If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0735163310004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.367925,"lon":-116.398752,"icon":""}]} |
Location: 00/10-33-073-16W5/4 | |
Location Alias: 00/10-33-73-16 W5M | |
Location Alias 2: 00/10-33-073-16 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 073 | |
Meridian: 5 | |
Range: 16 | |
Section: 33 | |
County/Municipality: Big Lakes County | |
Well Name: DAYLIGHT HIPR 10-33-73-16 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0094146 | |
License Date: 1981-12-29 | |
License Status: Issued | |
Spud Date: 1982-01-06 | |
Final Drill Date: 1982-01-11 | |
Well Total Depth: 1019.00 m | |
Surface Hole Latitude: 55.367925 | |
Surface Hole Longitude: -116.398752 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1981-12-29 | Obtained License |
1982-01-11 | Finished Drilling |
1982-01-11 | Well Mode changed to Drilled and Cased |
1982-01-12 | Drill Stem Test Performed |
1982-01-13 | Production Casing Operation Performed |
2000-02-18 | Well Log Performed |
2000-02-19 | Perforation Treatment Performed - Jet Perforation |
2000-02-19 | Well Log Performed |
2000-02-20 | Well Log Performed |
2000-02-21 | Perforation Treatment Performed - Jet Perforation |
2000-02-22 | Perforation Treatment Performed - Jet Perforation |
2000-02-22 | Well Log Performed |
2000-02-24 | Perforation Treatment Performed - Jet Perforation |
2000-02-24 | Well Log Performed |
2000-02-25 | Perforation Treatment Performed - Jet Perforation |
2000-02-25 | Well Log Performed |
2000-02-26 | Perforation Treatment Performed - Jet Perforation |
2000-03-01 | Perforation Treatment Performed - Cement Squeeze |
2000-03-01 | Plug Back Performed |
2000-03-03 | Perforation Treatment Performed - Jet Perforation |
2000-03-03 | Well Log Performed |
2000-03-06 | Perforation Treatment Performed - Fractured |
2000-03-07 | Perforation Treatment Performed - Cement Squeeze |
2000-03-07 | Plug Back Performed |
2000-09-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-14 | Plug Back Performed |
2000-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-15 | Perforation Treatment Performed - Jet Perforation |
2000-09-15 | Plug Back Performed |
2000-09-15 | Well Log Performed |
2000-09-15 | Well Mode changed to Drilled and Cased |
2000-10-15 | Well Began Production |
2000-10-15 | Well Fluid changed to Gas |
2000-10-15 | Well Mode changed to Flowing |
2011-09-01 | Well Fluid changed to Gas |
2011-09-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-02-19 | Perforation | 731.00 | 732.00 | 13 |
2000-03-03 | Perforation | 556.50 | 559.00 | 13 |
2000-03-06 | Fracture | 556.50 | 559.00 | 0 |
2000-03-07 | Cement Squeeze | 556.50 | 559.00 | 0 |
2000-09-14 | Packing Device Capped w/Cement | 715.00 | 724.00 | 0 |
2000-09-15 | Packing Device Capped w/Cement | 650.50 | 659.50 | 0 |
2000-09-15 | Packing Device Capped w/Cement | 590.50 | 599.50 | 0 |
2000-09-15 | Perforation | 545.00 | 546.00 | 13 |
2000-02-21 | Perforation | 665.00 | 666.00 | 13 |
2000-02-22 | Perforation | 667.00 | 668.00 | 14 |
2000-02-24 | Perforation | 609.00 | 610.00 | 13 |
2000-02-24 | Perforation | 612.00 | 613.50 | 13 |
2000-02-25 | Perforation | 619.00 | 619.50 | 8 |
2000-02-26 | Perforation | 590.00 | 591.00 | 13 |
2000-02-26 | Perforation | 582.50 | 583.50 | 13 |
2000-03-01 | Cement Squeeze | 582.50 | 591.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 2139 | 0.0 | 0.0 | 0.0 |
2008 | 120 | 0.0 | 0.0 | 0.0 |
For data sources see[5]