X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0755142716000

Well Details

Well ID: 0755142716000
Loading map...
Location: 00/16-27-075-14W5/0
Location Alias: 00/16-27-75-14 W5M
Location Alias 2: 00/16-27-075-14 W5/00
Country: Canada
Province: Alberta
Township: 075
Meridian: 5
Range: 14
Section: 27
County/Municipality: Big Lakes County
Well Name: DAYLIGHT GROUARD 16-27-75-14
Operator Name: Whitecap Resources Inc.
License Number: 0239864
License Date: 2000-07-19
License Status: Suspension
Spud Date: 2000-07-21
Final Drill Date: 2000-07-24
Well Total Depth: 815.00 m
Surface Hole Latitude: 55.531393
Surface Hole Longitude: -116.077230

For data sources see[1][2]

Well History

Date Event
2000-07-19 Obtained License
2000-07-22 Surface Casing Operation Performed
2000-07-24 Finished Drilling
2000-07-24 Well Log Performed
2000-07-25 Production Casing Operation Performed
2000-07-25 Rig Released
2000-07-25 Well Mode changed to Drilled and Cased
2000-08-25 Perforation Treatment Performed - Jet Perforation
2000-08-25 Well Log Performed
2000-08-27 Plug Back Performed
2000-08-31 Perforation Treatment Performed - Jet Perforation
2000-08-31 Well Log Performed
2000-08-31 Well Mode changed to Drilled and Cased
2000-09-18 Well Began Production
2000-09-18 Well Fluid changed to Gas
2000-09-18 Well Mode changed to Flowing
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Suspended
2020-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-01 Plug Back Performed
2020-03-01 Well Fluid changed to Gas
2020-03-01 Well Mode changed to Abandoned Zone
2020-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-02 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-08-25 Perforation 765.00 766.00 14
2000-08-25 Perforation 767.00 768.00 14
2000-08-25 Perforation 769.00 770.00 14
2000-08-25 Perforation 464.00 465.00 14
2000-08-25 Perforation 462.00 463.00 14
2000-08-31 Perforation 655.50 656.50 14
2020-03-01 Packing Device Capped w/Cement 746.00 755.00 0
2020-03-01 Packing Device Capped w/Cement 637.00 646.00 0
2020-03-02 Packing Device Capped w/Cement 445.00 454.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 2517 0.0 0.0 0.0
2001 8735 0.0 0.0 0.0
2002 8725 0.0 0.0 0.0
2003 8678 0.0 0.0 0.0
2004 8709 0.0 0.0 0.0
2005 7425 0.0 0.0 0.0
2006 8365 0.0 0.0 0.0
2007 8171 0.0 0.0 0.0
2008 8407 0.0 0.0 0.0
2009 8360 0.0 0.0 0.0
2010 8179 0.0 0.0 0.0
2011 6067 0.0 0.0 0.0
2012 457 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-03-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References