X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0715011909000

Well Details

Well ID: 0715011909000
Loading map...
Location: 00/09-19-071-01W5/0
Location Alias: 00/09-19-71-01 W5M
Location Alias 2: 00/09-19-071-01 W5/00
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 01
Section: 19
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CNRL 230583 DECRENE 9-19-71-1
Operator Name: Canadian Natural Resources Limited
License Number: 0230583
License Date: 1999-12-15
License Status: Issued
Spud Date: 2000-01-18
Final Drill Date: 2000-01-21
Well Total Depth: 661.00 m
Surface Hole Latitude: 55.164976
Surface Hole Longitude: -114.132591

For data sources see[1][2]

Well History

Date Event
1999-12-15 Obtained License
2000-01-19 Surface Casing Operation Performed
2000-01-21 Finished Drilling
2000-01-21 Well Log Performed
2000-01-22 Production Casing Operation Performed
2000-01-22 Rig Released
2000-01-22 Well Mode changed to Drilled and Cased
2000-02-04 Perforation Treatment Performed - Jet Perforation
2000-02-04 Well Log Performed
2000-02-06 Perforation Treatment Performed - Jet Perforation
2000-02-06 Well Log Performed
2000-02-07 Perforation Treatment Performed - Jet Perforation
2000-02-07 Well Log Performed
2000-02-10 Well Log Performed
2000-02-13 Perforation Treatment Performed - Cement Squeeze
2000-02-13 Plug Back Performed
2000-03-08 Well Began Production
2000-03-08 Well Fluid changed to Gas
2000-03-08 Well Mode changed to Flowing
2000-03-11 Well Fluid changed to Gas
2000-03-11 Well Mode changed to Flowing
2006-03-11 Well Log Performed
2006-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-03-13 Perforation Treatment Performed - Jet Perforation
2006-03-13 Plug Back Performed
2006-03-13 Well Log Performed
2007-08-01 Well Fluid changed to Gas
2007-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-04 Perforation 588.00 588.50 14
2000-02-06 Perforation 543.90 547.90 14
2000-02-07 Perforation 408.50 410.50 14
2000-02-13 Cement Squeeze 408.00 411.50 0
2006-03-13 Packing Device Capped w/Cement 577.00 585.00 0
2006-03-13 Perforation 399.00 401.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 2526 0.0 0.0 0.0
2001 8041 0.0 0.0 0.0
2002 7639 0.0 0.0 0.0

For data sources see[5]

References