X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0736112509000

Well Details

Well ID: 0736112509000
Loading map...
Location: 00/09-25-073-11W6/0
Location Alias: 00/09-25-73-11 W6M
Location Alias 2: 00/09-25-073-11 W6/00
Country: Canada
Province: Alberta
Township: 073
Meridian: 6
Range: 11
Section: 25
County/Municipality: County of Grande Prairie No. 1
Well Name: BANKENO ET AL KNOPCIK 9-25-73-11
Operator Name: Canadian Natural Resources Limited
License Number: 0103643
License Date: 1983-10-20
License Status: Issued
Spud Date: 1983-11-15
Final Drill Date: 1983-12-05
Well Total Depth: 2435.00 m
Surface Hole Latitude: 55.355588
Surface Hole Longitude: -119.544187

For data sources see[1][2]

Well History

Date Event
1983-10-20 Obtained License
1983-11-27 Drill Stem Test Performed
1983-12-01 Well Log Performed
1983-12-05 Finished Drilling
1983-12-05 Well Mode changed to Drilled and Cased
1983-12-06 Well Log Performed
1983-12-08 Production Casing Operation Performed
1983-12-30 Perforation Treatment Performed - Jet Perforation
1984-01-03 Perforation Treatment Performed - Fractured
1984-03-07 Well Began Production
1984-03-07 Well Fluid changed to Gas
1984-03-07 Well Mode changed to Flowing
1984-11-10 Well Log Performed
1996-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-13 Perforation Treatment Performed - Jet Perforation
1996-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-14 Perforation Treatment Performed - Cement Squeeze
1996-02-18 Perforation Treatment Performed - Jet Perforation
1996-02-19 Perforation Treatment Performed - Cement Squeeze
1996-02-23 Perforation Treatment Performed - Jet Perforation
1996-02-26 Perforation Treatment Performed - Fractured
1996-03-25 Well Fluid changed to Gas
1996-03-25 Well Mode changed to Flowing
1999-01-01 Well Structure changed to Commingled
1999-01-02 Well Fluid changed to Gas
1999-01-02 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-12-30 Perforation 2067.00 2071.00 13
1996-02-19 Cement Squeeze 1816.50 1826.30 0
1996-02-23 Perforation 1804.00 1807.00 17
1996-02-26 Fracture 1804.00 1807.00 0
1984-01-03 Fracture 2067.00 2071.00 0
1996-02-08 Acid Treatment 2067.00 2071.00 0
1996-02-13 Perforation 1814.50 1814.80 24
1996-02-13 Perforation 1794.50 1794.80 24
1996-02-14 Acid Treatment 1794.50 1814.80 0
1996-02-14 Cement Squeeze 1794.50 1814.80 0
1996-02-18 Perforation 1816.50 1816.80 24
1996-02-18 Perforation 1826.00 1826.30 24

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 3705 0.0 0.0 0.0
1985 5641 0.0 0.0 0.0
1986 3563 0.0 0.0 0.0
1987 7417 0.0 0.0 0.0
1988 6526 0.0 0.0 0.0
1989 6925 0.0 0.0 0.0
1990 7581 0.0 0.0 0.0
1991 7636 0.0 0.0 0.0
1992 8151 0.0 0.0 0.0
1993 7932 0.0 0.0 0.0
1994 8112 0.0 0.0 0.0
1995 7089 0.0 0.0 0.0
1996 6900 0.0 0.0 0.0
1997 8604 0.0 0.0 0.0
1998 6421 0.0 0.0 0.0
1999 8437 0.0 0.0 0.0
2000 8266 0.0 0.0 0.0
2001 8099 0.0 0.0 0.0
2002 8687 0.0 0.0 0.0
2003 8168 0.0 0.0 0.0
2004 7822 0.0 0.0 0.0
2005 6147 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 6119 0.0 0.0 0.0
2008 6176 0.0 0.0 0.0
2009 8681 0.0 0.0 0.0
2010 7927 0.0 0.0 0.0
2011 8543 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 7151 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8592 0.0 0.0 0.0
2018 6096 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References