If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0726091502000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.213312,"lon":-119.264393,"icon":""}]} |
Location: 00/02-15-072-09W6/0 | |
Location Alias: 00/02-15-72-09 W6M | |
Location Alias 2: 00/02-15-072-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 072 | |
Meridian: 6 | |
Range: 09 | |
Section: 15 | |
County/Municipality: County of Grande Prairie No. 1 | |
Well Name: ECA HZ ALBRT 2-15-72-9 | |
Operator Name: Ovintiv Canada ULC | |
License Number: 0466615 | |
License Date: 2014-05-13 | |
License Status: Issued | |
Spud Date: 2014-06-20 | |
Final Drill Date: 2014-07-13 | |
Well Total Depth: 5480.00 m | |
Surface Hole Latitude: 55.213312 | |
Surface Hole Longitude: -119.264393 |
Date | Event |
---|---|
2014-05-13 | Obtained License |
2014-06-22 | Surface Casing Operation Performed |
2014-06-27 | Direction Drilling Operation Performed - Deviate |
2014-06-29 | Direction Drilling Operation Performed - Horizontal |
2014-06-30 | Well Log Performed |
2014-07-01 | Intermediate Casing Operation Performed |
2014-07-13 | Finished Drilling |
2014-07-13 | Well Log Performed |
2014-07-13 | Well Mode changed to Drilled and Cased |
2014-07-14 | Production Casing Operation Performed |
2014-07-17 | Perforation Treatment Performed - Open-Hole Completion |
2014-07-17 | Rig Released |
2014-08-25 | Perforation Treatment Performed - Fractured |
2014-08-25 | Perforation Treatment Performed - Jet Perforation |
2014-08-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-08-26 | Perforation Treatment Performed - Fractured |
2014-08-26 | Perforation Treatment Performed - Jet Perforation |
2014-08-27 | Perforation Treatment Performed - Fractured |
2014-08-27 | Perforation Treatment Performed - Jet Perforation |
2014-08-28 | Perforation Treatment Performed - Fractured |
2014-08-28 | Perforation Treatment Performed - Jet Perforation |
2014-08-29 | Perforation Treatment Performed - Fractured |
2014-08-29 | Perforation Treatment Performed - Jet Perforation |
2014-10-09 | Well Began Production |
2014-10-09 | Well Fluid changed to Gas |
2014-10-09 | Well Mode changed to Flowing |
2017-02-23 | Well Log Performed |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-06-20 | Precision Drilling Corporation | 535 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-06-27 | 2393.00 | Deviate (5 - 79 degrees) |
2014-06-29 | 2735.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-07-17 | Open Hole/Barefoot Completion | 5473.00 | 5480.00 | 0 |
2014-08-25 | Perforation | 4955.00 | 4956.00 | 3 |
2014-08-29 | Perforation | 3042.00 | 3043.00 | 3 |
2014-08-29 | Fracture | 3042.00 | 3145.00 | 0 |
2014-08-29 | Perforation | 3017.00 | 3018.00 | 3 |
2014-08-29 | Perforation | 2991.00 | 2992.00 | 3 |
2014-08-29 | Perforation | 2966.00 | 2967.00 | 3 |
2014-08-29 | Perforation | 2940.00 | 2941.00 | 3 |
2014-08-29 | Perforation | 2915.00 | 2916.00 | 3 |
2014-08-29 | Fracture | 2915.00 | 3018.00 | 0 |
2014-08-29 | Perforation | 2890.00 | 2891.00 | 3 |
2014-08-29 | Perforation | 2865.00 | 2866.00 | 3 |
2014-08-25 | Fracture | 4955.00 | 5058.00 | 0 |
2014-08-29 | Perforation | 2840.00 | 2841.00 | 3 |
2014-08-29 | Perforation | 2815.00 | 2816.00 | 3 |
2014-08-29 | Perforation | 2790.00 | 2791.00 | 3 |
2014-08-29 | Fracture | 2790.00 | 2891.00 | 0 |
2014-08-26 | Perforation | 4929.00 | 4930.00 | 3 |
2014-08-26 | Perforation | 4904.00 | 4905.00 | 3 |
2014-08-26 | Perforation | 4878.00 | 4879.00 | 3 |
2014-08-26 | Perforation | 4853.00 | 4854.00 | 3 |
2014-08-26 | Perforation | 4827.00 | 4828.00 | 3 |
2014-08-26 | Fracture | 4827.00 | 4930.00 | 0 |
