X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0725081208000

Well Details

Well ID: 0725081208000
Loading map...
Location: 00/08-12-072-08W5/0
Location Alias: 00/08-12-72-08 W5M
Location Alias 2: 00/08-12-072-08 W5/00
Country: Canada
Province: Alberta
Township: 072
Meridian: 5
Range: 08
Section: 12
County/Municipality: Big Lakes County
Well Name: CVE MOONEY 8-12-72-8
Operator Name: Cenovus Energy Inc.
License Number: 0136251
License Date: 1988-09-09
License Status: Abandoned
Spud Date: 1988-09-14
Final Drill Date: 1988-09-20
Well Total Depth: 1066.00 m
Surface Hole Latitude: 55.218810
Surface Hole Longitude: -115.083818

For data sources see[1][2]

Well History

Date Event
1988-09-09 Obtained License
1988-09-15 Surface Casing Operation Performed
1988-09-20 Finished Drilling
1988-09-20 Well Mode changed to Drilled and Cased
1988-09-21 Drill Stem Test Performed
1988-09-21 Well Log Performed
1988-09-23 Production Casing Operation Performed
1988-09-23 Rig Released
1988-09-27 Well Log Performed
1988-09-28 Perforation Treatment Performed - Jet Perforation
1988-09-29 Perforation Treatment Performed - Jet Perforation
1988-09-29 Well Log Performed
1988-10-29 Well Began Production
1988-10-29 Well Fluid changed to Crude Oil
1988-10-29 Well Mode changed to Pumping
1990-03-02 Perforation Treatment Performed - Jet Perforation
1990-03-02 Well Log Performed
1993-10-02 Well Fluid changed to Crude Oil
1993-10-02 Well Mode changed to Suspended
2004-01-21 Perforation Treatment Performed - Cement Squeeze
2004-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-01-22 Plug Back Performed
2004-01-22 Well Fluid changed to Crude Oil
2004-01-22 Well Mode changed to Abandoned Zone
2004-01-23 Well Abandoned
2004-01-23 Well Fluid changed to Crude Oil
2004-01-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-28 Perforation 916.50 917.50 13
1988-09-29 Perforation 914.00 915.50 13
1990-03-02 Perforation 914.00 915.50 13
1990-03-02 Perforation 916.50 917.50 13
2004-01-21 Cement Squeeze 916.50 917.50 0
2004-01-21 Cement Squeeze 914.00 915.50 0
2004-01-22 Packing Device Capped w/Cement 884.00 892.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1572 0.0 0.0 0.0
1989 4136 0.0 0.0 0.0
1990 5255 0.0 0.0 0.0
1991 7646 0.0 0.0 0.0
1992 7182 0.0 0.0 0.0
1993 2288 0.0 0.0 0.0

For data sources see[5]

References