X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0724180210000

Well Details

Well ID: 0724180210000
Loading map...
Location: 00/10-02-072-18W4/0
Location Alias: 00/10-02-72-18 W4M
Location Alias 2: 00/10-02-072-18 W4/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 4
Range: 18
Section: 02
County/Municipality: Athabasca County
Well Name: RENAISSANCE CALLING LAKE 10-2-72-18
Operator Name: Husky Oil Operations Limited
License Number: 0030081
License Date: 1966-02-22
License Status: Abandoned
Spud Date: 1966-02-24
Final Drill Date: 1966-03-03
Well Total Depth: 499.90 m
Surface Hole Latitude: 55.208269
Surface Hole Longitude: -112.657168

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-22 Obtained License
1966-03-01 Drill Stem Test Performed
1966-03-02 Drill Stem Test Performed
1966-03-03 Drill Stem Test Performed
1966-03-03 Finished Drilling
1966-03-04 Drill Stem Test Performed
1966-03-05 Production Casing Operation Performed
1966-03-06 Perforation Treatment Performed - Bullet Perforation
1966-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-29 Well Mode changed to Drilled and Cased
1969-04-08 Well Began Production
1969-04-08 Well Fluid changed to Gas
1969-04-08 Well Mode changed to Flowing
1986-01-31 Well Fluid changed to Gas
1986-01-31 Well Mode changed to Suspended
1986-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-02-11 Plug Back Performed
1986-02-11 Well Fluid changed to Gas
1986-02-11 Well Mode changed to Abandoned Zone
1986-02-12 Perforation Treatment Performed - Jet Perforation
1986-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-01-30 Plug Back Performed
1999-12-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-03-06 Bullet Perforation 473.40 475.20 13
1966-03-15 Acid Treatment 473.40 475.20 0
1986-02-11 Packing Device Capped w/Cement 469.50 471.00 0
1986-02-12 Perforation 459.00 460.80 14
1986-02-13 Acid Treatment 459.00 460.80 0
1996-01-30 Packing Device Capped w/Cement 463.00 471.00 0
1996-01-30 Packing Device Capped w/Cement 439.00 454.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 5475 0.0 0.0 0.0
1970 2856 0.0 0.0 0.0
1971 8427 0.0 0.0 0.0
1972 8571 0.0 0.0 0.0
1973 2904 0.0 0.0 0.0
1974 3376 0.0 0.0 0.0
1975 5691 0.0 0.0 0.0
1976 6676 0.0 0.0 0.0
1977 6551 0.0 0.0 0.0
1978 3850 0.0 0.0 0.0
1979 2958 0.0 0.0 0.0
1980 3200 0.0 0.0 0.0
1981 7034 0.0 0.0 0.0
1982 8728 0.0 0.0 0.0
1983 6819 0.0 0.0 0.0
1984 8481 0.0 0.0 0.0
1985 2332 0.0 0.0 0.0

For data sources see[5]

References