2014-08-26 | Perforation | 4802.00 | 4803.00 | 3 |
2014-08-26 | Perforation | 4776.00 | 4777.00 | 3 |
2014-08-25 | Multi-Stage Fracture | 5405.20 | 5418.70 | 0 |
2014-08-26 | Perforation | 4751.00 | 4752.00 | 3 |
2014-08-26 | Perforation | 4725.00 | 4726.00 | 3 |
2014-08-26 | Perforation | 4700.00 | 4701.00 | 3 |
2014-08-26 | Fracture | 4700.00 | 4803.00 | 0 |
2014-08-26 | Perforation | 4674.00 | 4675.00 | 3 |
2014-08-26 | Perforation | 4649.00 | 4650.00 | 3 |
2014-08-26 | Perforation | 4623.00 | 4624.00 | 3 |
2014-08-26 | Perforation | 4598.00 | 4599.00 | 3 |
2014-08-26 | Perforation | 4572.00 | 4573.00 | 3 |
2014-08-26 | Fracture | 4572.00 | 4675.00 | 0 |
2014-08-25 | Multi-Stage Fracture | 5297.90 | 5381.40 | 0 |
2014-08-26 | Perforation | 4547.00 | 4548.00 | 3 |
2014-08-26 | Perforation | 4521.00 | 4522.00 | 3 |
2014-08-27 | Perforation | 4496.00 | 4497.00 | 3 |
2014-08-27 | Perforation | 4470.00 | 4471.00 | 3 |
2014-08-27 | Perforation | 4445.00 | 4446.00 | 3 |
2014-08-27 | Fracture | 4445.00 | 4548.00 | 0 |
2014-08-27 | Perforation | 4419.00 | 4420.00 | 3 |
2014-08-27 | Perforation | 4394.00 | 4395.00 | 3 |
2014-08-27 | Perforation | 4368.00 | 4369.00 | 3 |
2014-08-27 | Perforation | 4343.00 | 4344.00 | 3 |
2014-08-25 | Multi-Stage Fracture | 5190.90 | 5272.20 | 0 |
2014-08-27 | Perforation | 4317.00 | 4318.00 | 3 |
2014-08-27 | Fracture | 4317.00 | 4420.00 | 0 |
2014-08-27 | Perforation | 4292.00 | 4293.00 | 3 |
2014-08-27 | Perforation | 4266.00 | 4267.00 | 3 |
2014-08-27 | Perforation | 4241.00 | 4242.00 | 3 |
2014-08-27 | Perforation | 4215.00 | 4216.00 | 3 |
2014-08-27 | Perforation | 4190.00 | 4191.00 | 3 |
2014-08-27 | Fracture | 4190.00 | 4293.00 | 0 |
2014-08-27 | Perforation | 4164.00 | 4165.00 | 3 |
2014-08-27 | Perforation | 4139.00 | 4140.00 | 3 |
2014-08-25 | Multi-Stage Fracture | 5082.40 | 5164.60 | 0 |
2014-08-27 | Perforation | 4113.00 | 4114.00 | 3 |
2014-08-27 | Perforation | 4088.00 | 4089.00 | 3 |
2014-08-27 | Perforation | 4062.00 | 4063.00 | 3 |
2014-08-27 | Fracture | 4062.00 | 4165.00 | 0 |
2014-08-27 | Perforation | 4037.00 | 4038.00 | 3 |
2014-08-27 | Perforation | 4011.00 | 4012.00 | 3 |
2014-08-27 | Perforation | 3986.00 | 3987.00 | 3 |
2014-08-27 | Perforation | 3960.00 | 3961.00 | 3 |
2014-08-27 | Perforation | 3935.00 | 3936.00 | 3 |
2014-08-27 | Fracture | 3935.00 | 4038.00 | 0 |
2014-08-25 | Perforation | 5057.00 | 5058.00 | 3 |
2014-08-28 | Perforation | 3909.00 | 3910.00 | 3 |
2014-08-28 | Perforation | 3884.00 | 3885.00 | 3 |
2014-08-28 | Perforation | 3858.00 | 3859.00 | 3 |
2014-08-28 | Perforation | 3833.00 | 3834.00 | 3 |
2014-08-28 | Perforation | 3807.00 | 3808.00 | 3 |
2014-08-28 | Fracture | 3807.00 | 3910.00 | 0 |
2014-08-28 | Perforation | 3782.00 | 3783.00 | 3 |
2014-08-28 | Perforation | 3756.00 | 3757.00 | 3 |
2014-08-28 | Perforation | 3731.00 | 3732.00 | 3 |
2014-08-28 | Perforation | 3705.00 | 3706.00 | 3 |
2014-08-25 | Perforation | 5031.00 | 5032.00 | 3 |
2014-08-28 | Perforation | 3680.00 | 3681.00 | 3 |
2014-08-28 | Fracture | 3680.00 | 3783.00 | 0 |
2014-08-28 | Perforation | 3654.00 | 3655.00 | 3 |
2014-08-28 | Perforation | 3629.00 | 3630.00 | 3 |
2014-08-28 | Perforation | 3603.00 | 3604.00 | 3 |
2014-08-28 | Perforation | 3578.00 | 3579.00 | 3 |
2014-08-28 | Perforation | 3552.00 | 3553.00 | 3 |
2014-08-28 | Fracture | 3552.00 | 3655.00 | 0 |
2014-08-28 | Perforation | 3527.00 | 3528.00 | 3 |
2014-08-28 | Perforation | 3501.00 | 3502.00 | 3 |
2014-08-25 | Perforation | 5006.00 | 5007.00 | 3 |
2014-08-28 | Perforation | 3476.00 | 3477.00 | 3 |
2014-08-28 | Perforation | 3450.00 | 3451.00 | 3 |
