X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0735020212000

Well Details

Well ID: 0735020212000
Loading map...
Location: 00/12-02-073-02W5/0
Location Alias: 00/12-02-73-02 W5M
Location Alias 2: 00/12-02-073-02 W5/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 5
Range: 02
Section: 02
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CNRL ET AL SPUR 12-2-73-2
Operator Name: Canadian Natural Resources Limited
License Number: 0138001
License Date: 1989-01-05
License Status: Abandoned
Spud Date: 1989-01-29
Final Drill Date: 1989-02-01
Well Total Depth: 582.00 m
Surface Hole Latitude: 55.295045
Surface Hole Longitude: -114.201803

For data sources see[1][2]

Well History

Date Event
1989-01-05 Obtained License
1989-01-30 Surface Casing Operation Performed
1989-02-01 Finished Drilling
1989-02-01 Well Log Performed
1989-02-01 Well Mode changed to Drilled and Cased
1989-02-02 Drill Stem Test Performed
1989-02-02 Production Casing Operation Performed
1989-02-02 Well Log Performed
1989-02-03 Rig Released
1989-02-20 Well Log Performed
1989-02-22 Well Log Performed
1989-02-23 Perforation Treatment Performed - Jet Perforation
1990-02-14 Well Log Performed
1990-02-15 Perforation Treatment Performed - Jet Perforation
1990-04-01 Well Began Production
1990-04-01 Well Fluid changed to Gas
1990-04-01 Well Mode changed to Flowing
1998-03-17 Well Log Performed
1998-03-18 Perforation Treatment Performed - Jet Perforation
2002-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-23 Perforation Treatment Performed - Jet Perforation
2002-02-23 Plug Back Performed
2002-02-23 Well Fluid changed to Gas
2002-02-23 Well Log Performed
2002-02-23 Well Mode changed to Abandoned Zone
2002-02-24 Perforation Treatment Performed - Jet Perforation
2002-02-24 Well Log Performed
2002-03-03 Perforation Treatment Performed - Jet Perforation
2011-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-03 Plug Back Performed
2011-03-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-02-23 Perforation 564.10 566.10 13
2011-03-03 Packing Device Capped w/Cement 357.00 365.00 0
1990-02-15 Perforation 560.00 562.00 13
1998-03-18 Perforation 443.50 445.00 14
2002-02-23 Packing Device Capped w/Cement 544.70 552.70 0
2002-02-23 Packing Device Capped w/Cement 428.50 436.50 0
2002-02-23 Perforation 402.00 402.50 17
2002-02-24 Perforation 375.00 376.00 17
2002-03-03 Perforation 379.00 380.00 17
2011-03-03 Packing Device Capped w/Cement 384.00 392.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2429 0.0 0.0 0.0
1991 1815 0.0 0.0 0.0
1992 7562 0.0 0.0 0.0
1993 8601 0.0 0.0 0.0
1994 8690 0.0 0.0 0.0
1995 8601 0.0 0.0 0.0
1996 8632 0.0 0.0 0.0
1997 8669 0.0 0.0 0.0
1998 8366 0.0 0.0 0.0
1999 4663 0.0 0.0 0.0
2000 2236 0.0 0.0 0.0

For data sources see[5]

References