X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0725041913000

Well Details

Well ID: 0725041913000
Loading map...
Location: 00/13-19-072-04W5/0
Location Alias: 00/13-19-72-04 W5M
Location Alias 2: 00/13-19-072-04 W5/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 5
Range: 04
Section: 19
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: PENN WEST MITSUE 13-19-72-4
Operator Name: Obsidian Energy Ltd.
License Number: 0083043
License Date: 1980-05-27
License Status: RecExempt
Spud Date: 1980-09-04
Final Drill Date: 1980-11-05
Well Total Depth: 2025.00 m
Surface Hole Latitude: 55.264117
Surface Hole Longitude: -114.612834

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-05-27 Obtained License
1980-09-04 Direction Drilling Operation Performed - 98
1980-09-15 Lost Circulation Occurred
1980-09-20 Lost Circulation Occurred
1980-09-30 Lost Circulation Occurred
1980-11-05 Finished Drilling
1980-11-05 Well Mode changed to Drilled and Cased
1980-11-06 Liner Casing Operation Performed
1980-12-10 Perforation Treatment Performed - Jet Perforation
1981-01-03 Well Began Production
1981-01-03 Well Fluid changed to Crude Oil
1981-01-03 Well Mode changed to Flowing
1984-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-15 Well Began Injection
1984-10-15 Well Fluid changed to Water
1984-10-15 Well Type changed to Injection
1993-01-06 Well Log Performed
1993-03-24 Well Fluid changed to Water
1993-03-24 Well Mode changed to Suspended
1993-03-24 Well Type changed to Injection
1994-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-25 Plug Back Performed
1994-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-06-26 Perforation Treatment Performed - Jet Perforation
1994-06-26 Well Log Performed
1994-06-27 Perforation Treatment Performed - Remedial Casing
1994-07-06 Perforation Treatment Performed - Jet Perforation
1994-07-06 Well Log Performed
1994-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-07-07 Perforation Treatment Performed - Cement Plug
1994-07-07 Perforation Treatment Performed - Remedial Casing
1994-07-07 Well Fluid changed to Water
1994-07-07 Well Mode changed to Abandoned
1994-07-07 Well Type changed to Injection
1994-07-28 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1980-09-04 254.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-10 Perforation 1993.00 1999.00 13
1994-07-07 Cement Plug 166.00 200.00 0
1984-09-24 Acid Treatment 1993.00 1999.00 0
1994-06-25 Packing Device Capped w/Cement 929.00 937.00 0
1994-06-26 Packing Device Capped w/Cement 292.00 300.00 0
1994-06-26 Perforation 200.00 201.00 13
1994-06-27 Remedial Casing Cementing 200.00 201.00 0
1994-07-06 Perforation 186.00 187.00 13
1994-07-07 Acid Treatment 186.00 187.00 0
1994-07-07 Remedial Casing Cementing 186.00 187.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 5289 0.0 0.0 0.0
1982 8143 0.0 0.0 0.0
1983 8515 0.0 0.0 0.0
1984 3164 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-09-15 Lost Circulation 803.00 803.00
1980-09-20 Lost Circulation 810.00 810.00
1980-09-30 Lost Circulation 845.00 1089.00

For data sources see[7]

References