If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0744252013005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.427063,"lon":-113.85631,"icon":""}]} |
| Location: 00/13-20-074-25W4/5 | |
| Location Alias: 00/13-20-74-25 W4M | |
| Location Alias 2: 00/13-20-074-25 W4/05 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 074 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 20 | |
| County/Municipality: Municipal District of Lesser Slave River No. 124 | |
| Well Name: SPL 9-24 HZ MARTENH 13-20-74-25 | |
| Operator Name: Spur Petroleum Ltd. | |
| License Number: 0487528 | |
| License Date: 2018-01-04 | |
| License Status: Amended | |
| Spud Date: 2018-07-11 | |
| Final Drill Date: 2018-07-24 | |
| Well Total Depth: 2828.00 m | |
| Surface Hole Latitude: 55.427063 | |
| Surface Hole Longitude: -113.856310 |
| Date | Event |
|---|---|
| 2018-01-04 | Obtained License |
| 2018-07-12 | Surface Casing Operation Performed |
| 2018-07-13 | Direction Drilling Operation Performed - Deviate |
| 2018-07-16 | Direction Drilling Operation Performed - Horizontal |
| 2018-07-16 | Intermediate Casing Operation Performed |
| 2018-07-22 | Direction Drilling Operation Performed - Horizontal |
| 2018-07-23 | Direction Drilling Operation Performed - Horizontal |
| 2018-07-24 | Finished Drilling |
| 2018-07-24 | Well Log Performed |
| 2018-07-24 | Well Structure changed to Drain |
| 2018-07-26 | Perforation Treatment Performed - Open-Hole Completion |
| 2018-07-26 | Rig Released |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2018-07-13 | 325.80 | Deviate (5 - 79 degrees) |
| 2018-07-16 | 854.80 | Horizontal |
| 2018-07-22 | 989.00 | Horizontal |
| 2018-07-23 | 1067.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-07-26 | Open Hole/Barefoot Completion | 1067.00 | 2828.00 | 0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-07-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]