 W6M
Location Alias 2: 00/02-28-070-07 W6/00
Country: Canada
Province: Alberta
Township: 070
Meridian: 6
Range: 07
Section: 28
County/Municipality: Municipal District of Greenview No. 16
Well Name: PIPE 100 HZ ELM 2-28-70-7
Operator Name: Pipestone Energy Corp.
License Number: 0484276
License Date: 2017-06-28
License Status: Issued
Spud Date: 2017-07-11
Final Drill Date: 2017-07-31
Well Total Depth: 5004.00 m
Surface Hole Latitude: 55.064461
Surface Hole Longitude: -118.980863

For data sources see[1][2]

Well History

Date Event
2017-06-28 Obtained License
2017-07-13 Surface Casing Operation Performed
2017-07-18 Direction Drilling Operation Performed - Deviate
2017-07-21 Direction Drilling Operation Performed - Horizontal
2017-07-21 Well Log Performed
2017-07-31 Finished Drilling
2017-07-31 Well Log Performed
2017-07-31 Well Mode changed to Drilled and Cased
2017-08-02 Production Casing Operation Performed
2017-08-03 Rig Released
2017-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-01 Well Began Production
2017-10-01 Well Fluid changed to Gas
2017-10-01 Well Mode changed to Flowing
2017-10-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-03 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-07-11 Ensign Drilling Inc. 66 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-07-18 2186.80 Deviate (5 - 79 degrees)
2017-07-21 2521.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-24 Multi-Stage Fracture 4941.50 4941.60 0
2017-09-26 Multi-Stage Fracture 4525.70 4525.80 0
2017-09-26 Multi-Stage Fracture 4487.20 4487.30 0
2017-09-26 Multi-Stage Fracture 4448.40 4448.50 0
2017-09-26 Multi-Stage Fracture 4409.70 4409.80 0
2017-09-27 Multi-Stage Fracture 4370.60 4370.70 0
2017-09-27 Multi-Stage Fracture 4292.40 4292.50 0
2017-09-27 Multi-Stage Fracture 4253.40 4253.50 0
2017-09-27 Multi-Stage Fracture 4214.30 4214.40 0
2017-09-27 Multi-Stage Fracture 4097.80 4097.90 0
2017-09-27 Multi-Stage Fracture 4058.70 4058.80 0
2017-09-24 Multi-Stage Fracture 4913.20 4913.30 0
2017-09-27 Multi-Stage Fracture 4019.60 4019.70 0
2017-09-28 Multi-Stage Fracture 3980.50 3980.60 0
2017-09-28 Multi-Stage Fracture 3941.40 3941.50 0
2017-09-28 Multi-Stage Fracture 3902.30 3902.40 0
2017-09-28 Multi-Stage Fracture 3863.20 3863.30 0
2017-09-28 Multi-Stage Fracture 3824.10 3824.20 0
2017-09-28 Multi-Stage Fracture 3785.00 3785.10 0
2017-09-29 Multi-Stage Fracture 3745.90 3746.00 0
2017-09-29 Multi-Stage Fracture 3706.80 3706.90 0
2017-09-29 Multi-Stage Fracture 3667.70 3667.80 0
2017-09-24 Multi-Stage Fracture 4874.20 4874.30 0
2017-09-30 Multi-Stage Fracture 3628.70 3628.80 0
2017-09-30 Multi-Stage Fracture 3589.60 3589.70 0
2017-09-30 Multi-Stage Fracture 3550.40 3550.50 0
2017-09-30 Multi-Stage Fracture 3511.30 3511.40 0
2017-09-30 Multi-Stage Fracture 3472.30 3472.40 0
2017-10-01 Multi-Stage Fracture 3433.20 3433.30 0
2017-10-01 Multi-Stage Fracture 3394.20 3394.30 0
2017-10-01 Multi-Stage Fracture 3355.10 3355.20 0
2017-10-01 Multi-Stage Fracture 3316.10 3316.20 0
2017-10-02 Multi-Stage Fracture 3277.40 3277.50 0
2017-09-24 Multi-Stage Fracture 4835.10 4835.20 0
2017-10-02 Multi-Stage Fracture 3238.30 3238.40 0
2017-10-02 Multi-Stage Fracture 3199.20 3199.30 0
2017-10-02 Multi-Stage Fracture 3160.10 3160.20 0
2017-10-02 Multi-Stage Fracture 3121.00 3121.10 0
2017-10-03 Multi-Stage Fracture 3081.90 3082.00 0
2017-10-03 Multi-Stage Fracture 3042.80 3042.90 0
2017-10-03 Multi-Stage Fracture 3003.70 3003.80 0
2017-10-03 Multi-Stage Fracture 2964.60 2964.70 0
2017-09-25 Multi-Stage Fracture 4796.10 4796.20 0
2017-09-25 Multi-Stage Fracture 4757.00 4757.10 0
2017-09-25 Multi-Stage Fracture 4717.90 4718.00 0
2017-09-25 Multi-Stage Fracture 4603.70 4603.80 0
2017-09-25 Multi-Stage Fracture 4564.70 4564.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-24 2017-10-03 2,434 26,480 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.0267 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 3.7078 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 8.1828 N/A
15% HCL Acid Step Energy Services Acid Hydrochloric Acid 7647-01-0 100 0.252 N/A
Water 7732-18-5 100 0.252 N/A
Econocide B1008 (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0091 N/A
Methyl Alcohol 67-56-1 100 0.0091 N/A
Non-Hazardous Ingredients Not Available 100 0.0091 N/A
SBO-1 (Breaker) Step Energy Services Breaker Disodium peroxydisulfate 7775-27-1 100 0.0092 N/A
SCS-8 (Clay Control) Step Energy Services Clay Control Inorganic Salt Not Available 100 0.0861 N/A
SCI-4 (Corrosion Inhibitor) Step Energy Services Corrosion Inhibitor Methanol 67-56-1 100 0.0004 N/A
Modified Thiourea Polymer 68527-49-1 100 0.0004 N/A
Olefin 64743-02-8 100 0.0004 N/A
Polyoxyalkylenes 68951-67-7 100 0.0004 N/A
Propargyl Alcohol 107-19-7 100 0.0004 N/A
SFR-102s (Friction Reducer) STEP Energy Services Friction Reducer Distillates. Petroleum. Hydrotreated Light 64742-47-8 100 0.0481 N/A
Proprietary Trade Secret 100 0.0481 N/A
SIC-3 (Iron Chelator) Step Energy Services Iron Control Citric Acid 77-92-9 100 0.0012 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.0868 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.0868 N/A
Methanol 67-56-1 100 0.0868 N/A
Monoethanolamine 141-43-5 100 0.0868 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.0868 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.0868 N/A
Water 7732-18-5 100 0.0868 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-09-24 2017-10-03 Surface Water - River 29150

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1057 0.0 0.0 0.0
2018 4250 0.0 0.0 0.0
2019 3813 0.0 0.0 0.0
2020 1874 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-03 No Incident Encountered 0.00 0.00
2017-10-27 No Incident Encountered 0.00 0.00

For data sources see[10]

References