X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0725053512000

Well Details

Well ID: 0725053512000
Loading map...
Location: 00/12-35-072-05W5/0
Location Alias: 00/12-35-72-05 W5M
Location Alias 2: 00/12-35-072-05 W5/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 5
Range: 05
Section: 35
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 12-35-72-5
Operator Name: Cardinal Energy Ltd.
License Number: 0026762
License Date: 1964-09-09
License Status: Suspension
Spud Date: 1964-10-08
Final Drill Date: 1964-10-23
Well Total Depth: 1685.80 m
Surface Hole Latitude: 55.281710
Surface Hole Longitude: -114.664571

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-09-09 Obtained License
1964-10-23 Finished Drilling
1964-10-23 Well Mode changed to Drilled and Cased
1964-10-24 Production Casing Operation Performed
1964-11-26 Perforation Treatment Performed - Jet Perforation
1964-12-05 Well Began Production
1964-12-05 Well Fluid changed to Crude Oil
1964-12-05 Well Mode changed to Flowing
1970-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-11-28 Well Fluid changed to Crude Oil
1971-11-28 Well Mode changed to Pumping
1972-08-10 Perforation Treatment Performed - Jet Perforation
1973-06-22 Perforation Treatment Performed - Fractured
1985-03-29 Perforation Treatment Performed - Jet Perforation
1985-03-29 Well Log Performed
2006-09-15 Well Fluid changed to Crude Oil
2006-09-15 Well Mode changed to Suspended
2016-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-11-23 Plug Back Performed
2016-11-23 Well Fluid changed to Crude Oil
2016-11-23 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-11-26 Perforation 1663.30 1664.20 7
1970-01-27 Acid Treatment 1663.30 1664.20 0
1972-08-10 Perforation 1663.30 1666.00 7
1973-06-22 Fracture 1663.30 1666.00 0
1985-03-29 Perforation 1659.00 1660.20 13
1985-03-29 Perforation 1660.50 1661.70 13
1985-03-29 Perforation 1663.60 1668.50 13
2016-11-23 Packing Device Capped w/Cement 1646.80 1654.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2248 0.0 0.0 0.0
1968 6580 0.0 0.0 0.0
1969 6174 0.0 0.0 0.0
1970 6984 0.0 0.0 0.0
1971 7376 0.0 0.0 0.0
1972 7976 0.0 0.0 0.0
1973 5177 0.0 0.0 0.0
1974 6779 0.0 0.0 0.0
1975 6629 0.0 0.0 0.0
1976 5538 0.0 0.0 0.0
1977 8409 0.0 0.0 0.0
1978 8487 0.0 0.0 0.0
1979 7330 0.0 0.0 0.0
1980 7115 0.0 0.0 0.0
1981 6040 0.0 0.0 0.0
1982 7147 0.0 0.0 0.0
1983 7560 0.0 0.0 0.0
1984 7944 0.0 0.0 0.0
1985 5008 0.0 0.0 0.0
1986 2304 0.0 0.0 0.0
1987 6495 0.0 0.0 0.0
1988 7059 0.0 0.0 0.0
1989 8269 0.0 0.0 0.0
1990 8364 0.0 0.0 0.0
1991 7889 0.0 0.0 0.0
1992 8025 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8559 0.0 0.0 0.0
1995 7836 0.0 0.0 0.0
1996 8261 0.0 0.0 0.0
1997 6912 0.0 0.0 0.0
1998 8643 0.0 0.0 0.0
1999 8707 0.0 0.0 0.0
2000 8611 0.0 0.0 0.0
2001 8542 0.0 0.0 0.0
2002 8315 0.0 0.0 0.0
2003 8691 0.0 0.0 0.0
2004 7805 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References