2014-08-28 | Perforation | 3425.00 | 3426.00 | 3 |
2014-08-28 | Fracture | 3425.00 | 3528.00 | 0 |
2014-08-28 | Perforation | 3399.00 | 3400.00 | 3 |
2014-08-28 | Perforation | 3374.00 | 3375.00 | 3 |
2014-08-28 | Perforation | 3348.00 | 3349.00 | 3 |
2014-08-28 | Perforation | 3323.00 | 3324.00 | 3 |
2014-08-28 | Perforation | 3297.00 | 3298.00 | 3 |
2014-08-28 | Fracture | 3297.00 | 3400.00 | 0 |
2014-08-25 | Perforation | 4980.00 | 4981.00 | 3 |
2014-08-29 | Perforation | 3272.00 | 3273.00 | 3 |
2014-08-29 | Perforation | 3246.00 | 3247.00 | 3 |
2014-08-29 | Perforation | 3221.00 | 3222.00 | 3 |
2014-08-29 | Perforation | 3195.00 | 3196.00 | 3 |
2014-08-29 | Perforation | 3170.00 | 3171.00 | 3 |
2014-08-29 | Fracture | 3170.00 | 3273.00 | 0 |
2014-08-29 | Perforation | 3144.00 | 3145.00 | 3 |
2014-08-29 | Perforation | 3119.00 | 3120.00 | 3 |
2014-08-29 | Perforation | 3093.00 | 3094.00 | 3 |
2014-08-29 | Perforation | 3068.00 | 3069.00 | 3 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-25 | 2014-08-29 | 2,654 | 15,951 | N/A |
2 | 2014-08-25 | 2014-08-28 | 2,654 | 0 | N/A |
3 | 2014-08-25 | 2014-08-25 | 2,654 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | hydrochloric acid | 7647-01-0 | 100 | 0.7067 | N/A | |||
water | 7732-18-5 | 100 | 42.9479 | N/A | ||||
Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 18.1942 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 2.1562 | N/A | ||
AI-7NR | Trican | Corrosion Inhibitor | modified propargyl alcohol | Trade Secret | 100 | 0.0026 | N/A | |
propargyl alcohol | 107-19-7 | 100 | 0.0026 | N/A | ||||
DF-1 | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0 | N/A | |
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0017 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0565 | N/A | ||||
IC-2 | Trican | Iron Control | sodium erythorbate | 6381-77-7 | 100 | 0.0041 | N/A | |
ASA-60 | Trican | Surfactant | alkylbenzenesulfonic acid | 68584-22-5 | 100 | 0.0071 | N/A | |
dipropylene glycol | 25265-71-8 | 100 | 0.0071 | N/A | ||||
sodium hexyldiphenyl ether sulfonate | 147732-60-3 | 100 | 0.0071 | N/A | ||||
2 | FCB-1 | Trican | Breaker | severely refined mineral oil | Trade Secret | 100 | 0.001 | N/A |
FC-1 | Trican | Surfactant | isopropanol | 67-63-0 | 100 | 0.0188 | N/A | |
N.N.N-dimethyl-1-octadecanamine | 124-28-7 | 100 | 0.0188 | N/A | ||||
N.N.N-dimethyl-1-octadecanamine-HCL | 1613-17-8 | 100 | 0.0188 | N/A | ||||
N.N.N-trimethyl-1-octadecaminium chloride | 112-03-8 | 100 | 0.0188 | N/A | ||||
FC-2 | Trican | Surfactant | organic salt | 7947 | 100 | 0.0158 | N/A | |
water | Not Available | 100 | 0.0158 | N/A | ||||
3 | IC-8 | Trican | Iron Control | 2-mercaptoethanol | 60-24-2 | 100 | 0.0018 | N/A |
cupric chloride | 7447-39-4 | 100 | 0.0018 | N/A | ||||
monoethanolamine | 141-43-5 | 100 | 0.0018 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-08-23 | 2014-08-23 | Municipal Water | 25 |
2014-08-25 | 2014-08-25 | Groundwater - Saline | 2832 |
2014-08-26 | 2014-08-26 | Municipal Water | 30 |
2014-08-26 | 2014-08-26 | Groundwater - Saline | 3661 |
2014-08-27 | 2014-08-27 | Groundwater - Saline | 3010 |
2014-08-28 | 2014-08-28 | Groundwater - Saline | 3509 |
2014-08-29 | 2014-08-29 | Groundwater - Saline | 3394 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 499 | 0.0 | 0.0 | 0.0 |
2015 | 7558 | 0.0 | 0.0 | 0.0 |
2016 | 8560 | 0.0 | 0.0 | 0.0 |
2017 | 7209 | 0.0 | 0.0 | 0.0 |
2018 | 8697 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 338 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-17 | No Incident Encountered | 0.00 | 0.00 |
2014-09-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]