If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0715041904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.158146,"lon":-114.613283,"icon":""}]} |
Location: 00/04-19-071-04W5/0 | |
Location Alias: 00/04-19-71-04 W5M | |
Location Alias 2: 00/04-19-071-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 071 | |
Meridian: 5 | |
Range: 04 | |
Section: 19 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: CARDINAL MITSUE 4-19-71-4 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0028429 | |
License Date: 1965-06-18 | |
License Status: Suspension | |
Spud Date: 1965-06-23 | |
Final Drill Date: 1965-07-08 | |
Well Total Depth: 1894.30 m | |
Surface Hole Latitude: 55.158146 | |
Surface Hole Longitude: -114.613283 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-06-18 | Obtained License |
1965-06-24 | Lost Circulation Occurred |
1965-06-30 | Lost Circulation Occurred |
1965-07-08 | Finished Drilling |
1965-07-08 | Well Mode changed to Drilled and Cased |
1965-07-09 | Production Casing Operation Performed |
1965-07-25 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1965-07-25 | Perforation Treatment Performed - Selective Bullet Perforations |
1965-07-31 | Well Began Production |
1965-07-31 | Well Fluid changed to Crude Oil |
1965-07-31 | Well Mode changed to Flowing |
1969-12-23 | Perforation Treatment Performed - Jet Perforation |
1969-12-23 | Well Fluid changed to Crude Oil |
1969-12-23 | Well Mode changed to Pumping |
1973-10-11 | Perforation Treatment Performed - Cement Squeeze |
1973-10-15 | Perforation Treatment Performed - Jet Perforation |
1988-05-01 | Well Fluid changed to Crude Oil |
1988-05-01 | Well Mode changed to Suspended |
1991-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-05-30 | Plug Back Performed |
1991-05-30 | Well Fluid changed to Crude Oil |
1991-05-30 | Well Mode changed to Abandoned Zone |
1995-09-08 | Perforation Treatment Performed - Cement Plug |
1995-09-08 | Perforation Treatment Performed - Jet Perforation |
1995-09-08 | Perforation Treatment Performed - Remedial Casing |
1995-09-08 | Well Fluid changed to Crude Oil |
1995-09-08 | Well Mode changed to Abandoned and Re-entered |
1995-09-20 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-07-25 | Hydra Jet Perforation | 1864.80 | 1866.00 | 0 |
1995-09-08 | Remedial Casing Cementing | 224.00 | 224.30 | 0 |
1995-09-08 | Cement Plug | 166.00 | 224.30 | 0 |
1965-07-25 | Hydra Jet Perforation | 1865.40 | 1865.40 | 0 |
1965-07-25 | Selective Bullet Perforations | 1864.20 | 1865.40 | 0 |
1969-12-23 | Perforation | 1867.50 | 1868.40 | 7 |
1969-12-23 | Perforation | 1869.90 | 1870.90 | 7 |
1973-10-11 | Cement Squeeze | 1864.80 | 1866.90 | 0 |
1973-10-15 | Perforation | 1864.80 | 1866.00 | 7 |
1991-05-30 | Packing Device Capped w/Cement | 1853.80 | 1853.80 | 0 |
1995-09-08 | Perforation | 224.00 | 224.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 3516 | 0.0 | 0.0 | 0.0 |
1968 | 1938 | 0.0 | 0.0 | 0.0 |
1969 | 178 | 0.0 | 0.0 | 0.0 |
1970 | 6474 | 0.0 | 0.0 | 0.0 |
1971 | 7814 | 0.0 | 0.0 | 0.0 |
1972 | 978 | 0.0 | 0.0 | 0.0 |
1973 | 1182 | 0.0 | 0.0 | 0.0 |
1974 | 5170 | 0.0 | 0.0 | 0.0 |
1975 | 5686 | 0.0 | 0.0 | 0.0 |
1976 | 1172 | 0.0 | 0.0 | 0.0 |
1977 | 8049 | 0.0 | 0.0 | 0.0 |
1978 | 6587 | 0.0 | 0.0 | 0.0 |
1979 | 6804 | 0.0 | 0.0 | 0.0 |
1980 | 8258 | 0.0 | 0.0 | 0.0 |
1981 | 7367 | 0.0 | 0.0 | 0.0 |
1982 | 7559 | 0.0 | 0.0 | 0.0 |
1983 | 7512 | 0.0 | 0.0 | 0.0 |
1984 | 7077 | 0.0 | 0.0 | 0.0 |
1985 | 5178 | 0.0 | 0.0 | 0.0 |
1986 | 4559 | 0.0 | 0.0 | 0.0 |
1987 | 3857 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1965-06-24 | Lost Circulation | 170.60 | 170.60 |
1965-06-30 | Lost Circulation | 996.60 | 1085.00 |
For data sources see[6]