X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0755151607003

Well Details

Well ID: 0755151607003
Loading map...
Location: 00/07-16-075-15W5/3
Location Alias: 00/07-16-75-15 W5M
Location Alias 2: 00/07-16-075-15 W5/03
Country: Canada
Province: Alberta
Township: 075
Meridian: 5
Range: 15
Section: 16
County/Municipality: Big Lakes County
Well Name: DAYLIGHT GROUARD 7-16-75-15
Operator Name: Cardinal Energy Ltd.
License Number: 0170157
License Date: 1994-09-06
License Status: Suspension
Spud Date: 1994-09-11
Final Drill Date: 1994-09-15
Well Total Depth: 819.00 m
Surface Hole Latitude: 55.494955
Surface Hole Longitude: -116.258585

For data sources see[1][2]

Well History

Date Event
1994-09-06 Obtained License
1994-09-12 Surface Casing Operation Performed
1994-09-15 Finished Drilling
1994-09-15 Lost Circulation Occurred
1994-09-15 Well Log Performed
1994-09-15 Well Mode changed to Drilled and Cased
1994-09-16 Well Log Performed
1994-09-17 Drill Stem Test Performed
1994-09-18 Drill Stem Test Performed
1994-09-19 Plug Back Performed
1994-09-20 Drill Stem Test Performed
1994-09-21 Production Casing Operation Performed
1994-09-22 Rig Released
1994-10-27 Well Log Performed
1994-10-29 Perforation Treatment Performed - Jet Perforation
1994-10-29 Well Log Performed
1994-10-30 Perforation Treatment Performed - Jet Perforation
1995-10-17 Well Log Performed
1995-10-19 Well Log Performed
1995-10-20 Perforation Treatment Performed - Chemical Squeeze
1995-10-21 Perforation Treatment Performed - Jet Perforation
1999-02-04 Well Log Performed
1999-02-06 Perforation Treatment Performed - Jet Perforation
1999-02-07 Perforation Treatment Performed - Fractured
1999-02-07 Well Log Performed
1999-02-09 Perforation Treatment Performed - Fractured
1999-02-21 Perforation Treatment Performed - Jet Perforation
1999-02-21 Well Log Performed
2002-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-06-24 Perforation Treatment Performed - Cement Squeeze
2008-06-26 Perforation Treatment Performed - Cement Squeeze
2008-07-02 Perforation Treatment Performed - Jet Perforation
2018-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-29 Perforation 734.00 736.00 14
1999-02-21 Perforation 734.00 738.00 13
2002-06-01 Acid Treatment 734.00 738.00 0
2008-06-24 Cement Squeeze 765.50 766.50 0
2008-06-24 Cement Squeeze 761.00 763.00 0
2008-06-24 Cement Squeeze 743.00 745.00 0
2008-06-26 Cement Squeeze 734.00 736.00 0
2008-07-02 Perforation 776.00 778.00 17
2018-10-03 Packing Device Capped w/Cement 719.00 727.00 0
1994-10-30 Perforation 786.00 787.00 14
1995-10-20 Chemical Squeeze 734.00 736.00 0
1995-10-21 Perforation 776.00 778.00 13
1999-02-06 Perforation 743.00 745.00 13
1999-02-06 Perforation 761.00 763.00 13
1999-02-06 Perforation 765.50 766.50 13
1999-02-07 Fracture 743.00 766.50 0
1999-02-09 Fracture 761.00 766.50 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1994-09-15 Lost Circulation 819.00 819.00
1995-10-18 No Incident Encountered 0.00 0.00
2017-10-04 No Incident Encountered 0.00 0.00
2008-07-04 No Incident Encountered 0.00 0.00
2018-10-04 No Incident Encountered 0.00 0.00

For data sources see[5]

References