If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0755050713023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.481293,"lon":-114.752629,"icon":""}]} |
Location: 02/13-07-075-05W5/3 | |
Location Alias: 02/13-07-75-05 W5M | |
Location Alias 2: 02/13-07-075-05 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 075 | |
Meridian: 5 | |
Range: 05 | |
Section: 07 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: EXALL 102 HZ MITSUE 13-7-75-5 | |
Operator Name: Aeneid Exploration Inc. | |
License Number: 0421300 | |
License Date: 2010-06-21 | |
License Status: Suspension | |
Spud Date: 2010-09-12 | |
Final Drill Date: 2010-10-17 | |
Well Total Depth: 2912.00 m | |
Surface Hole Latitude: 55.481293 | |
Surface Hole Longitude: -114.752629 |
Date | Event |
---|---|
2010-06-21 | Obtained License |
2010-09-25 | Well Log Performed |
2010-10-13 | Direction Drilling Operation Performed - Horizontal |
2010-10-17 | Finished Drilling |
2010-10-17 | Well Mode changed to Drilled and Cased |
2010-10-18 | Well Log Performed |
2010-10-20 | Production Casing Operation Performed |
2010-10-22 | Rig Released |
2010-11-30 | Perforation Treatment Performed - Jet Perforation |
2010-12-06 | Perforation Treatment Performed - Jet Perforation |
2010-12-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2010-12-15 | Perforation Treatment Performed - Jet Perforation |
2010-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-09-14 | Perforation Treatment Performed - Cement Squeeze |
2011-10-03 | Perforation Treatment Performed - Jet Perforation |
2012-02-27 | Perforation Treatment Performed - Jet Perforation |
2012-03-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-04-01 | Well Began Production |
2012-04-01 | Well Fluid changed to Water |
2012-04-01 | Well Type changed to Source |
2012-04-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-04-04 | Plug Back Performed |
2012-04-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-04-07 | Plug Back Performed |
2012-04-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-04-08 | Plug Back Performed |
2012-04-09 | Perforation Treatment Performed - Jet Perforation |
2015-03-24 | Well Fluid changed to Water |
2015-03-24 | Well Mode changed to Suspended |
2015-03-24 | Well Type changed to Source |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-10-13 | 2291.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-11-30 | Perforation | 1130.00 | 1136.00 | 17 |
2010-12-18 | Acid Treatment | 1009.00 | 1016.00 | 0 |
2011-09-14 | Cement Squeeze | 983.00 | 991.00 | 0 |
2011-09-14 | Cement Squeeze | 1000.00 | 1005.00 | 0 |
2011-09-14 | Cement Squeeze | 1009.00 | 1016.00 | 0 |
2011-09-14 | Cement Squeeze | 1099.00 | 1111.00 | 0 |
2011-09-14 | Cement Squeeze | 1115.00 | 1119.00 | 0 |
2011-09-14 | Cement Squeeze | 1130.00 | 1136.00 | 0 |
2011-10-03 | Perforation | 2861.00 | 2863.00 | 7 |
2012-02-27 | Perforation | 1130.00 | 1135.00 | 17 |
2012-03-05 | Acid Treatment | 1130.00 | 1135.00 | 0 |
2010-11-30 | Perforation | 1115.00 | 1119.00 | 17 |
2012-04-04 | Packing Device Capped w/Cement | 2842.00 | 2850.00 | 0 |
2012-04-07 | Packing Device Capped w/Cement | 1106.00 | 1114.00 | 0 |
2012-04-08 | Packing Device Capped w/Cement | 1087.00 | 1095.00 | 0 |
2012-04-08 | Packing Device Capped w/Cement | 967.00 | 975.00 | 0 |
2012-04-09 | Perforation | 780.00 | 786.00 | 17 |
2012-04-09 | Perforation | 770.00 | 776.00 | 17 |
2012-04-09 | Perforation | 754.00 | 760.00 | 17 |
2012-04-09 | Perforation | 745.00 | 750.00 | 17 |
2010-12-06 | Perforation | 1099.00 | 1111.00 | 17 |
2010-12-12 | Acid Treatment | 1099.00 | 1111.00 | 0 |
2010-12-15 | Perforation | 983.00 | 991.00 | 17 |
2010-12-15 | Perforation | 1000.00 | 1005.00 | 17 |
2010-12-15 | Perforation | 1009.00 | 1016.00 | 17 |
2010-12-18 | Acid Treatment | 983.00 | 991.00 | 0 |
2010-12-18 | Acid Treatment | 1000.00 | 1005.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 2754 | 0.0 | 0.0 | 0.0 |
2013 | 3043 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-04-08 | No Incident Encountered | 0.00 | 0.00 |
2012-04-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]