X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0745050612000

Well Details

Well ID: 0745050612000
Loading map...
Location: 00/12-06-074-05W5/0
Location Alias: 00/12-06-74-05 W5M
Location Alias 2: 00/12-06-074-05 W5/00
Country: Canada
Province: Alberta
Township: 074
Meridian: 5
Range: 05
Section: 06
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 12-6-74-5
Operator Name: Cardinal Energy Ltd.
License Number: 0029579
License Date: 1965-12-09
License Status: Suspension
Spud Date: 1965-12-11
Final Drill Date: 1965-12-26
Well Total Depth: 1801.40 m
Surface Hole Latitude: 55.383003
Surface Hole Longitude: -114.768341

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-12-09 Obtained License
1965-12-26 Finished Drilling
1965-12-26 Well Mode changed to Drilled and Cased
1965-12-28 Production Casing Operation Performed
1966-01-21 Perforation Treatment Performed - Bullet Perforation
1966-01-22 Well Began Production
1966-01-22 Well Fluid changed to Crude Oil
1966-01-22 Well Mode changed to Flowing
1967-04-10 Well Fluid changed to Crude Oil
1967-04-10 Well Mode changed to Pumping
1974-02-05 Perforation Treatment Performed - Jet Perforation
1976-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-02-01 Perforation Treatment Performed - Fractured
2004-03-30 Perforation Treatment Performed - Jet Perforation
2019-04-01 Well Fluid changed to Crude Oil
2019-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-01-21 Bullet Perforation 1674.90 1675.50 7
2004-03-30 Perforation 1674.90 1675.50 14
2004-03-30 Perforation 1678.20 1680.70 14
1966-01-21 Bullet Perforation 1678.20 1680.70 7
1974-02-05 Perforation 1675.50 1676.10 7
1974-02-05 Perforation 1676.70 1678.20 7
1974-02-05 Perforation 1678.20 1680.40 3
1974-02-05 Perforation 1680.70 1683.40 7
1976-01-27 Acid Treatment 1674.90 1683.40 0
1976-02-01 Acid Treatment 1674.90 1683.40 0
1976-02-01 Fracture 1674.90 1683.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 4872 0.0 0.0 0.0
1968 2880 0.0 0.0 0.0
1975 7913 0.0 0.0 0.0
1976 6276 0.0 0.0 0.0
1977 6262 0.0 0.0 0.0
1978 5234 0.0 0.0 0.0
1979 6242 0.0 0.0 0.0
1980 4453 0.0 0.0 0.0
1981 7493 0.0 0.0 0.0
1982 6673 0.0 0.0 0.0
1983 6486 0.0 0.0 0.0
1984 888 0.0 0.0 0.0
1985 3480 0.0 0.0 0.0
1986 3360 0.0 0.0 0.0
1987 3620 0.0 0.0 0.0
1989 5538 0.0 0.0 0.0
1990 8226 0.0 0.0 0.0
1991 7825 0.0 0.0 0.0
1992 7214 0.0 0.0 0.0
1993 5465 0.0 0.0 0.0
1994 7819 0.0 0.0 0.0
1995 7633 0.0 0.0 0.0
1996 7480 0.0 0.0 0.0
1997 6791 0.0 0.0 0.0
1998 8054 0.0 0.0 0.0
1999 8580 0.0 0.0 0.0
2000 7752 0.0 0.0 0.0
2001 7476 0.0 0.0 0.0
2002 8016 0.0 0.0 0.0
2003 7704 0.0 0.0 0.0
2004 5256 0.0 0.0 0.0
2005 8436 0.0 0.0 0.0
2006 6288 0.0 0.0 0.0
2007 6520 0.0 0.0 0.0
2008 8129 0.0 0.0 0.0
2009 8723 0.0 0.0 0.0
2010 8079 0.0 0.0 0.0
2011 5652 0.0 0.0 0.0
2012 8591 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8723 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8699 0.0 0.0 0.0
2017 3095 0.0 0.0 0.0

For data sources see[5]

References