If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0736051914002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.343384,"lon":-118.759356,"icon":""}]} |
| Location: 00/14-19-073-05W6/2 | |
| Location Alias: 00/14-19-73-05 W6M | |
| Location Alias 2: 00/14-19-073-05 W6/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 073 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 19 | |
| County/Municipality: Sexsmith | |
| Well Name: PRED CLAIR 14-19-73-5 | |
| Operator Name: Firenze Energy Ltd. | |
| License Number: 0261952 | |
| License Date: 2001-11-16 | |
| License Status: Suspension | |
| Spud Date: 2002-01-07 | |
| Final Drill Date: 2002-01-10 | |
| Well Total Depth: 2032.00 m | |
| Surface Hole Latitude: 55.343384 | |
| Surface Hole Longitude: -118.759356 |
| Date | Event |
|---|---|
| 2001-11-16 | Obtained License |
| 2002-01-10 | Finished Drilling |
| 2002-01-10 | Rig Released |
| 2002-01-10 | Well Mode changed to Drilled and Cased |
| 2002-01-11 | Perforation Treatment Performed - Jet Perforation |
| 2002-08-18 | Well Began Production |
| 2002-08-18 | Well Fluid changed to Crude Oil |
| 2002-08-18 | Well Mode changed to Pumping |
| 2003-12-20 | Perforation Treatment Performed - Cement Squeeze |
| 2003-12-22 | Perforation Treatment Performed - Jet Perforation |
| 2003-12-22 | Well Log Performed |
| 2004-01-01 | Well Fluid changed to Water |
| 2004-01-01 | Well Type changed to Source |
| 2013-06-30 | Well Fluid changed to Water |
| 2013-06-30 | Well Mode changed to Suspended |
| 2013-06-30 | Well Type changed to Source |
| 2013-10-01 | Well Fluid changed to Water |
| 2013-10-01 | Well Type changed to Source |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2002-01-11 | Perforation | 777.00 | 779.00 | 17 |
| 2003-12-20 | Cement Squeeze | 777.00 | 779.00 | 0 |
| 2003-12-22 | Perforation | 1154.00 | 1160.00 | 13 |
| 2003-12-22 | Perforation | 1149.00 | 1154.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2002 | 3070 | 0.0 | 0.0 | 0.0 |
| 2003 | 2251 | 0.0 | 0.0 | 0.0 |
| 2004 | 8395 | 0.0 | 0.0 | 0.0 |
| 2005 | 7195 | 0.0 | 0.0 | 0.0 |
| 2006 | 6406 | 0.0 | 0.0 | 0.0 |
| 2007 | 2208 | 0.0 | 0.0 | 0.0 |
| 2008 | 6887 | 0.0 | 0.0 | 0.0 |
| 2009 | 504 | 0.0 | 0.0 | 0.0 |
| 2013 | 2184 | 0.0 | 0.0 | 0.0 |
| 2014 | 8714 | 0.0 | 0.0 | 0.0 |
| 2015 | 5807 | 0.0 | 0.0 | 0.0 |
| 2016 | 4425 | 0.0 | 0.0 | 0.0 |
For data sources see[5]