X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715011706000

Well Details

Well ID: 0715011706000
Loading map...
Location: 00/06-17-071-01W5/0
Location Alias: 00/06-17-71-01 W5M
Location Alias 2: 00/06-17-071-01 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 01
Section: 17
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CNRL 0-0-0-0
Operator Name: Canadian Natural Resources Limited
License Number: 0110615
License Date: 1984-11-08
License Status: Issued
Spud Date: 1984-12-18
Final Drill Date: 1984-12-21
Well Total Depth: 670.00 m
Surface Hole Latitude: 55.146247
Surface Hole Longitude: -114.118414

For data sources see[1][2]

Well History

Date Event
1984-11-08 Obtained License
1984-12-18 Surface Casing Operation Performed
1984-12-21 Finished Drilling
1984-12-21 Well Log Performed
1984-12-22 Drill Stem Test Performed
1984-12-23 Drill Stem Test Performed
1984-12-24 Production Casing Operation Performed
1984-12-24 Rig Released
1984-12-24 Well Mode changed to Drilled and Cased
1986-01-25 Well Log Performed
1986-01-26 Perforation Treatment Performed - Jet Perforation
1986-01-26 Well Log Performed
1990-01-08 Well Began Production
1990-01-08 Well Fluid changed to Gas
1990-01-08 Well Mode changed to Flowing
1993-03-01 Well Fluid changed to Gas
1993-03-01 Well Mode changed to Flowing
1993-03-05 Perforation Treatment Performed - Jet Perforation
1994-04-08 Well Fluid changed to Gas
1994-04-08 Well Mode changed to Suspended
1996-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-10 Plug Back Performed
1996-03-10 Well Fluid changed to Gas
1996-03-10 Well Mode changed to Abandoned Zone
1999-06-09 Perforation Treatment Performed - Cement Squeeze
1999-06-09 Plug Back Performed
1999-06-13 Perforation Treatment Performed - Jet Perforation
1999-06-13 Well Log Performed
1999-06-16 Well Log Performed
2001-05-14 Perforation Treatment Performed - Chemical Squeeze
2001-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-11-17 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-26 Perforation 551.50 554.00 13
1993-03-05 Perforation 424.50 427.00 13
1996-03-10 Packing Device Capped w/Cement 535.00 543.00 0
1999-06-09 Cement Squeeze 424.50 427.00 0
1999-06-13 Perforation 484.00 492.00 20
2001-05-14 Chemical Squeeze 484.00 492.00 0
2001-05-15 Acid Treatment 484.00 492.00 0
2002-11-17 Chemical Squeeze 484.00 492.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 4225 0.0 0.0 0.0
1991 5748 0.0 0.0 0.0
1992 8597 0.0 0.0 0.0
1993 8371 0.0 0.0 0.0
1994 2175 0.0 0.0 0.0

For data sources see[5]

References