0715180902022

Well Details

Well ID: 0715180902022
Loading map...
Location: 02/02-09-071-18W5/2
Location Alias: 02/02-09-71-18 W5M
Location Alias 2: 02/02-09-071-18 W5/02
Country: Canada
Province: Alberta
Township: 071
Meridian: 5
Range: 18
Section: 09
County/Municipality: Big Lakes County
Well Name: LONG RUN SNIPELK 2-9-71-18
Operator Name: Long Run Exploration Ltd.
License Number: 0025983
License Date: 1964-04-14
License Status: Suspension
Spud Date: 1964-03-29
Final Drill Date: 1964-04-17
Well Total Depth: 2642.60 m
Surface Hole Latitude: 55.129321
Surface Hole Longitude: -116.703248

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-04-14 Obtained License
1964-04-17 Finished Drilling
1964-04-17 Well Mode changed to Drilled and Cased
1964-04-19 Production Casing Operation Performed
1964-04-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-04-21 Perforation Treatment Performed - Selective Jet Perforations
1964-09-17 Perforation Treatment Performed - Cement Squeeze
1964-09-18 Perforation Treatment Performed - Jet Perforation
1964-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-04-12 Perforation Treatment Performed - Jet Perforation
1981-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-14 Well Log Performed
1993-03-11 Perforation Treatment Performed - Chemical Squeeze
1993-03-13 Perforation Treatment Performed - Chemical Squeeze
1993-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-17 Perforation Treatment Performed - Cement Squeeze
1997-01-31 Perforation Treatment Performed - Jet Perforation
1997-01-31 Well Log Performed
1997-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-02-07 Plug Back Performed
1997-02-07 Well Log Performed
2000-08-12 Well Log Performed
2000-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-15 Perforation Treatment Performed - Jet Perforation
2000-08-15 Plug Back Performed
2000-08-15 Well Log Performed
2000-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-30 Well Log Performed
2000-10-01 Well Began Injection
2000-10-01 Well Fluid changed to Water
2000-10-01 Well Type changed to Disposal
2002-05-30 Well Log Performed
2002-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-08-30 Well Log Performed
2009-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-20 Plug Back Performed
2009-12-20 Well Fluid changed to Water
2009-12-20 Well Mode changed to Abandoned Zone
2009-12-20 Well Type changed to Disposal
2009-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-04-21 Selective Jet Perforations 2596.90 2597.50 0
1964-09-19 Acid Treatment 2609.10 2610.00 0
1981-04-12 Perforation 2608.80 2609.70 13
1981-04-12 Perforation 2599.30 2602.30 13
1981-04-12 Perforation 2603.00 2604.50 13
1981-04-12 Perforation 2596.60 2597.50 13
1981-04-12 Perforation 2598.10 2598.70 13
1981-04-15 Acid Treatment 2596.60 2610.00 0
1983-11-11 Acid Treatment 2596.60 2610.00 0
1993-03-11 Chemical Squeeze 2596.60 2610.00 0
1993-03-13 Chemical Squeeze 2596.60 2610.00 0
1964-04-21 Selective Jet Perforations 2599.90 2600.20 0
1993-03-23 Acid Treatment 2596.60 2604.50 0
1997-01-17 Cement Squeeze 2596.60 2610.00 0
1997-01-31 Perforation 2614.00 2616.10 18
1997-02-05 Acid Treatment 2614.00 2616.00 0
1997-02-07 Packing Device Capped w/Cement 2579.00 2587.00 0
2000-08-15 Perforation 1420.70 1439.30 11
2000-08-15 Perforation 1445.40 1454.50 11
2000-08-15 Packing Device Capped w/Cement 1597.00 1605.00 0
2000-08-16 Acid Treatment 1420.00 1454.00 0
2002-06-24 Acid Treatment 1420.70 1454.50 0
1964-04-21 Selective Jet Perforations 2604.20 2604.50 0
2003-05-28 Acid Treatment 1420.70 1454.50 0
2009-12-20 Packing Device Capped w/Cement 1404.00 1412.00 0
2009-12-21 Packing Device Capped w/Cement 1311.80 1395.00 0
1964-04-21 Selective Jet Perforations 2609.40 2610.00 0
1964-04-21 Selective Jet Perforations 2610.60 2611.50 0
1964-04-21 Selective Jet Perforations 2613.40 2613.40 0
1964-04-21 Acid Treatment 2596.90 2613.40 0
1964-09-17 Cement Squeeze 2609.40 2613.40 0
1964-09-18 Perforation 2609.10 2610.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]