X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0745050103000

Well Details

Well ID: 0745050103000
Loading map...
Location: 00/03-01-074-05W5/0
Location Alias: 00/03-01-74-05 W5M
Location Alias 2: 00/03-01-074-05 W5/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 5
Range: 05
Section: 01
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 3-1-74-5
Operator Name: Cardinal Energy Ltd.
License Number: 0139339
License Date: 1989-03-16
License Status: Abandoned
Spud Date: 1989-03-26
Final Drill Date: 1989-04-05
Well Total Depth: 1655.00 m
Surface Hole Latitude: 55.376217
Surface Hole Longitude: -114.634082

For data sources see[1][2]

Well History

Date Event
1989-03-16 Obtained License
1989-03-27 Surface Casing Operation Performed
1989-04-05 Finished Drilling
1989-04-05 Well Mode changed to Drilled and Cased
1989-04-06 Well Log Performed
1989-04-07 Production Casing Operation Performed
1989-04-07 Rig Released
1989-05-16 Well Log Performed
1989-05-21 Perforation Treatment Performed - Jet Perforation
1989-05-21 Well Log Performed
1989-06-01 Well Began Production
1989-06-01 Well Fluid changed to Crude Oil
1989-06-01 Well Mode changed to Pumping
1989-06-16 Perforation Treatment Performed - Fractured
1991-12-31 Well Fluid changed to Crude Oil
1991-12-31 Well Mode changed to Suspended
1992-10-09 Well Began Injection
1992-10-09 Well Fluid changed to Water
1992-10-09 Well Type changed to Injection
1996-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-14 Plug Back Performed
1996-03-18 Well Abandoned
1996-03-18 Well Fluid changed to Water
1996-03-18 Well Mode changed to Abandoned
1996-03-18 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-05-21 Perforation 1626.50 1629.80 13
1989-06-16 Fracture 1626.50 1629.80 0
1996-03-14 Packing Device Capped w/Cement 1483.00 1491.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 5153 0.0 0.0 0.0
1990 2952 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References